|
3.07 miles
|
Lumen DC4
|
|
|
3.12 miles
|
Cogent: 1050 Connecticut
|
Cogent Communications runs its Washington DC 2 data center inside the Washington Square office building at 1050 Connecticut Avenue NW, in the District's Golden Triangle. The carrier-neutral facility offers cabinets and private cages on Cogent's network, with several other carriers on site.
|
|
3.22 miles
|
Verizon: 1120 Vermont
|
Verizon network site in the multi-carrier office building at 1120 Vermont Avenue NW in Washington, DC, a former XO Communications colocation facility.
|
|
3.22 miles
|
Lumen DC 1
|
|
|
3.22 miles
|
Cogent: 1120 Vermont
|
|
|
3.35 miles
|
CoreSite DC2
|
|
|
3.42 miles
|
Verizon: 1220 L
|
|
|
3.42 miles
|
Lumen DC2
|
|
|
3.44 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|
|
8.15 miles
|
Lumen McLean 1
|
|
|
8.25 miles
|
DataBank McLean IAD2
|
DataBank McLean IAD2 is a 3 MW data center in McLean, Fairfax County, Virginia, with 40,690 sq ft of IT space.
|
|
8.77 miles
|
Serverfarm: Vienna NVA1
|
A planned data center at 7980 Quantum Drive in Vienna, Virginia, the first phase of Serverfarm's Vienna Cloud campus.
|
|
8.80 miles
|
Equinix Vienna DC7
|
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC7 in Q2 2026.
|
|
8.80 miles
|
Serverfarm: Vienna 7990 Quantum Drive
|
A data center at 7990 Quantum Drive in Vienna, Virginia, near Tysons, that Serverfarm bought in 2025. Element Critical ran it as VA1.
|
|
8.80 miles
|
Serverfarm: Vienna NVA2
|
A planned data center at 7990 Quantum Drive in Vienna, Virginia, the second phase of Serverfarm's Vienna Cloud campus.
|
|
8.99 miles
|
8100 Boone - Digital Realty
|
|
|
9.08 miles
|
Cogent Vienna
|
|
|
9.46 miles
|
Sansone: Silver Spring, MD
|
In August 2025, commercial real estate firm Sansone Group partnered with anchor tenant Priseda to acquire the 214,000-square-foot, Tier IV-quality data center in Silver Spring, Maryland, for approximately $29 million.
|
|
9.48 miles
|
DataBridge: Silver Spring MD
|
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
|
|
9.49 miles
|
Equinix Vienna DC8
|
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC8 in Q4 2020.
|
|
10.50 miles
|
AiNET Beltsville WDC-1
|
|
|
10.70 miles
|
Starwood: Alexandria, VA
|
Starwood Capital's planned two-building data center campus at Plaza 500, 6295 Edsall Road, near Alexandria in Fairfax County, Virginia.
|
|
11.24 miles
|
Brightseat Tech Park Expansion
|
|
|
11.32 miles
|
Brightseat Tech Park
|
|
|
13.23 miles
|
TPC: Konterra 1
|
TPC Data Center is planning its first data center in Prince George's County at 6201 Frost Place in Laurel, close to the Burtonsville substation.
|
|
14.17 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
14.29 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
A single-story colocation data center at 1807 Michael Faraday Court in Reston, Virginia, with about 900 kW of critical IT capacity.
|
|
15.22 miles
|
Edge Centres: Reston EC104
|
Edge Centres' EC104 carrier-hotel data center at 11513 Sunset Hills Road in Reston, Virginia, a former Switch & Data site of about 15,000 sq ft.
|
|
15.29 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.48 miles
|
CloudInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.83 miles
|
AiNET Laurel SCIF
|
|
|
16.16 miles
|
CoreSite: VA2
|
|
|
16.18 miles
|
QuadraNet Reston
|
QuadraNet hosting space at CoreSite's Reston campus in Northern Virginia.
|
|
16.19 miles
|
CoreSite: VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
16.54 miles
|
CoreSite: VA3 Phase 2
|
CoreSite: VA3 Phase 2 is a three-story data center building under construction on CoreSite's VA3 campus in Reston, Virginia.
|
|
16.59 miles
|
CoreSite: VA4
|
CoreSite: VA4 is a planned data center on CoreSite's Reston campus in Northern Virginia, covering the later phases of the VA3 campus plan.
|
|
16.60 miles
|
CoreSite: VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
16.88 miles
|
H5: Herndon
|
|
|
16.91 miles
|
Equinix Herndon DC97
|
Equinix DC97 is a leased colocation data center at 460 Springpark Place in Herndon, Virginia. Terremark opened it in 2005 as a regional exchange; Verizon acquired Terremark in 2011 and sold the site to Equinix in 2017.
|
|
17.07 miles
|
Cogent: 510 Huntmar
|
Former Cogent Communications data center at 510 Huntmar Park Drive in Herndon, Virginia. Cogent left the building in 2024, and it has been marketed for lease as a data center since.
|
|
17.13 miles
|
Lincoln Rackhouse 251 Exchange
|
251 Exchange Place in Herndon, Virginia, is a former data center, once Digital Realty's and Lincoln Rackhouse's, that became the Beanstalk vertical farm and headquarters in 2022.
|
|
17.15 miles
|
Lumen Herndon 3
|
|
|
17.16 miles
|
Lumen Herndon 1
|
|
|
17.96 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
18.87 miles
|
Tower GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.91 miles
|
North HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.95 miles
|
Plaza ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.14 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
19.16 miles
|
MetroInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.17 miles
|
Central HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.18 miles
|
Campus UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.21 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.27 miles
|
TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.28 miles
|
Connect Data Centers: Sterling, VA
|
Connect Data Centers, the data center arm of Oppidan Investment, is developing a 256,280-square-foot purpose-built data center at 22620 Davis Drive in Sterling, Virginia.
|
|
19.28 miles
|
TA Digital: Terminal Dr
|
TA Digital Group, TA Realty's data center arm, is planning IAD05, a 306,915 sq ft data center at 45680 Terminal Drive in Sterling.
|
|
19.29 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.30 miles
|
Metro PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.30 miles
|
Park UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.33 miles
|
Starwood: Renaissance IAD06 (Building F)
|
Two-story data center, Building F of the Word of Grace parcel at Renaissance Technology Park in Herndon, developed by a Starwood affiliate.
|
|
19.37 miles
|
Starwood: Renaissance IAD05 (Building E)
|
Two-story data center, Building E of the Word of Grace parcel at Renaissance Technology Park in Herndon, developed by a Starwood affiliate.
|
|
19.39 miles
|
MetroInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.42 miles
|
PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.42 miles
|
Metro RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.43 miles
|
Menlo: MD-DC1 (Herndon)
|
MD-DC1 is a two-story data center under construction by Menlo Digital on McLearen Road in Herndon, Fairfax County, Virginia.
|
|
19.44 miles
|
Tower OneInterested in this information?Contact us
|
|
|
19.48 miles
|
TowerInterested in this information?Contact us
|
|
|
19.48 miles
|
MetroInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.50 miles
|
Csquare: IAD1-C/D/E
|
Csquare IAD1-C/D/E is the largest of three buildings on Csquare's IAD1 colocation campus in Sterling, Virginia, at 21110 Ridgetop Circle, holding data halls IAD1-C, D and E. Built in 2001, it ran as Cyxtera's DC4 until Centersquare, now Csquare, took over Cyxtera's data centers in 2024.
|
|
19.51 miles
|
CyrusOne: NVA8
|
|
|
19.53 miles
|
Kyndryl: Sterling
|
Kyndryl runs a small colocation suite (site US2) inside Csquare's IAD1 data center at 21110 Ridgetop Circle in Sterling.
|
|
19.53 miles
|
ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.54 miles
|
21110 Ridgetop
|
A 135,513 sq ft data center building in Sterling, owned by a Mapletree joint venture, where Csquare (formerly Cyxtera) runs part of its IAD1 data center.
|
|
19.55 miles
|
Csquare: IAD1-A
|
Csquare IAD1-A is one of three buildings on Csquare's IAD1 colocation campus in Sterling, Virginia, at 45901 Nokes Boulevard. Built in 1998, it ran as Cyxtera's DC2 until Centersquare, now Csquare, took over Cyxtera's data centers in 2024.
|
|
19.55 miles
|
45901 Nokes
|
A data center building in Sterling owned by a Mapletree joint venture, where Csquare runs hall IAD1-A of its IAD1 data center.
|
|
19.55 miles
|
Csquare: IAD2-A
|
Csquare IAD2-A is one of two buildings on Csquare's IAD2 colocation site at 22810 International Drive in Sterling, Virginia, linked to the IAD1 campus by dark fiber. It ran as Cyxtera's DC5 until Centersquare, now Csquare, took over Cyxtera's data centers in 2024.
|
|
19.57 miles
|
EdgeCore Ashburn
|
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
|
19.58 miles
|
CloudInterested in this information?Contact us
|
|
|
19.58 miles
|
Campus BetaInterested in this information?Contact us
|
|
|
19.59 miles
|
Csquare: IAD2-B
|
Csquare IAD2-B is the larger of two buildings on Csquare's IAD2 colocation site at 22860 International Drive in Sterling, Virginia, linked to the IAD1 campus by dark fiber. It came to Centersquare, now Csquare, with Cyxtera's data centers in 2024.
|
|
19.60 miles
|
RidgeInterested in this information?Contact us
|
|
|
19.60 miles
|
Center PrimeInterested in this information?Contact us
|
|
|
19.63 miles
|
365: Herndon
|
365 Data Centers' colocation facility at 13873 Park Center Road in Herndon, Virginia, with about 12,000 sq ft of data center space.
|
|
19.64 miles
|
AlphaInterested in this information?Contact us
|
|
|
19.65 miles
|
CyrusOne: NVA4
|
|
|
19.66 miles
|
Prime ParkInterested in this information?Contact us
|
|
|
19.66 miles
|
Dulles 2000 Campus
|
BlackChamber Group proposed two data center buildings totaling 530,000 square feet on Shaw Road in Sterling, Virginia. The plan stalled in 2021, and the landowner has since filed to rezone the tract for housing.
|
|
19.67 miles
|
Csquare: IAD1-B
|
Csquare IAD1-B is one of three buildings on Csquare's IAD1 colocation campus in Sterling, Virginia, at 45845 Nokes Boulevard. Built in 1999, it ran as Cyxtera's DC3 until Centersquare, now Csquare, took over Cyxtera's data centers in 2024.
|
|
19.67 miles
|
45845 Nokes
|
A data center building in Sterling owned by a Mapletree joint venture, where Csquare runs hall IAD1-B of its IAD1 data center.
|
|
19.67 miles
|
CyrusOne: NVA1-NVA3
|
|
|
19.70 miles
|
Center ProInterested in this information?Contact us
|
|
|
19.72 miles
|
SouthInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.73 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.86 miles
|
Ridge GammaInterested in this information?Contact us
|
|
|
19.86 miles
|
COPT: 45761 Maries Rd
|
COPT Defense Properties powered data center shell on Maries Road in Sterling, Virginia, leased to a cloud provider.
|
|
19.94 miles
|
CampusInterested in this information?Contact us
|
|
|
19.94 miles
|
COPT: 45771 Maries Rd
|
COPT Defense Properties powered data center shell on Maries Road in Sterling, Virginia, leased to a cloud provider.
|