Edged Opens 36MW Data Center in Phoenix, Arizona
April 08, 2026
Edged Energy
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
| Distance | Site | About |
|---|---|---|
| 0.32 miles | Flexential Carson I & II |
|
| 1.27 miles | ISP.Net DC2 | |
| 1.71 miles | ISP.Net DC1 |
|
| 3.96 miles | Lumen: Las Vegas 2 | |
| 4.01 miles | Switch Las Vegas 5 | |
| 4.05 miles | Switch Las Vegas 2 | |
| 4.65 miles | Lumen: Las Vegas (1 Aerojet) | |
| 4.75 miles | Switch: Jones Boulevard Campus |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 4.75 miles | Switch: Jones 2 |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 5.69 miles | Flexential Las Vegas (Lone Mountain) |
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest.
AwardedTier IV Design Certification by the Uptime Institute for the design documents
3,000 tons redundant, fault-tolerant cooling capacity
|
| 7.12 miles | Lumen: Las Vegas 3 | |
| 7.29 miles | Fiberhub - Las Vegas |
|
| 7.36 miles | EdgeConneX Las Vegas |
EdgeConnex has rights to adjacent space to accommodate expansion
|
| 7.62 miles | ColoXchange Las Vegas | |
| 7.78 miles | DataBank Las Vegas LAS1 |
The site was a former zColo (Zayo) facility before being acquired in 2020.
|
| 8.52 miles | Novva Las Vegas |
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
|
| 8.68 miles | Hyperscale Data Center Request Dataset | |
| 8.68 miles | Contegix Las Vegas | |
| 8.68 miles | Switch Las Vegas 7 | |
| 8.68 miles | Switch Las Vegas CORE Campus |
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
|
| 8.77 miles | Switch: Las Vegas 15 | |
| 8.80 miles | Switch Las Vegas 12 | |
| 8.80 miles | Switch Edge 1 | |
| 8.90 miles | Switch Las Vegas 8 | |
| 9.03 miles | Switch Las Vegas 11 | |
| 9.09 miles | Switch Las Vegas 10 | |
| 9.12 miles | Switch Las Vegas 9 | |
| 10.29 miles | Verizon: 2240 Corporate Cir | |
| 10.73 miles | Hyperscale Data Center Request Dataset |
|
| 16.22 miles | Novva: Apex Industrial Park |
Novva Data Centers, a US operator, has purchased nearly 205 acres within the North Las Vegas Apex Industrial Park from VanTrust Real Estate.
|
April 08, 2026
Edged Energy
January 17, 2026
Edged Energy
November 21, 2025
Edged Energy
September 24, 2025
Edged Energy
August 08, 2025
Edged Energy
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas