0.06 miles
|
Amazon: 7951 Loisdale
|
|
11.66 miles
|
Element Critical VA1
|
|
11.68 miles
|
Equinix Vienna DC7
|
|
12.05 miles
|
Cogent Vienna
|
|
12.08 miles
|
8100 Boone - Digital Realty
|
|
12.39 miles
|
DataBank McLean IAD2
|
In 2020, DataBank acquired the site from zColo.
|
12.41 miles
|
Lumen McLean 1
|
|
13.42 miles
|
Equinix Vienna DC8
|
|
13.94 miles
|
CoreSite DC2
|
|
13.97 miles
|
Verizon: 1120 Vermont
|
Former XO Communications site
|
13.98 miles
|
Level3 Washington
|
|
13.98 miles
|
Cogent: 1120 Vermont
|
|
13.99 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|
14.02 miles
|
Verizon: 1220 L
|
|
15.53 miles
|
Verizon: 4301 Connecticut
|
|
16.18 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
16.25 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
16.25 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
16.38 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
16.54 miles
|
AWS: Nokesville Road Campus
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction will soon begin on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
16.84 miles
|
InfoRelay Reston
|
|
16.84 miles
|
CloudHQ MCC3
|
|
16.85 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
16.91 miles
|
CloudHQ MCC2
|
|
16.92 miles
|
Digital Realty: 9905 Godwin
|
|
17.13 miles
|
AWS 10261 Tanner
|
|
17.15 miles
|
AWS 10281 Tanner Way
|
|
17.24 miles
|
AWS IAD 101
|
|
17.26 miles
|
AWS IAD 100
|
|
17.33 miles
|
Digital Realty: IAD51
|
|
17.33 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
17.33 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
17.45 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
17.51 miles
|
Parkstone Tech Park
|
|
17.64 miles
|
QTS Manassas DC1
|
|
17.74 miles
|
AWS: 10453 Wakeman Drive
|
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
|
17.74 miles
|
QTS 10680 University Blvd
|
QTS is looking to expand its existing footprint in Prince William County. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
17.75 miles
|
AWS: 8501 Vulcan Ln
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
17.78 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
17.79 miles
|
Amazon: 9740 Innovation Drive
|
Amazon is building another data center in it's Innovation Drive campus.
|
17.87 miles
|
Amazon: IAD-106
|
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
|
17.88 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
17.90 miles
|
Amazon: IAD-105
|
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
|
17.93 miles
|
9020 Freedom Center
|
|
17.98 miles
|
Amazon EDS (Bldg C)
|
|
17.99 miles
|
9040 Freedom Center
|
|
18.00 miles
|
Equinix Manassas DC14
|
|
18.00 miles
|
AWS: 8401 Vulcan Lane Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
18.00 miles
|
Amazon IAD1
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
18.01 miles
|
Amazon: IAD-104
|
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
|
18.02 miles
|
Amazon IAD-166
|
|
18.02 miles
|
Amazon EDS Herndon Campus
|
|
18.02 miles
|
QTS Manassas DC5
|
|
18.05 miles
|
Amazon IAD9
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
18.06 miles
|
Amazon IAD22
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
18.09 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
18.11 miles
|
Amazon EDS (Bldg D)
|
|
18.21 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
18.22 miles
|
Amazon: 3980 Virginia Mallory Dr
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
18.33 miles
|
Amazon: 14501 Avion Pkwy
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
18.35 miles
|
Equinix DC97
|
|
18.38 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
18.47 miles
|
Amazon: 11150 Thomasson Barn
|
|
18.50 miles
|
Cogent: 510 Huntmar
|
|
18.54 miles
|
Amazon: 11200 Thomasson Barn
|
|
18.55 miles
|
Renaissance Technology Park
|
Renaissance Technology Park in Oak Hill is redeveloping their site with 2,136,040 square feet into data centers.
|
18.62 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
18.62 miles
|
Amazon IAD-77
|
|
18.62 miles
|
Evoswitch USA WDC 1
|
|
18.62 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
18.63 miles
|
InfoRelay Herndon
|
|
18.69 miles
|
Stack: NVA02C
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
|
18.69 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
18.71 miles
|
Lumen Herndon 3
|
|
18.71 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
18.72 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
18.73 miles
|
Lumen Herndon 1
|
|
18.88 miles
|
Stack: NVA02D
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
18.98 miles
|
Stack: NVA02E
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
19.09 miles
|
Microsoft: Jacksonville Road
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
19.15 miles
|
Amazon 7500 Bethlehem
|
|
19.17 miles
|
Amazon Bethlehem Technology Park DC18
|
|
19.18 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
19.22 miles
|
Microsoft: MNZ02
|
Microsoft has begun work on a new data center campus in Prince William County, Virginia. Microsoft is constructing two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet.
|
19.22 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
19.26 miles
|
Amazon IAD7
|
|
19.27 miles
|
Amazon: 8190 Bethlehem
|
|
19.28 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
19.32 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
19.32 miles
|
Amazon Bethlehem Technology Park DC19
|
|
19.32 miles
|
IBM Softlayer Chantilly WDC01
|
|
19.34 miles
|
Amazon IAD24
|
|
19.39 miles
|
Amazon IAD11
|
|
19.40 miles
|
Amazon Bethlehem Technology Park DC20
|
|
19.46 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
19.47 miles
|
Opus Interactive Manassas
|
|
19.53 miles
|
AWS: 7350 Century Park
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
19.55 miles
|
Iron Mountain VA-2
|
|
19.61 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
19.68 miles
|
AWS: 7151 Century Park Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
19.74 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
19.79 miles
|
Amazon IAD14
|
|
19.80 miles
|
Amazon IAD-52
|
|
19.84 miles
|
Amazon 25420 Sutton Bay
|
|
19.84 miles
|
Amazon IAD-59
|
|
19.88 miles
|
Amazon 25410 Sutton Bay
|
|