Verizon: 4301 Connecticut

Latest Podcast
4301 Connecticut Avenue NW
Operational
Fully operational facility
Operated by:

Verizon: 4301 Connecticut

Year Built: 1998
░░░░ Request Dataset MW
Total Power

Map and Nearby Locations:

4301 Connecticut Avenue NW ( 1st Floor )
Verizon Enterprise Sites
Nearby Facilities

Sites within 15 miles of Verizon: 4301 Connecticut

Distance Site About
3.07 miles Lumen DC4
3.22 miles Verizon: 1120 Vermont
Former XO Communications site
3.22 miles Cogent: 1120 Vermont
3.22 miles Lumen DC 1
3.33 miles CoreSite DC2
3.42 miles Verizon: 1220 L
3.42 miles Lumen DC2
3.44 miles CoreSite DC1 - 1275 K Street NW
1275 K Street is Washington DC's Network Hotel
8.17 miles Lumen McLean 1
8.24 miles DataBank McLean IAD2
In 2020, DataBank acquired the site from zColo.
8.77 miles Element Critical VA1
8.81 miles Equinix Vienna DC7
8.99 miles 8100 Boone - Digital Realty
9.08 miles Cogent Vienna
9.46 miles 12401 Prosperity Dr: Lincoln Rackhouse
12401 Prosperity Dr. is an enterprise grade, highly-secure data center located just 15 miles north of Washington D.C., in Silver Spring, MD.
9.48 miles DataBridge: Silver Spring MD
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
9.49 miles Equinix Vienna DC8
9.71 miles TAC: Northern Virginia
TAC Data Centers is partnering to develop a premier hyperscale data center on a 125-acre site in Northern Virginia, the world’s most dynamic data center market.
10.50 miles AiNET Beltsville WDC-1
10.70 miles Starwood: Alexandria, VA
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
11.24 miles Lerner: Landover Expansion
11.32 miles Lerner: Landover, MD
13.23 miles TPC: Konterra 1
TPC Data Center is planning its first data center in Prince George's County at 6201 Frost Place in Laurel, close to the Burtonsville substation.
14.17 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
14.29 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
14.46 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
15.48 miles Hyperscale Data Center Request Dataset
The site was previously occupied by two office buildings that were constructed about 10 years ago but never fully occupied. These buildings, located at 7951 and 7961 Loisdale Road, were demolished in early June 2023.
15.83 miles AiNET Laurel SCIF
16.16 miles CoreSite VA2
16.19 miles CoreSite Reston Campus VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
16.19 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
16.55 miles CoreSite Reston VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
16.88 miles H5: Herndon
17.07 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
17.13 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
17.15 miles Lumen Herndon 3
17.16 miles Lumen Herndon 1
17.96 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
18.87 miles Hyperscale Data Center Request Dataset
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
18.91 miles Hyperscale Data Center Request Dataset
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
18.95 miles Hyperscale Data Center Request Dataset
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
19.14 miles Peterson: Silverbrook
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
19.16 miles Hyperscale Data Center Request Dataset
19.17 miles Hyperscale Data Center Request Dataset
19.18 miles Hyperscale Data Center Request Dataset
19.27 miles Hyperscale Data Center Request Dataset
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
19.28 miles Connect Data Centers: Sterling, VA
19.30 miles Hyperscale Data Center Request Dataset
19.30 miles Hyperscale Data Center Request Dataset
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
19.39 miles Hyperscale Data Center Request Dataset
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
19.42 miles Hyperscale Data Center Request Dataset
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
19.42 miles Hyperscale Data Center Request Dataset
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
19.43 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
19.47 miles Hyperscale Data Center Request Dataset
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
19.48 miles Hyperscale Data Center Request Dataset
19.48 miles Hyperscale Data Center Request Dataset
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
19.50 miles Centersquare: Sterling DC4
19.51 miles CyrusOne Sterling VIII
19.53 miles Hyperscale Data Center Request Dataset
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
19.54 miles 21110 Ridgetop
The site is fully leased to triple net tenants.
19.55 miles Centersquare: Sterling DC2
19.55 miles Centersquare: IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
19.57 miles EdgeCore Ashburn
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
19.58 miles Hyperscale Data Center Request Dataset
19.58 miles Hyperscale Data Center Request Dataset
19.59 miles Centersquare: IAD2-B
19.60 miles Hyperscale Data Center Request Dataset
19.60 miles Hyperscale Data Center Request Dataset
19.64 miles Hyperscale Data Center Request Dataset
19.65 miles CyrusOne Northern Virginia Sterling IV
19.66 miles Hyperscale Data Center Request Dataset
19.66 miles Dulles 2000 Campus
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
19.67 miles Centersquare: Sterling DC3
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
19.67 miles CyrusOne Northern Virginia Sterling I, II, III
19.70 miles Hyperscale Data Center Request Dataset
19.73 miles Hyperscale Data Center Request Dataset
19.86 miles Hyperscale Data Center Request Dataset
19.86 miles COPT: 45761 Maries Rd
19.94 miles Hyperscale Data Center Request Dataset
19.94 miles COPT: 45771 Maries Rd
19.98 miles Vantage: VA23
This facility is part of Vantage's Ashburn VA2 Campus in Virginia.

Verizon: 4301 Connecticut Data Center Photos (See all)

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:
66
Facilities
41
Markets
63MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?