Townsite Solar 2: Boulder City

Site planned for 2027 and has expansions through 2031
Ownership: Townsite Solar 2 LLC does not own the building.
Lot Size: 89 acres

Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada. Located southeast of Las Vegas, the project is a joint venture between Skylar Capital, Arevon Energy, and Overwatch Capital. The site plan includes up to six buildings, with construction potentially starting in 2026 and the initial phase targeted for completion in 2027.

Map and Nearby Locations

13316 US-95
Townsite Solar 2 LLC Sites
Nearby Facilities

Townsite Solar 2: Boulder City Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Townsite Solar 2: Boulder City

Distance Site About
9.39 miles CampusInterested in this information?Contact us
11.27 miles Verizon: 2240 Corporate Cir
13.31 miles Lumen: Las Vegas 3
14.62 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
15.00 miles Fiberhub - Las Vegas
15.00 miles ColoXchange Las Vegas
15.08 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
16.43 miles Switch Las Vegas 5
16.47 miles Switch Las Vegas 2
16.51 miles Lumen: Las Vegas 2
16.96 miles Switch: Armory Building 3
The southernmost data center building approved for Switch’s Armory Campus near Las Vegas.
16.97 miles Switch: Armory Building 2
The central data center building in Switch’s approved three-building Armory Campus development.
17.06 miles Switch: Armory Building 1
The northernmost of three identical data center buildings approved for Switch’s Armory Campus in Enterprise.
17.15 miles Switch: Apex Industrial Park
Switch has acquired a combined 316 acres at Apex Industrial Park in North Las Vegas, Nevada, through two land purchases totaling $180.5 million—including 176 acres acquired in January 2026 for $85.5 million and an additional 140 acres acquired in March 2026 for $95 million. The combined site represents a large-scale landholding for future data center campus development.
18.22 miles Switch Las Vegas 12
18.26 miles Switch Las Vegas 7
18.26 miles Contegix Las Vegas
18.26 miles CoreWeave: US West LAS1
18.32 miles Switch Las Vegas 11
18.32 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
18.37 miles Switch Edge 1
18.40 miles Switch Las Vegas 8
18.45 miles Switch Las Vegas 9
18.45 miles ISP.Net DC1
18.46 miles Switch Las Vegas 10
19.00 miles Switch: Las Vegas 15
19.73 miles ISP.Net DC2

Townsite Solar 2: Boulder City Data Center Photos See all

Operating Company

1
Facilities
1
Markets

News See all

Read Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs
Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

July 15, 2024 Las Vegas

The Sphere in Las Vegas, popularly known for its globe shape and LED displays that cover 750,000 sq ft (69,677 sqm) inside and out is reportedly powered by 150 of Nvidia's RTX A6000 GPUs with each having a 48GB memory and maximum power consumption of 300W. “Sphere is captivating audiences not...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?