Townsite Solar 2: Boulder City

Latest Podcast 13316 US-95
Withdrawn
Project cancelled before construction

Townsite Solar 2: Boulder City

Site planned for 2027 and has expansions through 2031
Ownership: Townsite Solar 2 LLC does not own the building.
Lot Size: 89 acres

Townsite Solar 2 (TS2), a Skylar Capital subsidiary developing in partnership with Arevon Energy and Overwatch Capital, is relocating its planned high-density AI data center campus outside Las Vegas from municipal land to federal jurisdiction.

Following community opposition and a recommendation from the Boulder City planning commission against permitting data centers on the city's 88.5-acre parcel, TS2 withdrew its municipal application. The developer is instead advancing the multi-building facility on an adjacent 80-acre plot managed by the U.S. Bureau of Land Management (BLM), leveraging an approved amendment to its existing solar right-of-way grant to permit data center operations despite potential legal appeals from Boulder City.

Map and Nearby Locations

13316 US-95
Townsite Solar 2 LLC Sites
Nearby Facilities

Townsite Solar 2: Boulder City Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Townsite Solar 2: Boulder City

Distance Site About
0.41 miles Townsite DC: Boulder City
After withdrawing the first site, Townsite Solar 2 LLC is going for a new 80-acre federally owned parcel to build out the renamed Townsite Data Center.
9.39 miles Plaza TwoInterested in this information?Contact us
11.27 miles Verizon: 2240 Corporate Cir
13.31 miles Lumen: Las Vegas 3
14.62 miles EdgeConneX Las Vegas
EdgeConnex has rights to adjacent space to accommodate expansion
15.00 miles Fiberhub - Las Vegas
15.00 miles ColoXchange Las Vegas
15.08 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
16.43 miles Switch Las Vegas 5
16.47 miles Switch Las Vegas 2
16.51 miles Lumen: Las Vegas 2
16.96 miles Switch: Armory Bldg3
The southernmost data center building approved for Switch’s Armory Campus near Las Vegas.
16.97 miles Switch: Armory Bldg2
The central data center building in Switch’s approved three-building Armory Campus development.
17.06 miles Switch: Armory Bldg1
The northernmost of three identical data center buildings approved for Switch’s Armory Campus in Enterprise.
18.22 miles Switch Las Vegas 12
18.26 miles Switch Las Vegas 7
18.26 miles Contegix Las Vegas
18.26 miles CoreWeave: US West LAS1
18.32 miles Switch Las Vegas 11
18.32 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
18.37 miles Switch Edge 1
18.40 miles Switch Las Vegas 8
18.45 miles Switch Las Vegas 9
18.45 miles ISP.Net DC1
18.46 miles Switch Las Vegas 10
18.86 miles Carrier-Neutral Data CenterInterested in this information?Contact us
18.94 miles Switch: Las Vegas 15
19.02 miles Switch: Las Vegas 14
19.23 miles Switch: EVO AI Factory 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
19.38 miles Switch: EVO AI Factory 1
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
19.73 miles ISP.Net DC2

Operating Company

0
Facilities
0
Markets

News See all

Read Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs
Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs

July 15, 2024 Las Vegas

The Sphere in Las Vegas, popularly known for its globe shape and LED displays that cover 750,000 sq ft (69,677 sqm) inside and out is reportedly powered by 150 of Nvidia's RTX A6000 GPUs with each having a 48GB memory and maximum power consumption of 300W. “Sphere is captivating audiences not...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?