0.39 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
0.39 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
0.77 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
0.94 miles
|
Equinix DC97
|
|
1.06 miles
|
Cogent: 510 Huntmar
|
|
1.28 miles
|
Lumen Herndon 3
|
|
1.30 miles
|
Lumen Herndon 1
|
|
1.41 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
1.50 miles
|
InfoRelay Reston
|
|
2.10 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
2.27 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
2.27 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
2.38 miles
|
ANEXIO Reston
|
|
2.38 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
3.22 miles
|
InfoRelay Herndon
|
|
3.35 miles
|
45900 Pathfinder Plz
|
|
3.42 miles
|
AWS: 45930 Pathfinder Plz
|
|
3.46 miles
|
AWS: 22900 Platform Plz
|
|
3.52 miles
|
Amazon 13600 EDS Drive
|
|
3.54 miles
|
AWS: 45950 Pathfinder Plz
|
|
3.68 miles
|
AWS: 22868 International Dr
|
|
3.72 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
3.74 miles
|
Cyxtera IAD2-B
|
|
3.75 miles
|
AWS: 22945 International Dr
|
|
3.82 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
4.50 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
4.56 miles
|
Amazon IAD-51
|
|
4.57 miles
|
Amazon IAD-56
|
|
4.58 miles
|
Amazon IAD-58
|
|
4.61 miles
|
Vantage VA2 Campus
|
|
4.62 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
4.64 miles
|
Amazon IAD-57
|
|
4.68 miles
|
Amazon 22420 Kipper
|
|
4.75 miles
|
Amazon 45111 Loudoun Downs
|
|
4.76 miles
|
Amazon 22370 Kipper
|
|
4.78 miles
|
Amazon IAD-88
|
|
4.94 miles
|
Amazon IAD12
|
|
5.01 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
5.04 miles
|
Amazon IAD16
|
|
5.08 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
5.09 miles
|
Amazon IAD15
|
|
5.12 miles
|
Sentinel Ashburn
|
|
5.12 miles
|
Vantage VA12
|
|
5.13 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
5.13 miles
|
Vantage VA11
|
|
5.16 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
5.21 miles
|
Vantage VA13
|
|
5.25 miles
|
Amazon IAD76
|
|
5.41 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
5.47 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
5.47 miles
|
CyrusOne Sterling VIII
|
|
5.53 miles
|
EdgeCore Ashburn
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
5.56 miles
|
Amazon IAD9
|
|
5.58 miles
|
QTS Ashburn Lockridge
|
|
5.60 miles
|
PowerHouse Pacific
|
|
5.60 miles
|
Cyxtera Sterling DC2
|
|
5.65 miles
|
Cyxtera Sterling DC4
|
|
5.67 miles
|
Amazon IAD1
|
|
5.67 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
5.68 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
5.69 miles
|
Cyxtera Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
5.69 miles
|
Digital Realty: IAD43
|
|
5.71 miles
|
Amazon IAD22
|
|
5.73 miles
|
Digital Realty: Broderick Drive
|
|
5.75 miles
|
COPT: 45761 Maries Rd
|
|
5.77 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
5.80 miles
|
Amazon IAD-69
|
|
5.81 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
5.87 miles
|
COPT: 45751 Maries Rd
|
|
5.89 miles
|
Amazon 45305 Severn
|
|
5.91 miles
|
21710 Charles View
|
|
5.98 miles
|
Amazon 45259 Severn
|
|
6.03 miles
|
IBM Softlayer Chantilly WDC01
|
|
6.03 miles
|
Amazon IAD10
|
|
6.04 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
6.04 miles
|
21641 Charles View
|
|
6.06 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
6.06 miles
|
Amazon IAD32
|
|
6.14 miles
|
Amazon 25420 Sutton Bay
|
|
6.21 miles
|
CyrusOne Northern Virginia Sterling V
|
|
6.21 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
6.21 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
6.22 miles
|
Equinix DC21
|
|
6.22 miles
|
44351 Import Plz
|
|
6.25 miles
|
44751 Round Table (Bldg P)
|
|
6.28 miles
|
Amazon Willard Road (Land)
|
|
6.28 miles
|
Amazon 25410 Sutton Bay
|
|
6.30 miles
|
Amazon 25020 Willard Road
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
6.40 miles
|
Import Plz, Ashburn
|
|
6.41 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
6.45 miles
|
PowerHouse ABX1
|
|
6.48 miles
|
QTS Ashburn-Shellhorn DC2
|
|
6.51 miles
|
CloudHQ Ashburn Campus
|
|
6.51 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
6.51 miles
|
VPLS IAD
|
|
6.53 miles
|
QTS Ashburn-Shellhorn
|
|
6.54 miles
|
Equinix Ashburn DC11
|
|
6.54 miles
|
Equinix Ashburn DC6
|
|
6.55 miles
|
CloudHQ LC2
|
|
6.56 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
6.59 miles
|
44274 Round Table (Bldg L)
|
|
6.61 miles
|
Equinix DC15
|
|
6.61 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
6.62 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
6.62 miles
|
Equinix Ashburn DC1
|
|
6.63 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
6.63 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
6.64 miles
|
44372 Round Table: Digital Realty
|
|
6.68 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
6.68 miles
|
Equinix Ashburn DC5
|
|
6.69 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
6.74 miles
|
Equinix Ashburn DC4
|
|
6.75 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
6.78 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
6.78 miles
|
ANEXIO VA1
|
|
6.79 miles
|
Amazon 44854 Interconnection
|
|
6.81 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
6.81 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
6.81 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
6.81 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
6.81 miles
|
Amazon IAD-67
|
|
6.81 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
6.82 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
6.83 miles
|
Amazon 44858 Interconnection Plaza
|
|
6.83 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
6.83 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
6.85 miles
|
Lumen Ashburn
|
|
6.87 miles
|
Equinix DC13
|
|
6.87 miles
|
44490 Chilum Place: Digital Realty
|
|
6.89 miles
|
Amazon IAD61
|
|
6.90 miles
|
Amazon IAD-63
|
|
6.92 miles
|
ANEXIO Ashburn IAD4
|
|
6.92 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
6.93 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
6.95 miles
|
Amazon 44862 Interconnection Plaza
|
|
6.96 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
6.97 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
6.97 miles
|
ServerCentral Ashburn DC3
|
|
6.97 miles
|
44470 Chillum - Digital Realty
|
|
6.97 miles
|
Aligned Ashburn
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
6.98 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
6.99 miles
|
Amazon Prediction Lane
|
|
6.99 miles
|
NTT VA2
|
|
7.00 miles
|
43915 Devin Shafron (Bldg A)
|
|
7.01 miles
|
Aligned IAD02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
7.02 miles
|
Rackspace Ashburn IAD3
|
|
7.02 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
7.04 miles
|
43881 Devin Shafron (Bldg B)
|
|
7.10 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
7.15 miles
|
43830 Devin Shafron (Bldg F)
|
|
7.16 miles
|
43831 Devin Shafron (Bldg C)
|
|
7.21 miles
|
Equinix Vienna DC8
|
|
7.21 miles
|
CyrusOne Sterling IX
|
|
7.22 miles
|
NTT Ashburn Campus
|
|
7.22 miles
|
Amazon IAD60
|
|
7.25 miles
|
43790 Devin Shafron (Bldg E)
|
|
7.26 miles
|
Amazon IAD71
|
|
7.26 miles
|
Amazon IAD-54
|
|
7.26 miles
|
43791 Devin Shafron (Bldg D)
|
|
7.28 miles
|
NTT VA5
|
|
7.28 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
7.30 miles
|
Amazon IAD50
|
|
7.34 miles
|
NTT VA4
|
|
7.35 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
7.38 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
7.38 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
7.50 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
7.51 miles
|
FastServ Ashburn
|
|
7.61 miles
|
DataBank Ashburn IAD3
|
|
7.98 miles
|
Amazon Fadeley I
|
|
8.01 miles
|
Amazon Fadeley II
|
|
8.06 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
8.11 miles
|
Amazon Fadeley III
|
|
8.14 miles
|
Cogent Vienna
|
|
8.19 miles
|
8100 Boone - Digital Realty
|
|
8.41 miles
|
Google Dulles Arcola Center
|
|
8.43 miles
|
Google: Arcola 2
|
|
8.58 miles
|
Equinix Vienna DC7
|
|
8.63 miles
|
Element Critical VA1
|
|
8.74 miles
|
DataBank McLean IAD2
|
|
8.74 miles
|
XO Fairfax
|
|
8.79 miles
|
Lumen McLean 1
|
|
8.85 miles
|
PowerHouse Arcola
|
|
9.54 miles
|
Amazon 41992 John Mosby Highway
|
|
9.58 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
9.91 miles
|
Microsoft IAD11
|
|
10.07 miles
|
Microsoft Aldie
|
|
11.06 miles
|
Compass Loudoun County
|
|
11.59 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
11.59 miles
|
Google Leesburg Stonewall Park
|
|
12.09 miles
|
TA Realty: Leesburg
|
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
12.51 miles
|
AOL: 7777 Infantry Ridge
|
|
12.55 miles
|
Equinix Manassas DC14
|
|
12.58 miles
|
QTS: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
13.51 miles
|
Microsoft Leesburg 1A
|
|
13.76 miles
|
Microsoft: Jacksonville Road
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
13.87 miles
|
Stack: Northern Virginia, NVA06
|
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
|
13.91 miles
|
Compass: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
13.98 miles
|
AWS: 7151 Century Park Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
14.00 miles
|
Amazon 7500 Bethlehem
|
|
14.02 miles
|
AWS: 7350 Century Park
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
14.11 miles
|
Amazon IAD7
|
|
14.17 miles
|
Amazon IAD24
|
|
14.24 miles
|
Amazon IAD11
|
|
14.32 miles
|
AWS: 8401 Vulcan Lane Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
14.43 miles
|
Amazon IAD-59
|
|
14.47 miles
|
Amazon IAD-52
|
|
14.52 miles
|
AWS: 8501 Vulcan Ln
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
14.53 miles
|
Amazon IAD14
|
|
14.78 miles
|
Amazon: 8190 Bethlehem
|
|
14.82 miles
|
Amazon Bethlehem Technology Park DC18
|
|
14.87 miles
|
Amazon Bethlehem Technology Park DC19
|
|
14.90 miles
|
Amazon Bethlehem Technology Park DC20
|
|
15.03 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
15.08 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
15.11 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
15.13 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
15.14 miles
|
AWS: Nokesville Road Campus
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction will soon begin on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
15.15 miles
|
Iron Mountain VA-2
|
|
15.15 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
15.18 miles
|
9020 Freedom Center
|
|
15.19 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
15.27 miles
|
9040 Freedom Center
|
|
15.28 miles
|
Opus Interactive Manassas
|
|
15.30 miles
|
Corscale: Gainesville Crossing
|
|
15.34 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
15.36 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
15.44 miles
|
QTS Manassas DC1
|
|
15.52 miles
|
Amazon IAD-74
|
|
15.54 miles
|
Amazon IAD-73
|
|
15.60 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
15.64 miles
|
QTS Manassas DC5
|
|
15.71 miles
|
QTS 10680 University Blvd
|
|
15.78 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
16.00 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
16.28 miles
|
AWS 10261 Tanner
|
|
16.37 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
16.37 miles
|
Evoswitch USA WDC 1
|
|
16.37 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
16.37 miles
|
Amazon IAD-77
|
|
16.38 miles
|
Yondr Bristow Campus
|
|
16.40 miles
|
AWS 10281 Tanner Way
|
|
16.41 miles
|
AWS IAD 101
|
|
16.49 miles
|
NTT Gainesville VA Campus
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" in some of the planning documents.
|
16.50 miles
|
Amazon: 11150 Thomasson Barn
|
|
16.52 miles
|
AWS IAD 100
|
|
16.54 miles
|
Stack: NVA02C
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
|
16.55 miles
|
Amazon: 11200 Thomasson Barn
|
|
16.55 miles
|
Stack: NVA02D
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
16.55 miles
|
XO (4301 Connecticut)
|
|
16.60 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
16.67 miles
|
Stack: NVA02E
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
16.68 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
16.73 miles
|
AWS: 10453 Wakeman Drive
|
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
|
17.00 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
17.06 miles
|
CloudHQ MCC2
|
|
17.27 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
17.43 miles
|
CloudHQ MCC3
|
|
17.52 miles
|
Amazon IAD-55
|
|
17.68 miles
|
Amazon: 15455 John Marshall
|
|
17.75 miles
|
Amazon 15465 John Marshall
|
|
18.45 miles
|
XO: 1120 Vermont
|
|
18.46 miles
|
Cogent: 1120 Vermont
|
|
18.46 miles
|
Level3 Washington
|
|
18.52 miles
|
CoreSite DC2
|
|
18.67 miles
|
XO (1220 L)
|
|
18.67 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|