Verizon: 1120 Vermont

Year Built: 2002
Ownership: Verizon Enterprise does not own the building.
░░░ Request Dataset MW
Operational Power

Former XO Communications site

Map and Nearby Locations

1120 Vermont Avenue NW ( 2nd Floor )
Verizon Enterprise Sites
Nearby Facilities

Verizon: 1120 Vermont Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Verizon: 1120 Vermont

Distance Site About
0.01 miles Lumen DC 1
0.01 miles Cogent: 1120 Vermont
0.10 miles CoreSite DC2
0.24 miles Verizon: 1220 L
0.24 miles Lumen DC2
0.25 miles CoreSite DC1 - 1275 K Street NW
1275 K Street is Washington DC's Network Hotel
0.43 miles Cogent: 1050 Connecticut
Cogent Communications runs its Washington DC 2 data center inside the Washington Square office building at 1050 Connecticut Avenue NW, in the District's Golden Triangle. The carrier-neutral facility offers cabinets and private cages on Cogent's network, with several other carriers on site.
0.54 miles Lumen DC4
3.22 miles Verizon: 4301 Connecticut
6.93 miles TAC: Northern Virginia
TAC Data Centers is partnering to develop a premier hyperscale data center on a 125-acre site in Northern Virginia, the world’s most dynamic data center market.
9.20 miles Starwood: Alexandria, VA
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
9.54 miles Brightseat Tech Park Expansion
9.59 miles Brightseat Tech Park
9.69 miles Lumen McLean 1
9.75 miles DataBank McLean IAD2
In 2020, DataBank acquired the site from zColo.
10.04 miles Element Critical VA1
10.08 miles Equinix Vienna DC7
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC7 in Q2 2026.
10.39 miles 8100 Boone - Digital Realty
10.46 miles Cogent Vienna
11.22 miles Sansone: Silver Spring, MD
In August 2025, commercial real estate firm Sansone Group partnered with anchor tenant Priseda to acquire the 214,000-square-foot, Tier IV-quality data center in Silver Spring, Maryland, for approximately $29 million.
11.24 miles Equinix Vienna DC8
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC8 in Q4 2020.
11.24 miles DataBridge: Silver Spring MD
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
11.74 miles AiNET Beltsville WDC-1
13.93 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.57 miles TPC: Konterra 1
TPC Data Center is planning its first data center in Prince George's County at 6201 Frost Place in Laurel, close to the Burtonsville substation.
16.10 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
16.21 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
16.39 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
16.83 miles AiNET Laurel SCIF
18.09 miles CoreSite: VA2
18.10 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
18.10 miles CoreSite: VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
18.45 miles CoreSite: VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
18.91 miles H5: Herndon
18.93 miles Equinix Herndon DC97
Equinix DC97 is a leased colocation data center at 460 Springpark Place in Herndon, Virginia. Terremark opened it in 2005 as a regional exchange; Verizon acquired Terremark in 2011 and sold the site to Equinix in 2017.
19.09 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
19.09 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
19.20 miles Lumen Herndon 3
19.21 miles Lumen Herndon 1
19.86 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.

Verizon: 1120 Vermont Data Center Photos See all

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Verizon Signs $2B-Plus Dark Fiber Deal With AWS
[Verizon](https://baxtel.com/data-centers/verizon-enterprise) will supply dark fiber to Amazon Web Services ([AWS](https://baxtel.com/data-centers/amazon-aws)) under an agreement worth more than $2...

Verizon Signs $2B-Plus Dark Fiber Deal With AWS

October 27, 2026 Amazon AWS

Verizon will supply dark fiber to Amazon Web Services (AWS) under an agreement worth more than $2 billion, the carrier said on Oct. 26. Verizon disclosed the deal in its third-quarter results. The carrier provides the high-capacity fiber links, and AWS is the customer that uses that connectivity...

Read more
Read Verizon Secures Approval for $20bn Frontier Acquisition
Verizon Secures Approval for $20bn Frontier Acquisition

Verizon Secures Approval for $20bn Frontier Acquisition

January 16, 2026 Verizon Enterprise

Verizon has secured all regulatory approvals to close its acquisition of Frontier Communications. It comes as the carrier this week received approval from the California Public Utilities Commission (CPUC) to push ahead with the deal.“California isn’t just approving a merger, we’re securing real...

Read more
Read Verizon Names Dan Schulman as CEO
Verizon Names Dan Schulman as CEO

Verizon Names Dan Schulman as CEO

October 06, 2025 Verizon Enterprise

Verizon has announced former PayPal CEO Dan Schulman as the carrier's next CEO. The CEO transition at the company means that current chief Hans Vestberg steps down from the role, which he has held since 2018.“I believe in Verizon and its future, and I am honored to be chosen to serve as CEO,”...

Read more
Read Verizon Launches AI-centric Network ffering
Verizon Launches AI-centric Network ffering

Verizon Launches AI-centric Network ffering

January 27, 2025 Verizon Enterprise

Verizon has launched a new AI-centric network offering called Verizon AI Connect, an integrated suite of solutions and products designed to “enable businesses to deploy artificial intelligence (AI) workloads at scale.” The telco s looking to make its underutilized data center assets available for...

Read more
Read Verizon kickstarts construction of new cell tower in Texas
Verizon kickstarts construction of new cell tower in Texas

Verizon kickstarts construction of new cell tower in Texas

February 21, 2024 Verizon Enterprise

Verizon has started construction of a new cell tower at Fort Bliss Army Post in El Paso, Texas. This tower will be constructed by Boldyn Networks and will provide connectivity to service military personnel in Texas and New Mexico. “Verizon supports our military partners through a number of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?