0.01 miles
|
Lumen DC 1
|
|
|
0.01 miles
|
Cogent: 1120 Vermont
|
|
|
0.10 miles
|
CoreSite DC2
|
|
|
0.24 miles
|
Verizon: 1220 L
|
|
|
0.24 miles
|
Lumen DC2
|
|
|
0.25 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|
|
0.43 miles
|
Cogent: 1050 Connecticut
|
Cogent Communications runs its Washington DC 2 data center inside the Washington Square office building at 1050 Connecticut Avenue NW, in the District's Golden Triangle. The carrier-neutral facility offers cabinets and private cages on Cogent's network, with several other carriers on site.
|
|
0.54 miles
|
Lumen DC4
|
|
|
3.22 miles
|
Verizon: 4301 Connecticut
|
|
|
6.93 miles
|
TAC: Northern Virginia
|
TAC Data Centers is partnering to develop a premier hyperscale data center on a 125-acre site in Northern Virginia, the world’s most dynamic data center market.
|
|
9.20 miles
|
Starwood: Alexandria, VA
|
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
|
|
9.54 miles
|
Brightseat Tech Park Expansion
|
|
|
9.59 miles
|
Brightseat Tech Park
|
|
|
9.69 miles
|
Lumen McLean 1
|
|
|
9.75 miles
|
DataBank McLean IAD2
|
In 2020, DataBank acquired the site from zColo.
|
|
10.04 miles
|
Element Critical VA1
|
|
|
10.08 miles
|
Equinix Vienna DC7
|
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC7 in Q2 2026.
|
|
10.39 miles
|
8100 Boone - Digital Realty
|
|
|
10.46 miles
|
Cogent Vienna
|
|
|
11.22 miles
|
Sansone: Silver Spring, MD
|
In August 2025, commercial real estate firm Sansone Group partnered with anchor tenant Priseda to acquire the 214,000-square-foot, Tier IV-quality data center in Silver Spring, Maryland, for approximately $29 million.
|
|
11.24 miles
|
Equinix Vienna DC8
|
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC8 in Q4 2020.
|
|
11.24 miles
|
DataBridge: Silver Spring MD
|
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
|
|
11.74 miles
|
AiNET Beltsville WDC-1
|
|
|
13.93 miles
|
SouthInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.57 miles
|
TPC: Konterra 1
|
TPC Data Center is planning its first data center in Prince George's County at 6201 Frost Place in Laurel, close to the Burtonsville substation.
|
|
16.10 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
16.21 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
16.39 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
16.83 miles
|
AiNET Laurel SCIF
|
|
|
18.09 miles
|
CoreSite: VA2
|
|
|
18.10 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
18.10 miles
|
CoreSite: VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
18.45 miles
|
CoreSite: VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
18.91 miles
|
H5: Herndon
|
|
|
18.93 miles
|
Equinix Herndon DC97
|
Equinix DC97 is a leased colocation data center at 460 Springpark Place in Herndon, Virginia. Terremark opened it in 2005 as a regional exchange; Verizon acquired Terremark in 2011 and sold the site to Equinix in 2017.
|
|
19.09 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
19.09 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
19.20 miles
|
Lumen Herndon 3
|
|
|
19.21 miles
|
Lumen Herndon 1
|
|
|
19.86 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|