Stack: NVA02E

Latest Podcast 9570 Hornbaker Rd
Operational
Fully operational facility
Operated by:

Stack: NVA02E

Short Code: NVA02E
Year Built: 2024
Utility Provider: Northern Virginia Electric Cooperative (NOVEC)
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

NVA02E is a 259,200 sq ft data center building on STACK Infrastructure's NVA02 campus at 9570 Hornbaker Road in Manassas, Virginia.

  • The building received its certificate of occupancy in August 2024.

Map and Nearby Locations

9570 Hornbaker Rd
STACK INFRASTRUCTURE Sites
Nearby Facilities

Stack: NVA02E Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Stack: NVA02E

Distance Site About
0.06 miles Stack: NVA02F
NVA02F is a data center building under construction on STACK Infrastructure's NVA02 campus at 9640 Hornbaker Road in Manassas, Virginia.
0.19 miles Stack: NVA02D
NVA02D is a 281,000 sq ft data center building on STACK Infrastructure's NVA02 campus at 9590 Hornbaker Road in Manassas, Virginia.
0.21 miles Stack: NVA02H
NVA02H is a 256,212 sq ft, two-story data center building under construction on STACK Infrastructure's NVA02 campus at 10167 Linton Hall Road in Prince William County, Virginia.
0.21 miles Tower GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.23 miles Stack: NVA02G
NVA02G is a 185,803 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 9530 Hornbaker Road in Manassas, Virginia.
0.31 miles Center PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.31 miles Stack: NVA02I
NVA02I is a 256,280 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10161 Linton Hall Road in Prince William County, Virginia.
0.33 miles Tower ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.33 miles Stack: NVA02B
NVA02B is a 224,652 sq ft data center building on STACK Infrastructure's NVA02 campus at 9740 Hornbaker Road in Manassas, Virginia.
0.33 miles Stack: NVA02C
NVA02C, or Building C, is a 14,387 sq ft building on STACK Infrastructure's NVA02 campus at 9730 Hornbaker Road in Manassas, Virginia.
0.34 miles Stack: NVA02A
NVA02A is a 226,862 sq ft data center building on STACK Infrastructure's NVA02 campus at 9750 Hornbaker Road in Manassas, Virginia.
0.34 miles Cloud RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.36 miles Stack: NVA02J
NVA02J is a 201,000 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10155 Linton Hall Road in Prince William County, Virginia.
0.36 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.44 miles VAZATA Northern Virginia (NoVa One)
0.44 miles Evoswitch USA WDC 1
0.44 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
0.44 miles North HubInterested in this information?Contact us
0.45 miles Stack: Bristow 2 (NVA02L)
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
0.48 miles Plaza AlphaInterested in this information?Contact us
0.55 miles Central RidgeInterested in this information?Contact us
0.64 miles Stack: Bristow 1 (NVA02K)
Bristow 1 (NVA02K) is the first of two three-story data centers STACK Infrastructure proposed on a 58-acre site in Bristow, Virginia. Prince William County supervisors rejected the project in September 2025.
0.98 miles JK Land: Comcast Center
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
1.04 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.14 miles East StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.14 miles Core HubInterested in this information?Contact us
1.16 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.22 miles Yondr: Manassas
Yondr and Cerberus have acquired land in Manassas for a new hyperscale data center campus targeted for service in 2029.
1.24 miles Central ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.35 miles QTS Manassas 1 DC5
This facility is part of QTS Data Center Campus in Manassas.
1.36 miles QTS: Manassas 1 DC4
1.42 miles Central CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.47 miles QTS Manassas 1 DC6
This facility is part of QTS Manassas 1 Campus in Virginia.
1.48 miles Point GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.49 miles Stack: NVA05A
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
1.50 miles QTS: Manassas 1 DC1
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
1.51 miles West RidgeInterested in this information?Contact us
1.54 miles QTS: Manassas 1 DC2
This facility is part of QTS Data Center Campus in Manassas.
1.57 miles Iron Mountain: VA-6
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
1.60 miles Edge HubInterested in this information?Contact us
1.64 miles QTS: Manassas 1 DC3
This facility is part of QTS Data Center Campus in Manassas.
1.65 miles CloudHQ: MDC3
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
1.71 miles Digital Realty: IAD50
1.73 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
1.78 miles Digital Realty: IAD51
1.79 miles CloudHQ: MDC2
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
1.80 miles Iron Mountain: VA-8
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
1.81 miles Stack: NVA05D
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
1.83 miles Stack: NVA05C
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
1.88 miles TPC: Manassas, VA
1.89 miles Hub ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.92 miles Global ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.92 miles Digital Realty: IAD53
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
1.94 miles Iron Mountain: VA-5
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
1.94 miles CloudHQ: MDC1
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
1.97 miles Ridge AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.99 miles Campus ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.03 miles Opus Interactive Manassas
2.05 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
2.10 miles Iron Mountain: VA-7
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
2.14 miles Black Chamber: Nokesville
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
2.15 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
2.23 miles Campus PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.24 miles Iron Mountain VA-2
2.26 miles Metro HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.32 miles Iron Mountain VA-1
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
2.32 miles Metro ValleyInterested in this information?Contact us
2.36 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.37 miles Metro TowerInterested in this information?Contact us
2.41 miles PlazaInterested in this information?Contact us
2.41 miles PrimeInterested in this information?Contact us
2.41 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.41 miles Metro PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.41 miles Core PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.45 miles BetaInterested in this information?Contact us
2.46 miles Ridge GammaInterested in this information?Contact us
2.50 miles South HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.53 miles Edge CenterInterested in this information?Contact us
2.56 miles CloudHQ: MCC7
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
2.64 miles CloudHQ MCC2
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
2.68 miles Ridge UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.75 miles Iron Mountain: Manassas Point
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
2.77 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.85 miles BlackChamber: Gainesville, VA
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
2.89 miles CloudHQ: MCC1
CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
2.89 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.94 miles CloudHQ: MCC4
CloudHQ has announced plans for MCC4, a new facility to be located at 10849 Airman Avenue in the Northern Virginia market. The data center will span 225,585 sqft of space.
3.03 miles CloudHQ MCC3
CloudHQ MCC3 is a part of The MCC data center campus.
3.06 miles CloudHQ: MCC6Z
MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
3.09 miles CloudHQ: MCC5
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
3.13 miles Campus OneInterested in this information?Contact us
3.14 miles Valley MaxInterested in this information?Contact us
3.15 miles TowerInterested in this information?Contact us
3.15 miles CloudHQ: MCC6A
MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
3.19 miles Yondr: Bristow Bldg1
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
3.19 miles Prime PointInterested in this information?Contact us
3.23 miles Edge RidgeInterested in this information?Contact us
3.24 miles Yondr: Bristow Bldg2
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
3.25 miles Park OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.30 miles AlphaInterested in this information?Contact us
3.34 miles JK Land: Hunter Trust
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
3.35 miles Data Center Edge District
The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
3.43 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.51 miles Central PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.54 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.54 miles ValleyInterested in this information?Contact us
3.66 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.67 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.72 miles Center MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.73 miles 8217 Linton Hall (VA4) Digital Realty
3.75 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.76 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
3.82 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.83 miles TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.83 miles Cloud RidgeInterested in this information?Contact us
3.90 miles Station OneInterested in this information?Contact us
3.93 miles PrimeInterested in this information?Contact us
3.96 miles Point PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.02 miles Tower ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.04 miles Center ProInterested in this information?Contact us
4.07 miles Prime CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.28 miles Edge RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.30 miles Equinix Manassas DC14
4.36 miles CorScale: Gainesville 3
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
4.37 miles CorScale: Gainesville 4
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
4.39 miles Verizon: 7777 Infantry Ridge
Former AOL data center
4.42 miles CorScale: Gainesville 5
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
4.49 miles CorScale: Gainesville 2
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
4.60 miles Corscale: Gainesville 1
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
5.39 miles NTT: VA10
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
5.47 miles NTT: VA11
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
5.55 miles NTT: VA12
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
5.67 miles Gardner Property Project
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
5.69 miles NTT: VA13
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
5.77 miles North HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.79 miles John Marshall Commons Tech Park
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
5.86 miles Station TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.91 miles West PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.00 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.28 miles Compass: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
7.21 miles CyrusOne: Vint Hill
CyrusOne LLC, a data center developer and operator, submitted its first site plan to the county in March for an 870,000-square-foot data center campus.
7.23 miles QTS: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
7.29 miles OVH: Vint Hill Bldg 1
This facility, situated on the grounds of a former Army base in Vint Hill, became OVHcloud's first U.S. data center and officially began operations in 2017.
7.40 miles OVH: Vint Hill Bldg 2
OVHcloud currently plans an expansion of its existing data center, which currently calls the Vint Hill Business Park home.
7.62 miles Cloud ParkInterested in this information?Contact us
7.67 miles Headwaters: Catlett, VA
The Headwaters Site Development was a proposed $400 million data center project planned for a 67-acre site in the Catlett Station area of Fauquier County, Virginia.
7.82 miles West ValleyInterested in this information?Contact us
7.82 miles PlazaInterested in this information?Contact us
7.85 miles North CampusInterested in this information?Contact us
7.87 miles Vint Hill Corners
The Vint Hill Corners data center campus proposal, submitted by a company called Vint Hill Corners LLC, which owns about 80 acres on Brookside Parkway, seeks to develop two one-story data centers on about 50 acres of property at 4295 Aiken Drive in Vint Hill.
8.64 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.75 miles Dulles South Innovation Center
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
9.77 miles Parkstone Tech Park
10.24 miles Quantico Ridge Data Center
The Quantico Ridge data center project was effectively rejected and halted when the developer abruptly withdrew its rezoning application in May 2026.
10.33 miles Ridge PrimeInterested in this information?Contact us
11.50 miles Station AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.52 miles Metro TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.65 miles Global TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.75 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.78 miles Penzance: Chantilly Premier
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
11.94 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.96 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
11.96 miles Campus GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.03 miles Core HubInterested in this information?Contact us
12.05 miles GammaInterested in this information?Contact us
12.06 miles East ParkInterested in this information?Contact us
12.10 miles Metro HubInterested in this information?Contact us
12.12 miles NorthInterested in this information?Contact us
12.17 miles MaxInterested in this information?Contact us
12.17 miles Prime ParkInterested in this information?Contact us
12.18 miles Plaza MaxInterested in this information?Contact us
12.22 miles Tower AlphaInterested in this information?Contact us
12.33 miles Center AlphaInterested in this information?Contact us
12.35 miles Starwood: Stonecroft Blvd, Chantilly
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
12.50 miles Point PlusInterested in this information?Contact us
12.52 miles Plaza MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.55 miles Edge ValleyInterested in this information?Contact us
12.59 miles Valley GammaInterested in this information?Contact us
12.60 miles East CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.66 miles West TowerInterested in this information?Contact us
13.38 miles Maple Tree Farm
A 145-acre property known as Maple Tree Farm, located just east of Warrenton, is being marketed as a potential data center location.
13.42 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.54 miles NorthInterested in this information?Contact us
13.59 miles BetaInterested in this information?Contact us
13.62 miles CoreInterested in this information?Contact us
13.68 miles MetroInterested in this information?Contact us
13.69 miles HubInterested in this information?Contact us
13.70 miles Prime HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.71 miles UltraInterested in this information?Contact us
13.71 miles PowerHouse: Arcola Bldg A
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
13.74 miles Point OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.75 miles PowerHouse: Arcola Bldg B
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
13.78 miles South CenterInterested in this information?Contact us
13.93 miles JK Land: Technology Park 3
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
13.95 miles Center PlusInterested in this information?Contact us
13.98 miles Yondr: Arcola Expansion
Yondr is planning to expand capacity on an adjacent parcel of land.
14.02 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
14.05 miles East ParkInterested in this information?Contact us
14.07 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.07 miles JK Land: Technology Park 2
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
14.08 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.08 miles Edge TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.08 miles Yondr: Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
14.08 miles Prime PointInterested in this information?Contact us
14.13 miles Hiddenwood Assemblage Campus
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
14.15 miles Park AlphaInterested in this information?Contact us
14.16 miles Yondr: Arcola Bldg 1
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
14.19 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.20 miles HubInterested in this information?Contact us
14.20 miles Center AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.20 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.29 miles Core RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.38 miles Center OneInterested in this information?Contact us
14.42 miles HubInterested in this information?Contact us
14.46 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.52 miles JK Land: Technology Park 1
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
14.52 miles Station PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.58 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.59 miles JK Land: Tech Park 1 Expansion
14.66 miles ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.68 miles Valley BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.75 miles Station TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.80 miles PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.83 miles CyrusOne: NVA9 Bldg-1A
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
14.87 miles Stack: Loudoun 1
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
14.88 miles Stack: Loudoun 2
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
14.88 miles Global ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.89 miles CyrusOne: NVA9 Bldg-1B
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
14.91 miles CyrusOne: NVA9 Bldg-2
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
15.11 miles Digital Realty Dulles Expansion
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
15.15 miles Digital Realty: IAD44
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
15.15 miles Prologis: Sterling, VA
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
15.26 miles Digital Realty: IAD45
This facility is part of the Digital Dulles Campus in Sterling, VA.
16.12 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
16.33 miles Hyperscale Data CenterInterested in this information?Contact us
16.39 miles Hyperscale Data CenterInterested in this information?Contact us
16.45 miles Hyperscale Data CenterInterested in this information?Contact us
16.49 miles Hyperscale Data CenterInterested in this information?Contact us
16.74 miles CoreSite: VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
16.90 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
17.00 miles Dulles 2000 Campus
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
17.03 miles CoreSite: VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
17.03 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
17.09 miles Csquare: Dulles IAD3
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
17.11 miles CoreSite: VA2
17.30 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
17.32 miles Equinix Herndon DC97
17.34 miles WestInterested in this information?Contact us
17.41 miles H5: Herndon
17.41 miles Cloud HubInterested in this information?Contact us
17.43 miles Station ThreeInterested in this information?Contact us
17.45 miles Lumen Herndon 3
17.47 miles Lumen Herndon 1
17.47 miles Prime ValleyInterested in this information?Contact us
17.48 miles GlobalInterested in this information?Contact us
17.48 miles Prologis: Global Plaza Rd
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
17.52 miles EdgeInterested in this information?Contact us
17.55 miles Cloud PointInterested in this information?Contact us
17.55 miles Global ValleyInterested in this information?Contact us
17.57 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
17.57 miles South ValleyInterested in this information?Contact us
17.60 miles Center ProInterested in this information?Contact us
17.60 miles West CampusInterested in this information?Contact us
17.62 miles Centersquare: IAD2-B
17.64 miles Aligned IAD03
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
17.65 miles Centersquare: IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
17.65 miles CyrusOne Northern Virginia Sterling IV
17.66 miles TowerInterested in this information?Contact us
17.67 miles SDC: Import Plaza C
Building C is a single-story, 14,160 sq ft support building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, leased to Amazon Web Services as IAD-606.
17.67 miles West RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.68 miles Plaza TwoInterested in this information?Contact us
17.69 miles Prologis: Executive Drive
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
17.70 miles SDC: Import Plaza D
Building D is a planned 20,000 sq ft server storage building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, approved by Loudoun County in June 2026.
17.70 miles South PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.71 miles SDC: Import Plaza A
Building A is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2021 and leased to Amazon Web Services as IAD-161.
17.71 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.71 miles SDC: Import Plaza B
Building B is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2022 and leased to Amazon Web Services as IAD-162.
17.73 miles BetaInterested in this information?Contact us
17.75 miles Prime CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.77 miles SDC: Low Latency Lane 2
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
17.78 miles SDC: Low Latency Lane Expansion
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.
17.79 miles Station MaxInterested in this information?Contact us
17.80 miles Active Infra: Spring Valley 1
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
17.80 miles QTS Ashburn-Shellhorn DC1
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
17.82 miles RidgeInterested in this information?Contact us
17.84 miles MetroInterested in this information?Contact us
17.85 miles QTS: ASH2 DC2
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
17.85 miles Park ThreeInterested in this information?Contact us
17.86 miles East PointInterested in this information?Contact us
17.86 miles SDC: Low Latency Lane 1
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
17.88 miles QTS Ashburn-Shellhorn DC2
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
17.90 miles Peterson: Silverbrook
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
17.90 miles QTS: ASH2 DC1
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
17.91 miles West RidgeInterested in this information?Contact us
17.91 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
17.93 miles 44060 Digital Loudoun Plaza (Bldg K)
17.94 miles 43940 Digital Loudoun Plaza (Bldg G)
17.97 miles RidgeInterested in this information?Contact us
17.99 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
18.00 miles EdgeCore: Ashburn AS02
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
18.01 miles 44100 Digital Loudoun Plaza (Bldg J)
18.01 miles 43881 Devin Shafron (Bldg B)
18.02 miles 43780 Digital Loudoun Plaza (Bldg H)
18.02 miles Digital Realty: IAD55
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
18.04 miles 43831 Devin Shafron (Bldg C)
18.05 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
18.06 miles Stack: NVA04A
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
18.06 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.06 miles BetaInterested in this information?Contact us
18.07 miles 43791 Devin Shafron (Bldg D)
18.08 miles 43915 Devin Shafron (Bldg A)
18.09 miles Plaza TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.11 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
18.13 miles CloudHQ: LC4
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
18.14 miles Prime CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.15 miles CloudHQ: LC8
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
18.15 miles Campus UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.15 miles Stack: NVA04B
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
18.16 miles 43830 Devin Shafron (Bldg F)
18.16 miles Deft: DRT-IAD1
18.17 miles Metro PointInterested in this information?Contact us
18.18 miles Point ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.19 miles 43790 Devin Shafron (Bldg E)
18.23 miles Stack: NVA04C
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
18.23 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.23 miles CloudHQ: LC10
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
18.25 miles CloudHQ: LC9
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
18.25 miles North TowerInterested in this information?Contact us
18.29 miles CloudHQ: LC12
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
18.30 miles CloudHQ: LC13
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
18.30 miles Vantage VA16
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
18.30 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
18.31 miles Connect Data Centers: Sterling, VA
18.32 miles Menlo: MD-DC2 (Sterling)
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
18.34 miles Vantage VA15
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
18.34 miles Digital Realty: IAD43
18.38 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
18.39 miles CloudHQ: LC14
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
18.40 miles Vantage: VA23
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
18.40 miles CloudHQ: LC11
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
18.41 miles Vantage: VA21
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
18.46 miles Sentinel: Cloud Plaza, Sterling, VA
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
18.47 miles Vantage: VA22
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
18.52 miles PowerHouse: Pacific Bldg C
PowerHouse Pacific Building C is a three-story, 352,000 sq ft hyperscale data center shell under construction at 22279 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
18.52 miles Active Infra: Spring Valley Expansion
18.54 miles 44372 Round Table: Digital Realty
18.55 miles Vantage VA12
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
18.56 miles PowerHouse: Pacific Bldg B
PowerHouse Pacific Building B is a three-story, 354,000 sq ft hyperscale data center shell under construction at 22214 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
18.59 miles 44274 Round Table (Bldg L)
18.59 miles Digital Realty: Broderick Drive
18.60 miles CloudHQ: LC5
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
18.61 miles Vantage VA11
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
18.62 miles Vantage VA14
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
18.62 miles Vantage VA13
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
18.66 miles Regency DC Campus Ashburn
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
18.67 miles Aligned: IAD-02
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
18.67 miles PowerHouse: Pacific Bldg A
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.
18.71 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
18.72 miles 44751 Round Table (Bldg P)
18.76 miles Quantum Connect: Ashburn, VA
A data center is under construction at the Quantum business park in Ashburn, Virginia.
18.78 miles CloudHQ: LC1B
18.79 miles CloudHQ: LC1A
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
18.81 miles Equinix DC13
18.88 miles CloudHQ: LC3
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
18.89 miles Sabey Intergate: Ashburn Bldg-A
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
18.89 miles Sabey Intergate: Ashburn Bldg-B
18.90 miles Aligned: IAD-01
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
18.91 miles Dulles 28 Technology Park
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
18.92 miles CloudHQ LC2
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
18.93 miles 21744 Sir Timothy Drive (ACC10)
18.94 miles DataCanopy: Ashburn 1
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
18.96 miles DataBank Ashburn IAD4
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
18.96 miles DataBank Ashburn IAD1
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
18.98 miles FastServ Ashburn
18.98 miles Sabey Intergate: Ashburn Bldg-C
Intergate.Ashburn is a purpose-built data center campus on 38 acres
19.01 miles Equinix DC21
19.02 miles 21745 Sir Timothy (ACC9) Digital Realty
19.02 miles Core PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.06 miles NTT: VA7
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
19.11 miles Digital Realty: IAD-56
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
19.12 miles DataBank Ashburn IAD3
19.12 miles NTT: VA6
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
19.14 miles Equinix: DC22
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
19.15 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
19.15 miles NTT: VA9
19.16 miles Equinix Ashburn DC6
19.16 miles Equinix Ashburn DC11
19.16 miles Lightedge: Ashburn
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
19.19 miles Equinix Ashburn DC5
19.19 miles Equinix Ashburn DC1
19.20 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
19.21 miles Equinix Ashburn DC4
19.22 miles Cologix: Ashburn Expansion (Beaumeade Circle)
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
19.23 miles Point ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.23 miles NTT VA5
19.24 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
19.25 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
19.27 miles SAMX data center campus
SAMX Data LLC submitted an application in October 2023 to rezone approximately 55.26 acres of property at 11825 Remington Road.
19.28 miles Point PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.30 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
19.32 miles NTT: VA8
19.34 miles Cologix: ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
19.36 miles Central RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.37 miles NTT VA4
19.41 miles Dulles 28 Centre Motorplex
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
19.45 miles 44521 Hastings (ACC5) Digital Realty
19.45 miles Cologix: ASH2
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
19.47 miles Paragon Park Lot 3B
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
19.47 miles 44520 Hastings (ACC3) Digital Realty
19.48 miles 21710 Charles View
19.48 miles PrimeInterested in this information?Contact us
19.51 miles Rackspace Ashburn IAD3
19.51 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
19.53 miles PointOne: Remington Expansion
19.53 miles PowerHouse ABX1
19.54 miles 44490 Chilum (ACC2): Digital Realty
19.57 miles Cyrusone: Beaumeade Circle
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
19.58 miles PointOne: Remington 1
First building of PointOne's Remington Technology Park on Lucky Hill Road in Remington, Virginia, one of five planned buildings on the 234-acre campus.
19.59 miles 44470 Chillum - Digital Realty
19.60 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
19.61 miles Convergent Technology Park
Convergent VA has submitted revised conceptual plans for the Convergent Technology Park in Remington, Fauquier County, Virginia.
19.64 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
19.65 miles Lumen Ashburn
19.65 miles Gigaland: Remington, VA
Gigaland has scrapped its initial plans for an 800MW data center campus in Fauquier County, Virginia, after facing local opposition. However, the company now plans to propose a smaller project for the site.
19.65 miles North RidgeInterested in this information?Contact us
19.66 miles 21641 Charles View
19.68 miles Digital Realty: 21561 Beaumeade Cir
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
19.69 miles Centersquare: Ashburn WDC1
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
19.71 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
19.72 miles DataCanopy: Ashburn 2
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
19.76 miles Equinix DC15
19.77 miles East PointInterested in this information?Contact us
19.81 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
19.83 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.83 miles NTT VA2
19.85 miles Equinix DC16
19.88 miles Equinix: DC17
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
19.90 miles CyrusOne: Broadlands Expansion
19.90 miles PointOne: IAD2
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
19.91 miles Equinix: DC18
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
19.92 miles Station MaxInterested in this information?Contact us
19.94 miles CyrusOne: Broadlands Boulevard 1
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
19.98 miles TwoInterested in this information?Contact us

Stack: NVA02E Data Center Photos See all

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

STACK Infrastructure is a privately held platform sponsored by IPI Partners that focuses on large scale wholesale capacity and campus development for hyperscale and enterprise customers.

The company was launched in 2019 when IPI combined the remaining Infomart Data Centers assets with selected T5 Data Centers facilities, and industry coverage at launch cited eight data centers across six U.S. markets totaling about 100 MW. In March 2022, IPI unified DigiPlex in the Nordics and SUPERNAP Italia in Milan under the STACK brand to form STACK EMEA, expanding the platform across Europe. STACK has since added international sites, including the first phase of a 56 MW campus in Toronto and its first Australian data center in Melbourne. Core services referenced by the company and trade press include wholesale colocation, build to suit, and powered shell solutions.

STACK Infrastructure History:

  • 2025: Sold its European enterprise colocation business (seven data centers in Stockholm, Oslo, Copenhagen, Milan and Geneva) to Apollo-managed funds; it now operates as Vaultica. STACK EMEA kept its hyperscale campuses.
  • 2023: Opened the first Australian data center in Melbourne on a multi-building campus.
  • 2023: Delivered the first 8 MW phase of a planned 56 MW campus in Toronto.
  • 2022: Rebranded DigiPlex (Nordics) and SUPERNAP Italia (Milan) as STACK EMEA.
  • 2019: IPI Partners launched STACK Infrastructure by combining the three Infomart Data Centers sites with selected T5 Data Centers assets. The company was rebranded as STACK INFRASTRUCTURE
  • 2018: ASB Real Estate Investments sold the three remaining Infomart Data Centers facilities in San Jose, Hillsboro, and Ashburn to IPI Partners; the Dallas Infomart carrier hotel was sold separately to Equinix earlier that year.
  • 2014: Acquired a facility in Ashburn that had been owned by AOL.
  • 2014: ASB Real Estate Fund, a subsidiary of DCI Technology Holdings, merged Infomart with Fortune Data Centers. The combined company was renamed to Infomart Data Centers.
  • 2012: Expanded to Oregon with a building in Hillsboro
  • 2007: John Sheputis purchased first Fortune Data Center in San Jose, CA, backed by ASB Real Estate
  • 2006: ASB Real Estate purchased Infomart Dallas building
  • 2006: Fortune Founded as Fortune Data Centers
0
Facilities
0
Markets

News See all

Read Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium
State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's grow...

Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium

October 15, 2026 Virginia

State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's growth in the world's largest data center market. Senate Bill 843 would take effect July 1, 2027 and...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations
Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

August 23, 2024 Northern Virginia

A report from Synergy Research Group found that just twenty state or metro markets account for 62 percent of the world’s current hyperscale data center capacity. Northern Virginia tops this list while the Greater Beijing Area takes the second place, with both making up 22 percent of global...

Read more
Read Stack Infrastructure breaks ground on 60MW data center expansion in California
 Stack Infrastructure breaks ground on 60MW data center expansion in California

Stack Infrastructure breaks ground on 60MW data center expansion in California

March 29, 2024 STACK INFRASTRUCTURE

IPI-owned company Stack Infrastructure announced this week that it has broken ground on a 60MW data center expansion in Silicon Valley, California. The company plans to build two data centers to add 60MW of capacity, an advanced manufacturing facility, and a parking structure, spanning 19 acres....

Read more
Read Stack Infrastructure to expand footprint in Virginia
Stack Infrastructure to expand footprint in Virginia

Stack Infrastructure to expand footprint in Virginia

January 11, 2024 STACK INFRASTRUCTURE

Data center firm Stack Infrastructure this week announced plans to expand its footprint in Virginia with a new 72MW campus in Leesburg. in Loudoun County. This planned facility, known as the NVA-06 will initially host a 48MW building set to deliver Q2 2025, followed by a second 24MW building to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?