Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada. Located southeast of Las Vegas, the project is a joint venture between Skylar Capital, Arevon Energy, and Overwatch Capital. The site plan includes up to six buildings, with construction potentially starting in 2026 and the initial phase targeted for completion in 2027.
| Distance | Site | About |
|---|---|---|
| 9.39 miles | Hyperscale Data Center Request Dataset |
|
| 11.27 miles | Verizon: 2240 Corporate Cir | |
| 13.31 miles | Lumen: Las Vegas 3 | |
| 14.62 miles | EdgeConneX Las Vegas |
EdgeConnex has rights to adjacent space to accommodate expansion
|
| 15.00 miles | Fiberhub - Las Vegas |
|
| 15.00 miles | ColoXchange Las Vegas | |
| 15.08 miles | DataBank Las Vegas LAS1 |
The site was a former zColo (Zayo) facility before being acquired in 2020.
|
| 16.43 miles | Switch Las Vegas 5 | |
| 16.47 miles | Switch Las Vegas 2 | |
| 16.51 miles | Lumen: Las Vegas 2 | |
| 18.22 miles | Switch Las Vegas 12 | |
| 18.26 miles | Switch Las Vegas 7 | |
| 18.26 miles | Contegix Las Vegas | |
| 18.26 miles | Hyperscale Data Center Request Dataset | |
| 18.32 miles | Switch Las Vegas 11 | |
| 18.32 miles | Switch Las Vegas CORE Campus |
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
|
| 18.37 miles | Switch Edge 1 | |
| 18.40 miles | Switch Las Vegas 8 | |
| 18.45 miles | Switch Las Vegas 9 | |
| 18.45 miles | ISP.Net DC1 |
|
| 18.46 miles | Switch Las Vegas 10 | |
| 19.00 miles | Switch: Las Vegas 15 | |
| 19.73 miles | ISP.Net DC2 |
July 15, 2024
Las Vegas
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas