Novva Las Vegas

Latest Podcast 6115 Nicco Way
OperationalPlanned
Operational with future phases planned
Operated by:

Novva Las Vegas

Site was first built in 2023 and has expansions through 2028
PUE: 1.3
Lot Size: 20 acres
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.

Data center specifications:


  • Land Area: 20 Acres
  • Buildings: Single Story, Concrete Tilt-Up Exterior Walls with Interior Steel Columns and Truss with Sheathing Roof Deck
  • Total Building Area: 246,328 SQ FT
  • Utility Power: 100 MW Owner Substation`
  • UPS: 1500 KW Per UPS/ (2) UPS Per Lineup 4=3 Redundancy Blocks Full Build: (6) Total Blocks Distributed Redundant
  • Generators: 3 MW - IT Generator, (8) 3 MW Equipment Generators
  • Power Availability: 120v, 208v, 240v, 480v.
  • PUE: 1.3 Annualized

Map and Nearby Locations

6115 Nicco Way
Novva Data Centers Sites
Nearby Facilities

Novva Las Vegas Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Novva Las Vegas

Distance Site About
3.36 miles Flexential Las Vegas (Lone Mountain)
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest. AwardedTier IV Design Certification by the Uptime Institute for the design documents 3,000 tons redundant, fault-tolerant cooling capacity
4.53 miles Lumen: Las Vegas (1 Aerojet)
7.58 miles Switch: Apex Industrial Park
Switch has acquired a combined 316 acres at Apex Industrial Park in North Las Vegas, Nevada, through two land purchases totaling $180.5 million—including 176 acres acquired in January 2026 for $85.5 million and an additional 140 acres acquired in March 2026 for $95 million. The combined site represents a large-scale landholding for future data center campus development.
8.02 miles Novva: Apex Industrial Park
Novva Data Centers, a US operator, has purchased nearly 205 acres within the North Las Vegas Apex Industrial Park from VanTrust Real Estate.
8.52 miles Edged Energy: Las Vegas LAS01
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
8.63 miles ISP.Net DC1
8.83 miles Switch Las Vegas 2
8.83 miles Flexential Carson I & II
8.88 miles Lumen: Las Vegas 2
8.97 miles Switch Las Vegas 5
9.79 miles ISP.Net DC2
12.02 miles Switch: Jones 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
12.02 miles Switch: Jones Boulevard Campus
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
13.55 miles Lumen: Las Vegas 3
14.92 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
14.97 miles North TowerInterested in this information?Contact us
15.00 miles Fiberhub - Las Vegas
15.38 miles ColoXchange Las Vegas
15.59 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
16.89 miles Verizon: 2240 Corporate Cir
17.14 miles CoreWeave: US West LAS1
17.14 miles Contegix Las Vegas
17.14 miles Switch Las Vegas 7
17.15 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
17.25 miles Switch Las Vegas 12
17.27 miles Switch Edge 1
17.28 miles Switch: Las Vegas 15
17.37 miles Switch Las Vegas 8
17.49 miles Switch Las Vegas 11
17.56 miles Switch Las Vegas 10
17.59 miles Switch Las Vegas 9
19.47 miles Switch: Armory Building 2
The central data center building in Switch’s approved three-building Armory Campus development.
19.51 miles Switch: Armory Building 1
The northernmost of three identical data center buildings approved for Switch’s Armory Campus in Enterprise.
19.59 miles Switch: Armory Building 3
The southernmost data center building approved for Switch’s Armory Campus near Las Vegas.

Novva Las Vegas Data Center Photos See all

Inside Novva Data Center Las Vegas.jpeg
Source: Novva Data Center

Operating Company

Operated by:
13
Facilities
6
Markets

News See all

Read Novva Data Centers Acquires 205 Acres of Land in Las Vegas
Novva Data Centers Acquires 205 Acres of Land in Las Vegas

Novva Data Centers Acquires 205 Acres of Land in Las Vegas

August 29, 2025 Novva Data Centers

US operator Novva Data Centers has acquired more land in Las Vegas, Nevada in a $181 million deal which reportedly closed earlier this month. The Las Vegas Review-Journal reports VanTrust Real Estate sold nearly 205 acres in the Apex Industrial Park in North Las Vegas to Novva.According to the...

Read more
Read Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs
Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

July 15, 2024 Las Vegas

The Sphere in Las Vegas, popularly known for its globe shape and LED displays that cover 750,000 sq ft (69,677 sqm) inside and out is reportedly powered by 150 of Nvidia's RTX A6000 GPUs with each having a 48GB memory and maximum power consumption of 300W. “Sphere is captivating audiences not...

Read more
Read 165 acres of land are acquired at auction by Novva DC in Mesa, Arizona
165 acres of land are acquired at auction by Novva DC in Mesa, Arizona

165 acres of land are acquired at auction by Novva DC in Mesa, Arizona

September 01, 2023 Novva Data Centers

Novva Data Centers has won an auction for a piece of land in Mesa, Arizona. This week, the company purchased 165 acres of state land in southeast Mesa for $62.7 million, according to BizJournal and AZCentral. Wes Swenson, the chief executive officer of Novva, was the sole bidder for the plot...

Read more
Read Novva Data Centers announces New facility in Tahoe-Reno region
Novva Data Centers announces New facility in Tahoe-Reno region

Novva Data Centers announces New facility in Tahoe-Reno region

May 08, 2023 Novva Data Centers

Novva Data Centers has announced a new data center in Storey County. Set to go live in late 2024, the facility will span 300,000 sqft on a 20 acre-campus and offering 60 MW of capacity. The data center will have a total of six 10MW data halls and accommodate high-density deployments with hot air...

Read more
Read Novva Data Centers' new data center in North Las Vegas includes water-free cooling and renewable energy
Novva Data Centers' new data center in North Las Vegas includes water-free cooling and renewable energy

Novva Data Centers' new data center in North Las Vegas includes water-free cooling and renewable energy

September 14, 2022 Novva Data Centers

Novva Data Centers has announced plans for a new 275,000 square foot, 100MW data center based in North Las Vegas, Nevada. The facility will be located on a 20-acre campus with an injection of $400 million and will reportedly be built with sustainability in mind. Renewable energy will be sourced...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?