The Virginia Data Center Map Has 186 Sites

Search Virginia's Data Centers


Virginia Data Center List

Equinix Ashburn Campus
21715 Filligree Court
Ashburn, VA 20147
Located in Ashburn: Data Center Alley
  • 573,032 Gross SqFt
  • 37.0 Megawatts

Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.

RagingWire Ashburn VA3
21583 Megawatt Drive
Ashburn VA 20147
Located in Ashburn: Data Center Alley
  • 245,000 Gross SqFt
  • 16.0 Megawatts

RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.

Iron Mountain Northern Virginia (Manassas)
11650 Hayden Rd
Manassas, VA 20109
Located in Northern Virginia
  • 100,000 Gross SqFt
  • 10.5 Megawatts

Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.

  • VA-1, the first building on the campus, is a 165,000Sqft facility with 10.5 MW of power.
Digital Realty Loudoun Ashburn Campus
43881 Devin Shafron Drive
Ashburn, VA 20146
Located in Ashburn: Data Center Alley
  • 80.0 Megawatts
  • 1,700,000 Building SqFt

The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.

CoreSite Reston Campus VA1 VA2
12100 Sunrise Valley Drive
Reston, VA 20191
Located in Northern Virginia
  • 285,000 Gross SqFt
  • 25.0 Megawatts

VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.


Virginia Data Center Tax Incentives

Sales and use tax abatements are available to data centers that have a minimum investment of $150 million, hire at least 50 new employees and pay at least 150 percent of the prevailing wage. Changes to the law made since its introduction made colocation data center tenants eligible for the tax abatements, as well, aggregating their equipment purchases, investments and new hires to meet the capital investment requirements of the law. If the unemployment rate of the locality where the data center is constructed is 150 percent of the state average the new hire requirement drops to 25 people.





Top Data Center Providers in Virginia

Sites Sites Gross SqFt Gross SqFt Power (MW) Power (MW)
Digital Realty Trust 30 3,105,260 534.25
Equinix 16 1,143,574 119.60
QTS Data Centers 7 803,650 225.72
Cyxtera Technologies 6 556,457 56.40
RagingWire 2 535,000 44.40
{{ provider.company_name }} {{ provider.sites_count_for_region }} {{ provider.sqft_for_region }} {{ provider.power_mw_for_region }}

Largest Data Centers in Virginia

Gross SqFt Gross SqFt Power (MW) Power (MW)
Equinix Ashburn Campus 573,032 37.00
QTS Richmond 550,000 44.00
21625 Gresham (ACC7) Digital Realty 446,000 41.60
44521 Hastings (ACC4) Digital Realty 360,000 36.40
44480 Hastings (ACC4) Digital Realty 347,000 36.40
{{ datacenter.site_name }} {{ datacenter.total_gross_sqft }} {{ datacenter.total_power_mw }}

Top Virginia Datacenter Markets by # of Sites

Loading...

Top Virginia Datacenter Markets by Power Capacity (MW)

Loading...

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
MAREA and BRUSA cables are now landing in Virginia Beach. The Virginia Beach landing port provides an alternative to NY and Flordia landing stations.
The lot currently has a 211,125-square-foot, two-story church, child care center, and
private school building.
150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.
RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.
The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.
RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.
The facility serves two primary clients: Northrop Grumman IT and the Virginia Information Technologies Agency, which oversees the state’s technology infrastructure.
Suites available as of 2017
The inertia flywheel provides conditioned uninterrupted power to data center equipment
Ready for a customer deployment
The site was previously built and operated by Infomart before rebranding to STACK in January 2019.
Photo taken in September 2018
Workers finishing up the final conduit tie ins on Corporate Landing Parkway Virginia Beach VA.  Globalinx will now have 3 diverse point of entry conduit systems coming into our Phase I Data Center ...
Satellite view of the Digital Realty Trust's new building and its proximity to Equinix Ashburn, and Cologix's new site
Site work began in February 2018, just five months after the project was announced, thanks to Henrico County’s fast permitting approval program and the development-ready site at White Oak Technolog...
In September 2018, Facebook announced an expansion from two buildings to five. This graphic shows the layout
Yellow = EdgeConnex's data center
Pink = Space for lease
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Posted in Northern Virginia

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

MAREA and BRUSA cables are now landing in Virginia Beach. The Virginia Beach landing port provides an alternative to NY and Flordia landing stations.
Subsea Cables Landing in Virginia Beach
Posted in Virginia Beach

MAREA and BRUSA cables are now landing in Virginia Beach. The Virginia Beach landing port provides an alternative to NY and Flordia landing stations.

Source: Virginia Beach Economic DEvelopment Board
Map of Virginia Beach Data Centers and Corporate Landing Business Park
Posted in Virginia Beach Source: City of Virginia Beach
The lot currently has a 211,125-square-foot, two-story church, child care center, and
private school building.
Cologix Land Acquisition in Ashburn
Posted in Cologix Ashburn ASH1

The lot currently has a 211,125-square-foot, two-story church, child care center, and
private school building.

Source: Board of Supervisors
The Christian Fellowship Church will be Converted into a Cologix Data Center
Posted in Cologix Ashburn ASH1
Aerial View of Digital Realty's Ashburn Campus
Posted in Digital Realty Loudoun Ashburn Campus
IAD50, 60, and 71
Posted in Amazon IAD71
Microsoft's Boydton Virginia Data Center
Posted in Microsoft Boydton VA Source: Microsoft Austria
Microsoft's Boydton Data Center Expansion (in Progress) as of 2018
Posted in Microsoft Boydton VA Source: Google Maps
Entrance and Campus View
Posted in Equinix Culpeper Campus
150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.
Layout Diagram of VA1 Building
Posted in RagingWire Ashburn VA1/VA2

150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.

Source: RagingWire
Computer Room Inside VA1
Posted in RagingWire Ashburn VA1/VA2 Source: RagingWire
Proposed Campus Layout
Posted in CloudHQ Ashburn Campus
Exterior View
Posted in CloudHQ Manassas MCC1 Source: CloudHQ
Drone shot of the facility on 9340 Godwin Drive
Posted in QTS Manassas
The Manassas facility as construction was completing in February 2019
Posted in QTS Manassas
QTS's Site in Sandston (Richmond)
Posted in QTS Richmond
RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.
Lobby of VA3
Posted in RagingWire Ashburn VA3

RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.

Source: RagingWire
The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.
Planned Ashburn Campus Building Layout
Posted in RagingWire Ashburn VA3

The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.

Source: RagingWire
RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.
Ashburn Campus Building Overview
Posted in RagingWire Ashburn VA3

RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.

Source: RagingWire
Satellite View Next to IAD74
Posted in Amazon IAD-73
AWS Facility IAD-73
Posted in Amazon IAD-73
The facility serves two primary clients: Northrop Grumman IT and the Virginia Information Technologies Agency, which oversees the state’s technology infrastructure.
Bird's eye view
Posted in Virginia Information Technologies Agency

The facility serves two primary clients: Northrop Grumman IT and the Virginia Information Technologies Agency, which oversees the state’s technology infrastructure.

Front Gate
Posted in COPT DC-6
Campus View
Posted in COPT DC-6
DC6 Substation Connections
Posted in COPT DC-6
Suites available as of 2017
DC6 Suites
Posted in COPT DC-6

Suites available as of 2017

Main Distribution Switchgear
Posted in COPT DC-6
The inertia flywheel provides conditioned uninterrupted power to data center equipment
HITEC Flywheel
Posted in COPT DC-6

The inertia flywheel provides conditioned uninterrupted power to data center equipment

Ready for a customer deployment
An Empty Data Hall
Posted in COPT DC-6

Ready for a customer deployment

Outside of "The Vault"
Posted in QTS Moran (The Vault) Source: QTS
Drone photo of the Ashburn-Moran facility
Posted in QTS Moran (The Vault) Source: QTS
AWS Facility IAD-74
Posted in Amazon IAD-74
The site was previously built and operated by Infomart before rebranding to STACK in January 2019.
STACK Ashburn Site Layout
Posted in STACK Northern Virginia

The site was previously built and operated by Infomart before rebranding to STACK in January 2019.

Source: Stack Infra
Artist Rendering of Infomart Ashburn
Posted in STACK Northern Virginia Source: Infomart Data Centers
Infomart Ashburn Lobby
Posted in STACK Northern Virginia Source: Infomart Data Centers
Planned 5 Building Campus
Posted in Vantage Ashburn
Rendering of one of the Ashburn Vantage data centers
Posted in Vantage Ashburn
Photo taken in September 2018
First Ashburn Facility Under Construction
Posted in Vantage Ashburn

Photo taken in September 2018

Source: Vantage Data Centers
Proposed Multi-Phase Layout
Posted in Globalinx Virginia Beach Source: Globallinx
Rendering of the New Data Center
Posted in Globalinx Virginia Beach Source: Five9s
Workers finishing up the final conduit tie ins on Corporate Landing Parkway Virginia Beach VA.  Globalinx will now have 3 diverse point of entry conduit systems coming into our Phase I Data Center ...
Trenching final conduits for subsea cable connection
Posted in Globalinx Virginia Beach

Workers finishing up the final conduit tie ins on Corporate Landing Parkway Virginia Beach VA. Globalinx will now have 3 diverse point of entry conduit systems coming into our Phase I Data Center that will be tied into MAREA AND BRUSA subsea cables.

Source: Globalinx Twitter
Outside of 1275 K Street - DC's Carrier Hotel
Posted in CoreSite DC1 - 1275 K Street NW
Entrance to CoreSite's DC1
Posted in CoreSite DC1 - 1275 K Street NW Source: CoreSite
424-Acre Lot to the West of Dulles Airport
Posted in Digital Realty Dulles Source: CBRE
MWAA Aerial View of 424-Acre Parcel
Posted in Digital Realty Dulles Source: Metropolitan Washington Airports Authority
Telxius Subsea Cable Network
Posted in Telxius Cable Landing Station Virginia Beach Source: Telxius
Building Floor and Landscape Plan
Posted in Telxius Cable Landing Station Virginia Beach
Satellite view of the Digital Realty Trust's new building and its proximity to Equinix Ashburn, and Cologix's new site
DRT Acquired 21780 Filigree in May 2019
Posted in 21780 Filigree: Digital Realty

Satellite view of the Digital Realty Trust's new building and its proximity to Equinix Ashburn, and Cologix's new site

Equinix DC11 at Night
Posted in Equinix Ashburn Campus Source: Equinix
Equinix DC6
Posted in Equinix Ashburn Campus Source: PARADIGM
DC6 Under Construction
Posted in Equinix Ashburn Campus Source: PARADIGM
DC6 Under Construction
Posted in Equinix Ashburn Campus Source: PARADIGM
Site work began in February 2018, just five months after the project was announced, thanks to Henrico County’s fast permitting approval program and the development-ready site at White Oak Technolog...
The First Two Data Centers Take Shape
Posted in Facebook Henrico

Site work began in February 2018, just five months after the project was announced, thanks to Henrico County’s fast permitting approval program and the development-ready site at White Oak Technology Park.

Source: VEDP-Virginia Economic Development Partnership
In September 2018, Facebook announced an expansion from two buildings to five. This graphic shows the layout
Henrico Campus Expansion Layout
Posted in Facebook Henrico

In September 2018, Facebook announced an expansion from two buildings to five. This graphic shows the layout

aerial view of the CyrusOne Sterling II Data Center Near Ashburn
Posted in CyrusOne Northern Virginia Sterling I, II, III Source: CyrusOne
Location of Building J on Campus
Posted in 44100 Digital Loudoun Plaza (Bldg J) Source: DRT
Outside of Building J
Posted in 44100 Digital Loudoun Plaza (Bldg J) Source: DRT
View of VA2 from the Entrance of VA1
Posted in CoreSite Reston Campus VA1 VA2
Conference Room in VA2
Posted in CoreSite Reston Campus VA1 VA2 Source: CoreSite
Lobby of VA2
Posted in CoreSite Reston Campus VA1 VA2 Source: CoreSite
CoreSite VA3 Under Construction
Posted in CoreSite Reston VA3 Source: CoreSite
Yellow = EdgeConnex's data center
Pink = Space for lease
Space Adjacent to Existing Data Center
Posted in EdgeConneX Norfolk

Yellow = EdgeConnex's data center
Pink = Space for lease

Rendering of the DP facility in Wise County
Posted in DP Facilities: Mineral Gap
Under Construction at 22271 Broderick Drive in Ashburn
Posted in QTS Ashburn 1 Source: QTS
Site Plan Diagram of QTS's Ashburn 1 Site
Posted in QTS Ashburn 1 Source: QTS
Aerial View of QTS's Ashburn Data Center
Posted in QTS Ashburn 1
Pre-Construction Rendering of the Facility at 22271 Broderick Drive
Posted in QTS Ashburn 1
VA-1 Launch Event in September 2017
Posted in Iron Mountain Northern Virginia (Manassas) Source: WTOP