Edged Energy: Las Vegas LAS01

Latest Podcast
Las Vegas
Planned
Future facility in planning stage
Operated by:

Edged Energy: Las Vegas LAS01

Short Code: LAS01

Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.

Map and Nearby Locations:

Las Vegas
Edged Energy Sites
Nearby Facilities

Sites within 15 miles of Edged Energy: Las Vegas LAS01

Distance Site About
0.32 miles Flexential Carson I & II
1.27 miles ISP.Net DC2
1.71 miles ISP.Net DC1
3.96 miles Lumen: Las Vegas 2
4.01 miles Switch Las Vegas 5
4.05 miles Switch Las Vegas 2
4.65 miles Lumen: Las Vegas (1 Aerojet)
4.75 miles Switch: Jones Boulevard Campus
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
4.75 miles Switch: Jones 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
5.69 miles Flexential Las Vegas (Lone Mountain)
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest. AwardedTier IV Design Certification by the Uptime Institute for the design documents 3,000 tons redundant, fault-tolerant cooling capacity
7.12 miles Lumen: Las Vegas 3
7.29 miles Fiberhub - Las Vegas
7.36 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
7.62 miles ColoXchange Las Vegas
7.78 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
8.52 miles Novva Las Vegas
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
8.68 miles Hyperscale Data Center Request Dataset
8.68 miles Contegix Las Vegas
8.68 miles Switch Las Vegas 7
8.68 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
8.77 miles Switch: Las Vegas 15
8.80 miles Switch Las Vegas 12
8.80 miles Switch Edge 1
8.90 miles Switch Las Vegas 8
9.03 miles Switch Las Vegas 11
9.09 miles Switch Las Vegas 10
9.12 miles Switch Las Vegas 9
10.29 miles Verizon: 2240 Corporate Cir
10.73 miles Hyperscale Data Center Request Dataset
16.22 miles Novva: Apex Industrial Park
Novva Data Centers, a US operator, has purchased nearly 205 acres within the North Las Vegas Apex Industrial Park from VanTrust Real Estate.

Edged Energy: Las Vegas LAS01 Data Center Photos (See all)

Operating Company

Operated by:

Edged Energy is a colocation and data center provider. The company also has data centers in development across the US.

Its Spain business is a subsidiary of Endeavour in collaboration with Merlin Properties.

41
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?