Switch: Apex Industrial Park

Latest Podcast Apex Industrial Park
Land Bank
Land secured for future development
Operated by:

Switch: Apex Industrial Park

Lot Size: 316 acres

Switch has expanded its footprint at Apex Industrial Park in North Las Vegas through two separate land acquisitions in early 2026, bringing its total holdings in the area to 316 acres. The company first acquired 176 acres for $85.5 million in January 2026, followed by an additional 140 acres for $95 million in March 2026, consolidating a significant land position within the industrial park. The site is located along the U.S. Highway 93 corridor and is positioned for future large-scale data center development, though no construction plans or timelines have been publicly disclosed as of the latest reporting.

Map and Nearby Locations

Apex Industrial Park
Switch Sites
Nearby Facilities

Sites within 15 miles of Switch: Apex Industrial Park

Distance Site About
1.34 miles Switch Las Vegas 2
1.43 miles Lumen: Las Vegas 2
1.51 miles Switch Las Vegas 5
2.86 miles ISP.Net DC1
4.31 miles Edged Energy: Las Vegas LAS01
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
4.53 miles Flexential Carson I & II
4.98 miles ISP.Net DC2
6.00 miles Lumen: Las Vegas 3
6.01 miles Lumen: Las Vegas (1 Aerojet)
6.36 miles Flexential Las Vegas (Lone Mountain)
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest. AwardedTier IV Design Certification by the Uptime Institute for the design documents 3,000 tons redundant, fault-tolerant cooling capacity
7.58 miles Novva Las Vegas
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
7.65 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
7.83 miles Fiberhub - Las Vegas
7.85 miles Station MaxInterested in this information?Contact us
8.22 miles ColoXchange Las Vegas
8.44 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
9.32 miles Verizon: 2240 Corporate Cir
9.93 miles Switch: EVO AI Factory 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
10.81 miles CoreWeave: US West LAS1
10.82 miles Switch Las Vegas 7
10.82 miles Contegix Las Vegas
10.84 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
10.91 miles Carrier-Neutral Data CenterInterested in this information?Contact us
10.91 miles Switch Las Vegas 12
10.97 miles Switch Edge 1
11.07 miles Switch Las Vegas 8
11.10 miles Switch: Las Vegas 14
11.10 miles Switch: Las Vegas 15
11.15 miles Switch Las Vegas 11
11.26 miles Switch Las Vegas 10
11.28 miles Switch Las Vegas 9
11.43 miles Switch: EVO AI Factory 1
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
12.66 miles Switch: Armory Building 2
The central data center building in Switch’s approved three-building Armory Campus development.
12.72 miles Switch: Armory Building 1
The northernmost of three identical data center buildings approved for Switch’s Armory Campus in Enterprise.
12.77 miles Switch: Armory Building 3
The southernmost data center building approved for Switch’s Armory Campus near Las Vegas.
13.97 miles Novva: Apex Industrial Park
Novva Data Centers, a US operator, has purchased nearly 205 acres within the North Las Vegas Apex Industrial Park from VanTrust Real Estate.
17.15 miles Townsite Solar 2: Boulder City
Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada.

Operating Company

Operated by:

Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.

Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.

0
Facilities
0
Markets

News See all

Read Switch Files Plans For Data Center Campus At Former Pittsburgh Race Track
Switch has filed plans for a new three-building data center campus in Big Beaver Borough, near Pittsburgh, Pennsylvania. The proposed Big Beaver Data Center/Switch Pit 01-03 will feature three faci...

Switch Files Plans For Data Center Campus At Former Pittsburgh Race Track

August 24, 2026 Switch

Switch has filed plans for a new three-building data center campus in Big Beaver Borough, near Pittsburgh, Pennsylvania. The proposed Big Beaver Data Center/Switch Pit 01-03 will feature three facilities, each covering 201,690 sq ft (18,737 sqm). Planning documents indicate a combined backup...

Read more
Read Iron County, Utah Data Center Proposal Gets Green Light
Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4.

The...

Iron County, Utah Data Center Proposal Gets Green Light

June 13, 2026 Switch

Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4. The Antelope Data Center campus will include five buildings totaling around 1.35 million sq ft (125,000...

Read more
Read Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion
Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3...

Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion

June 10, 2026 Switch

Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3.5 billion syndicated uncommitted performance letter of credit facility (LCF). In April, Switch...

Read more
Read Switch Plans New Data Center Campus Near Pittsburgh
Switch Plans New Data Center Campus Near Pittsburgh

Switch Plans New Data Center Campus Near Pittsburgh

May 01, 2026 Switch

US data center firm Switch is planning a new campus outside Pittsburgh, Pennsylvania. The company this week announced plans for a 382-acre development in Big Beaver Borough, Beaver County. The site is located around 40 miles (64km) northwest of Pittsburgh, near the Ohio state border. Full details...

Read more
Read Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design
Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design

Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design

March 16, 2026 Switch

Data center operator Switch has integrated Nvidia’s Omniverse DSX Blueprint into its EVO AI Factory architecture and LDC EVO operating system. The company introduced EVO last year, describing it as a new data center design capable of supporting up to 2MW per rack.LDC EVO is Switch's answer to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?