Edged Energy: Las Vegas LAS01

Planned
Future facility in planning stage
Operated by:

Edged Energy: Las Vegas LAS01

Short Code: LAS01
Year Planned: 2028

Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.

Map and Nearby Locations

Las Vegas
Edged Energy Sites
Nearby Facilities

Edged Energy: Las Vegas LAS01 Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Edged Energy: Las Vegas LAS01

Distance Site About
0.32 miles Flexential Carson I & II
1.27 miles ISP.Net DC2
1.71 miles ISP.Net DC1
3.96 miles Lumen: Las Vegas 2
4.01 miles Switch Las Vegas 5
4.05 miles Switch Las Vegas 2
4.31 miles Switch: Apex Industrial Park
Switch has acquired a combined 316 acres at Apex Industrial Park in North Las Vegas, Nevada, through two land purchases totaling $180.5 million—including 176 acres acquired in January 2026 for $85.5 million and an additional 140 acres acquired in March 2026 for $95 million. The combined site represents a large-scale landholding for future data center campus development.
4.65 miles Lumen: Las Vegas (1 Aerojet)
4.75 miles Switch: Jones Boulevard Campus
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
4.75 miles Switch: Jones 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
5.69 miles Flexential Las Vegas (Lone Mountain)
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest. AwardedTier IV Design Certification by the Uptime Institute for the design documents 3,000 tons redundant, fault-tolerant cooling capacity
7.12 miles Lumen: Las Vegas 3
7.29 miles Fiberhub - Las Vegas
7.36 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
7.62 miles ColoXchange Las Vegas
7.78 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
8.52 miles Novva Las Vegas
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
8.68 miles CoreWeave: US West LAS1
8.68 miles Contegix Las Vegas
8.68 miles Switch Las Vegas 7
8.68 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
8.77 miles Switch: Las Vegas 15
8.80 miles Switch Las Vegas 12
8.80 miles Switch Edge 1
8.90 miles Switch Las Vegas 8
9.03 miles Switch Las Vegas 11
9.09 miles Switch Las Vegas 10
9.12 miles Switch Las Vegas 9
10.29 miles Verizon: 2240 Corporate Cir
10.73 miles EdgeInterested in this information?Contact us
11.17 miles Switch: Armory Building 2
The central data center building in Switch’s approved three-building Armory Campus development.
11.20 miles Switch: Armory Building 1
The northernmost of three identical data center buildings approved for Switch’s Armory Campus in Enterprise.
11.29 miles Switch: Armory Building 3
The southernmost data center building approved for Switch’s Armory Campus near Las Vegas.
16.22 miles Novva: Apex Industrial Park
Novva Data Centers, a US operator, has purchased nearly 205 acres within the North Las Vegas Apex Industrial Park from VanTrust Real Estate.

Edged Energy: Las Vegas LAS01 Data Center Photos See all

Operating Company

Operated by:

Edged Energy is a colocation and data center provider. The company also has data centers in development across the US.

Its Spain business is a subsidiary of Endeavour in collaboration with Merlin Properties.

44
Facilities
23
Markets

News See all

Read Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion
Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

Edged Raises Nearly $2 Billion to Accelerate U.S. Data Center Expansion

May 29, 2026 Edged Energy

US data center developer Edged has secured nearly $2 billion in financing so far this year to support the expansion of its data center portfolio. The company said the capital will be used to advance projects in key markets, including Atlanta, Chicago, and Council Bluffs. The funding package...

Read more
Read Edged Opens 36MW Data Center in Phoenix, Arizona
Edged Opens 36MW Data Center in Phoenix, Arizona

Edged Opens 36MW Data Center in Phoenix, Arizona

April 08, 2026 Edged Energy

US operator Edged has launched a new data center in Phoenix, Arizona. The Endeavour-owned company this month announced the opening of its PHX01-1 facility. Situated on a 12-acre site at 8811 E. Warner Road in Mesa, Maricopa County, the two-story building delivers 36MW of capacity across 210,000...

Read more
Read Edged secures permission for second data center at Irving campus, Tex
Edged secures permission for second data center at Irving campus, Tex

Edged secures permission for second data center at Irving campus, Tex

January 17, 2026 Edged Energy

Data center operator Edged this week announced plans to add a second data center to its Edged Dallas campus in Irving, Dallas County. The news follows Irving City Council voting unanimously to approve the expansion, which will be located on North Wildwood Drive in the industrial area east of...

Read more
Read Edged Breaks Ground on Second Chicago Faciity
Edged Breaks Ground on Second Chicago Faciity

Edged Breaks Ground on Second Chicago Faciity

November 21, 2025 Edged Energy

Data center firm Edged has broken ground on a second data center in Chicago, Illinois. Located at 2835 Bilter Road, the new facility will be purpose-built for high-density AI workloads and feature advanced closed-loop, waterless cooling. The facility will go live in Q2 2027. “Safety and...

Read more
Read Edged Opens Data Center in New Albany, Ohio
Edged Opens Data Center in New Albany, Ohio

Edged Opens Data Center in New Albany, Ohio

September 24, 2025 Edged Energy

Data center operator Edged recently celebrated the opening of its newest data center in New Albany. Tthe two-story facility delivers 24MW of capacity across 206,000 sq ft (19,140 sqm).“This project would not have been possible without the support of the City of New Albany, who has been unwavering...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?