Novva Las Vegas

Latest Podcast
6115 Nicco Way
OperationalPlanned
Operational with future phases planned
Operated by:

Novva Las Vegas

Year Built: 2023
PUE: 1.3
Lot Size: 20 acres
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.

Data center specifications:


  • Land Area: 20 Acres
  • Buildings: Single Story, Concrete Tilt-Up Exterior Walls with Interior Steel Columns and Truss with Sheathing Roof Deck
  • Total Building Area: 246,328 SQ FT
  • Utility Power: 100 MW Owner Substation`
  • UPS: 1500 KW Per UPS/ (2) UPS Per Lineup 4=3 Redundancy Blocks Full Build: (6) Total Blocks Distributed Redundant
  • Generators: 3 MW - IT Generator, (8) 3 MW Equipment Generators
  • Power Availability: 120v, 208v, 240v, 480v.
  • PUE: 1.3 Annualized

Map and Nearby Locations:

6115 Nicco Way
Novva Data Centers Sites
Nearby Facilities

Sites within 15 miles of Novva Las Vegas

Distance Site About
3.36 miles Flexential Las Vegas (Lone Mountain)
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest. AwardedTier IV Design Certification by the Uptime Institute for the design documents 3,000 tons redundant, fault-tolerant cooling capacity
4.53 miles Lumen: Las Vegas (1 Aerojet)
8.02 miles Novva: Apex Industrial Park
Novva Data Centers, a US operator, has purchased nearly 205 acres within the North Las Vegas Apex Industrial Park from VanTrust Real Estate.
8.52 miles Edged Energy: Las Vegas LAS01
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
8.63 miles ISP.Net DC1
8.83 miles Switch Las Vegas 2
8.83 miles Flexential Carson I & II
8.88 miles Lumen: Las Vegas 2
8.97 miles Switch Las Vegas 5
9.79 miles ISP.Net DC2
12.02 miles Switch: Jones 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
12.02 miles Switch: Jones Boulevard Campus
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
13.55 miles Lumen: Las Vegas 3
14.92 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
14.97 miles Hyperscale Data Center Request Dataset
15.00 miles Fiberhub - Las Vegas
15.38 miles ColoXchange Las Vegas
15.59 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
16.89 miles Verizon: 2240 Corporate Cir
17.14 miles Hyperscale Data Center Request Dataset
17.14 miles Switch Las Vegas 7
17.14 miles Contegix Las Vegas
17.15 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
17.25 miles Switch Las Vegas 12
17.27 miles Switch Edge 1
17.28 miles Switch: Las Vegas 15
17.37 miles Switch Las Vegas 8
17.49 miles Switch Las Vegas 11
17.56 miles Switch Las Vegas 10
17.59 miles Switch Las Vegas 9

Novva Las Vegas Data Center Photos (See all)

Inside Novva Data Center Las Vegas.jpeg
Source: Novva Data Center

Operating Company

Operated by:
13
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?