Fiberhub - Las Vegas

Latest Podcast
1110 Palms Airport Drive
Operational
Fully operational facility
Operated by:

Fiberhub - Las Vegas

░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

SAS-70 / SSAE16 Type II Certified

Map and Nearby Locations:

1110 Palms Airport Drive ( Suite 110 )
Fiberhub Sites
Nearby Facilities

Sites within 15 miles of Fiberhub - Las Vegas

Distance Site About
0.39 miles ColoXchange Las Vegas
0.43 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
0.62 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
2.91 miles Lumen: Las Vegas 3
3.79 miles Verizon: 2240 Corporate Cir
4.04 miles Switch Las Vegas 7
4.04 miles Contegix Las Vegas
4.04 miles Hyperscale Data Center Request Dataset
4.06 miles Switch Las Vegas 12
4.09 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
4.19 miles Switch Edge 1
4.27 miles Switch Las Vegas 8
4.28 miles Switch Las Vegas 11
4.42 miles Switch Las Vegas 10
4.43 miles Switch Las Vegas 9
4.70 miles Switch: Las Vegas 15
6.29 miles ISP.Net DC2
6.32 miles Switch Las Vegas 5
6.39 miles Lumen: Las Vegas 2
6.47 miles ISP.Net DC1
6.49 miles Switch Las Vegas 2
7.10 miles Flexential Carson I & II
7.16 miles Hyperscale Data Center Request Dataset
7.29 miles Edged Energy: Las Vegas LAS01
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
8.65 miles Switch: Jones Boulevard Campus
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
8.65 miles Switch: Jones 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
11.84 miles Lumen: Las Vegas (1 Aerojet)
12.75 miles Flexential Las Vegas (Lone Mountain)
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest. AwardedTier IV Design Certification by the Uptime Institute for the design documents 3,000 tons redundant, fault-tolerant cooling capacity
15.00 miles Novva Las Vegas
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
15.00 miles Townsite Solar 2: Boulder City
Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada.

Fiberhub - Las Vegas Data Center Photos (See all)

Operating Company

Operated by:

Fiberhub is a provider of Colocation, IP Transit, Disaster Recovery, and Managed IT Services

5
Facilities
1
Markets
7MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?