3.22 miles
|
Verizon: 1120 Vermont
|
Former XO Communications site
|
3.22 miles
|
Level3 Washington
|
|
3.22 miles
|
Cogent: 1120 Vermont
|
|
3.33 miles
|
CoreSite DC2
|
|
3.42 miles
|
Verizon: 1220 L
|
|
3.44 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|
8.17 miles
|
Lumen McLean 1
|
|
8.24 miles
|
DataBank McLean IAD2
|
In 2020, DataBank acquired the site from zColo.
|
8.77 miles
|
Element Critical VA1
|
|
8.81 miles
|
Equinix Vienna DC7
|
|
8.99 miles
|
8100 Boone - Digital Realty
|
|
9.08 miles
|
Cogent Vienna
|
|
9.43 miles
|
Agile Silver Spring MD
|
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
|
9.46 miles
|
12401 Prosperity Dr: Lincoln Rackhouse
|
12401 Prosperity Dr. is an enterprise grade, highly-secure data center located just 15 miles north of Washington D.C., in Silver Spring, MD.
|
9.49 miles
|
Equinix Vienna DC8
|
|
10.50 miles
|
AiNET Beltsville WDC-1
|
|
11.26 miles
|
Lerner: Maryland, WA
|
|
14.17 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
14.29 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
14.29 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
14.46 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
15.08 miles
|
InfoRelay Reston
|
|
15.48 miles
|
Amazon: 7951 Loisdale
|
|
15.53 miles
|
Amazon: 7951 Loisdale Rd
|
Amazon is building a 120,000 sq ft, two-story data center at 7951 & 7961 Loisdale Rd, Springfield, VA.
|
15.83 miles
|
AiNET Laurel SCIF
|
|
16.19 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
16.19 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
16.55 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
16.90 miles
|
Equinix DC97
|
|
17.07 miles
|
Cogent: 510 Huntmar
|
|
17.13 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
17.15 miles
|
Lumen Herndon 3
|
|
17.16 miles
|
Lumen Herndon 1
|
|
17.96 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
18.87 miles
|
AWS: 45930 Pathfinder Plz
|
|
18.87 miles
|
45900 Pathfinder Plz
|
|
19.03 miles
|
AWS: 45950 Pathfinder Plz
|
|
19.16 miles
|
Amazon IAD-141
|
|
19.18 miles
|
Amazon IAD140
|
|
19.27 miles
|
Amazon: 46020 Manekin Plz
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
19.30 miles
|
Amazon: 45975 Nokes Blvd
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
19.39 miles
|
Amazon: 21660 Ridgetop Cir
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
19.42 miles
|
Amazon: 21680 Ridgetop Cir
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
19.45 miles
|
Renaissance Technology Park
|
Renaissance Technology Park in Oak Hill is redeveloping their site with 2,136,040 square feet into data centers.
|
19.50 miles
|
Cyxtera Sterling DC4
|
|
19.51 miles
|
CyrusOne Sterling VIII
|
|
19.54 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
19.55 miles
|
Cyxtera Sterling DC2
|
|
19.55 miles
|
Amazon IAD-166
|
|
19.55 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
19.57 miles
|
EdgeCore Ashburn
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
19.58 miles
|
Amazon EDS (Bldg C)
|
|
19.58 miles
|
AWS: 22868 International Dr
|
|
19.59 miles
|
Cyxtera IAD2-B
|
|
19.63 miles
|
Amazon EDS Herndon Campus
|
|
19.63 miles
|
InfoRelay Herndon
|
|
19.63 miles
|
Amazon EDS (Bldg D)
|
|
19.63 miles
|
Amazon IAD-175
|
|
19.65 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
19.66 miles
|
Amazon IAD-69
|
|
19.67 miles
|
Cyxtera Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
19.69 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
19.70 miles
|
AWS: 22945 International Dr
|
|
19.86 miles
|
COPT: 45761 Maries Rd
|
|
19.96 miles
|
COPT: 45751 Maries Rd
|
|