CoreSite Reston Campus VA1 VA2

12100 Sunrise Valley Drive

░░░░░░░ Login to view SqFt Total Building Size

░░░░░░░ Login to view SqFt Gross Colocation Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

VA1:

CoreSite acquired VA1 in 2008. The building was previously known as Sunrise Technology Park and was used by America Online.

VA2:

The VA2 data center meets stringent government and defense contractor security requirements with features including 50 foot setbacks, internal and external CCTV surveillance, biometric scanner checkpoints and 24/7 on-site security. The renovation of this SAS70 Type II facility required the coordination of multiple 35.5 kilovolt power feeds and tie ins to the building’s central cooling plant to provide 2,800 tons of air conditioning in the space.

To accommodate the power feeds and cooled air delivery systems, 24-inch antistatic raised flooring was installed. The completed data center’s power density is up to 25 kilowatts per cabinet and is capable of accommodating nearly 12 critical megawatts of IT load.

Site Address SqFt Power
VA1 12100 Sunrise Valley Drive, Reston, VA 285,000 13 MWs
VA2 12098 Sunrise Valley Drive, Reston, VA 198,000 12 MWs

Compliance:

  • HIPAA
  • Infrastructure and physical security standards support HIPAA compliance Certifications
  • ISO 27001 certified
  • PCI DSS certified
  • SOC 1 Type 2 and SOC 2 Type 2 certified
  • ENERGY STAR and LEED Gold certified

Map and Nearby Locations:

12100 Sunrise Valley Drive
Click Map to begin Search

Sites within 15 miles of CoreSite Reston Campus VA1 VA2

Show SqM
Distance Site About
0.00 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
0.39 miles CoreSite Reston VA3
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
1.02 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
1.03 miles Equinix DC97
1.12 miles InfoRelay Reston
1.18 miles Cogent: 510 Huntmar
1.38 miles Lumen Herndon 3
1.40 miles Lumen Herndon 1
1.73 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
1.78 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
1.90 miles VPLS DC1
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
2.02 miles ANEXIO Reston
2.02 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
3.51 miles 45900 Pathfinder Plz
3.57 miles AWS: 45930 Pathfinder Plz
3.60 miles InfoRelay Herndon
3.67 miles AWS: 22900 Platform Plz
3.70 miles AWS: 45950 Pathfinder Plz
3.90 miles Amazon 13600 EDS Drive
3.91 miles AWS: 22868 International Dr
3.94 miles Cyxtera IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
3.96 miles Cyxtera IAD2-B
3.99 miles AWS: 22945 International Dr
4.04 miles CyrusOne Northern Virginia Sterling IV
4.77 miles Cyxtera Sterling DC7
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
4.78 miles Amazon IAD-51
4.79 miles Amazon IAD-56
4.80 miles Vantage VA2 Campus
4.83 miles Amazon IAD-58
4.88 miles Amazon 22420 Kipper
4.89 miles Amazon IAD-57
4.96 miles Amazon 22370 Kipper
4.98 miles Amazon 45111 Loudoun Downs
5.01 miles Amazon IAD-88
5.19 miles Amazon IAD12
5.20 miles Aligned IAD03
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
5.26 miles EdgeCore: Sterling, NV
EdgeCore plans a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
5.26 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
5.27 miles Vantage Ashburn Campus
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
5.29 miles Amazon IAD16
5.31 miles Sentinel Ashburn
5.31 miles Vantage VA12
5.32 miles Vantage VA11
5.33 miles Amazon IAD15
5.39 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
5.40 miles Vantage VA13
5.49 miles Amazon IAD76
5.53 miles CyrusOne Sterling VIII
5.59 miles EdgeCore: Maries Road, Sterling, VA
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
5.59 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
5.66 miles Cyxtera Sterling DC2
5.68 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
5.70 miles Cyxtera Sterling DC4
5.73 miles 21110 Ridgetop - Digital Realty
The site is fully leased to triple net tenants.
5.75 miles Cyxtera Sterling DC3
5.80 miles PowerHouse Pacific
5.82 miles QTS Ashburn Lockridge
5.83 miles COPT: 45761 Maries Rd
5.86 miles Amazon IAD-69
5.87 miles CyrusOne Northern Virginia Sterling I, II, III
5.91 miles Digital Realty: IAD43
5.91 miles Sentinel Washington Dulles Gateway
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
5.92 miles Amazon IAD9
5.94 miles Digital Realty: Broderick Drive
5.95 miles COPT: 45751 Maries Rd
6.02 miles Amazon 45305 Severn
6.03 miles Amazon IAD1
6.06 miles 21710 Charles View
6.07 miles Amazon IAD22
6.11 miles Amazon 45259 Severn
6.14 miles Penzance: Chantilly Premier
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
6.15 miles Amazon IAD10
6.19 miles 21641 Charles View
6.19 miles Amazon IAD32
6.30 miles Stack: Northern Virginia NVA04
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
6.32 miles CyrusOne Northern Virginia Sterling V
6.39 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
6.41 miles IBM Softlayer Chantilly WDC01
6.41 miles Equinix DC21
6.42 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
6.46 miles 44751 Round Table (Bldg P)
6.48 miles EdgeCore Ashburn
6.49 miles 44351 Import Plz
6.53 miles Amazon 25420 Sutton Bay
6.59 miles Amazon 25430 Sutton Bay IAD150
6.60 miles 21780 Filigree: Digital Realty
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
6.62 miles PowerHouse ABX1
6.66 miles Amazon 25020 Willard Road
6.66 miles Amazon Willard Road (Land)
6.66 miles Amazon 25410 Sutton Bay
6.67 miles Import Plz, Ashburn
6.70 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
6.70 miles VPLS IAD
6.72 miles CloudHQ Ashburn Campus
6.73 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
6.73 miles Equinix Ashburn DC6
6.73 miles Equinix Ashburn DC11
6.74 miles QTS Ashburn-Shellhorn DC2
6.75 miles CloudHQ LC2
6.77 miles Equinix DC15
6.79 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
6.79 miles QTS Ashburn-Shellhorn
6.81 miles Equinix Ashburn Campus
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
6.81 miles 44274 Round Table (Bldg L)
6.82 miles Equinix Ashburn DC1
6.82 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
6.85 miles Evoque Ashburn WDC1
24x7x365 on-site staff
6.87 miles Equinix Vienna DC8
6.87 miles 44372 Round Table: Digital Realty
6.88 miles Equinix Ashburn DC5
6.89 miles 21744 Sir Timothy Drive (ACC10)
6.92 miles Equinix Ashburn DC4
6.93 miles Cologix Ashburn ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
6.94 miles Amazon 44854 Interconnection
6.95 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
6.95 miles ANEXIO VA1
6.96 miles Digital Realty Dulles
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
6.98 miles Amazon 44858 Interconnection Plaza
7.01 miles 44520 Hastings (ACC3) Digital Realty
7.01 miles 21745 Sir Timothy (ACC9) Digital Realty
7.03 miles Lumen Ashburn
7.03 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
7.03 miles ANEXIO ACC5
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
7.05 miles 44490 Chilum Place: Digital Realty
7.06 miles 44060 Digital Loudoun Plaza (Bldg K)
7.06 miles 43780 Digital Loudoun Plaza (Bldg H)
7.06 miles 44100 Digital Loudoun Plaza (Bldg J)
7.06 miles 43940 Digital Loudoun Plaza (Bldg G)
7.06 miles Amazon IAD-67
7.09 miles Equinix DC13
7.10 miles Amazon 44862 Interconnection Plaza
7.11 miles 44521 Hastings (ACC2) Digital Realty
7.11 miles ANEXIO Ashburn IAD4
7.13 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
7.15 miles Aligned Ashburn
The first building on the Aligned 26-acre campus was launched in September 2019.
7.15 miles ServerCentral Ashburn DC3
7.15 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
7.15 miles 44521 Hastings (ACC4) Digital Realty
7.15 miles 44470 Chillum - Digital Realty
7.16 miles NTT VA2
7.21 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
7.21 miles Rackspace Ashburn IAD3
7.24 miles Digital Realty Loudoun Ashburn Campus
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
7.24 miles Aligned IAD02
7.26 miles 43915 Devin Shafron (Bldg A)
7.27 miles Amazon IAD61
7.29 miles Amazon IAD-63
7.30 miles 43881 Devin Shafron (Bldg B)
7.31 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
7.37 miles Amazon Prediction Lane
7.38 miles Amazon IAD60
7.41 miles 43830 Devin Shafron (Bldg F)
7.42 miles 43831 Devin Shafron (Bldg C)
7.42 miles Amazon IAD71
7.42 miles NTT Ashburn Campus
7.46 miles Amazon IAD50
7.47 miles AWS: 20935 Loudoun County Pkwy
7.48 miles NTT VA5
7.50 miles 43790 Devin Shafron (Bldg E)
7.50 miles Sabey Intergate.Ashburn
Intergate.Ashburn is a purpose-built data center campus on 38 acres
7.51 miles AWS: 20945 Loudoun County Pkwy
7.52 miles Amazon IAD-54
7.52 miles 43791 Devin Shafron (Bldg D)
7.54 miles NTT VA4
7.57 miles CyrusOne Sterling IX
7.61 miles Sabey Intergate.Ashburn (Building A)
7.73 miles Databank Ashburn IAD1
In December 2020, Databank acquired the site from Zayo.
7.74 miles FastServ Ashburn
7.82 miles Cogent Vienna
7.83 miles DataBank Ashburn IAD3
7.88 miles 8100 Boone - Digital Realty
8.15 miles Visa Eastern US Ashburn
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
8.27 miles Equinix Vienna DC7
8.32 miles Element Critical VA1
8.34 miles Amazon Fadeley I
8.38 miles Amazon Fadeley II
8.41 miles DataBank McLean IAD2
8.46 miles Lumen McLean 1
8.48 miles Amazon Fadeley III
8.52 miles XO Fairfax
8.79 miles Google Dulles Arcola Center
8.81 miles Google: Arcola 2
9.22 miles PowerHouse Arcola
9.92 miles Amazon 41992 John Mosby Highway
9.95 miles Yondr Arcola, VA
The campus's first building was delivered in late 2023.
10.28 miles Microsoft IAD11
10.43 miles Microsoft Aldie
11.29 miles Compass Loudoun County
11.73 miles Vantage VA3 Campus
11.81 miles Google Leesburg Stonewall Park
12.31 miles TA Realty: Leesburg
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
12.82 miles AOL: 7777 Infantry Ridge
12.87 miles Equinix Manassas DC14
13.72 miles Microsoft Leesburg 1A
14.08 miles Stack: Northern Virginia, NVA06
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
14.32 miles Amazon 7500 Bethlehem
14.44 miles Amazon IAD7
14.49 miles Amazon IAD24
14.56 miles Amazon IAD11
14.76 miles Amazon IAD-59
14.80 miles Amazon IAD-52
14.86 miles Amazon IAD14
15.10 miles Amazon: 8190 Bethlehem
15.13 miles Amazon Bethlehem Technology Park DC18
15.19 miles Amazon Bethlehem Technology Park DC19
15.22 miles Amazon Bethlehem Technology Park DC20
15.37 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
15.45 miles Iron Mountain Northern Virginia (Manassas)
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
15.47 miles 9020 Freedom Center
15.47 miles Iron Mountain VA-2
15.56 miles 9040 Freedom Center
15.60 miles Opus Interactive Manassas
15.62 miles Stack: Northern Virginia NVA05
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
15.65 miles Corscale: Gainesville Crossing
15.73 miles QTS Manassas DC1
15.85 miles Amazon IAD-74
15.86 miles Amazon IAD-73
15.93 miles QTS Manassas DC5
15.99 miles QTS 10680 University Blvd
16.13 miles Microsoft: Gainesville, VA
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
16.19 miles XO (4301 Connecticut)
16.34 miles Amazon: 5945 Wellington
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
16.54 miles AWS 10261 Tanner
16.67 miles Amazon IAD-77
16.67 miles Evoswitch USA WDC 1
16.67 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
16.67 miles VAZATA Northern Virginia (NoVa One)
16.67 miles AWS 10281 Tanner Way
16.68 miles AWS IAD 101
16.71 miles Yondr Bristow Campus
16.79 miles AWS IAD 100
16.79 miles Amazon: 11150 Thomasson Barn
16.83 miles Stack: NVA02C
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
16.84 miles Amazon: 11200 Thomasson Barn
16.85 miles Stack: NVA02D
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
16.85 miles NTT Gainesville VA Campus
16.89 miles Stack: NVA02B
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
16.97 miles Stack: NVA02E
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
16.97 miles Stack: Northern Virginia, NVA02
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
17.31 miles CloudHQ MCC2
17.34 miles 8217 Linton Hall (VA4) Digital Realty
17.53 miles CloudHQ Manassas MCC1
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
17.68 miles CloudHQ MCC3
17.90 miles Amazon IAD-55
18.06 miles Amazon: 15455 John Marshall
18.10 miles XO: 1120 Vermont
18.11 miles Level3 Washington
18.11 miles Cogent: 1120 Vermont
18.12 miles Amazon 15465 John Marshall
18.18 miles CoreSite DC2
18.33 miles XO (1220 L)
18.33 miles CoreSite DC1 - 1275 K Street NW
1275 K Street is Washington DC's Network Hotel

CoreSite Reston Campus VA1 VA2 Data Center Photos


CoreSite VA3 Under Construction
Posted in CoreSite Reston VA3
Source: CoreSite

View of VA2 from the Entrance of VA1

Conference Room in VA2
Source: CoreSite

Lobby of VA2
Source: CoreSite
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Posted in Northern Virginia

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

CoreSite Realty is a data center REIT with a focus on network dense buildings. The company operates the Any2 Peering Exchange, which is the largest Internet Exchange in the Western US.

CoreSite History

CoreSite Realty Corporation was founded in 2001 as CRG West, a portfolio company of The Carlyle Group. CRG West initially started with two data center buildings; One Wilshire in Los Angeles and 55 South Market in San Jose. The buildings were popular network interconnection and peering points. Although 55 S Market has declined as an interconnection point, One Wilshire continues to be a popular building for network interconnection.

2007: Sold the Company's Jewel to Fuel Expansion

In August, the company sold the One Wilshire Building to Hines REIT for $287 million. The large transaction gave CRG West additional capital to fund the company's growth into new markets.

In May, CRG West acquires buildings in Chicago (for $34 million) and Sommerville just outside of Boston. The Chicago building at 427 S LaSalle was originally designed and built by Western Union. Western Union buildings have traditionally been converted into Carrier Hotels because the telegraph infrastructure with their risers of conduits works well for the telecom industry. The facility is situated across from One Financial Plaza and adjacent to the Chicago Board of Trade.

CoreSite Boston at 70 Innerbelt Road, Somerville, MA is located less than two miles from downtown Boston and Cambridge. The large building has SunGard and Internap as significant tenants also offering colocation

2008: Added Reston

CRG West acquired their Reston facility at 12100 Sunrise Valley.

2009: Rebranded

CRG West rebranded as CoreSite.

2010: IPO added More Capital to Expand

In September, CoreSite became publicly traded on the New York Stock Exchange (NYSE: COR). The Carlyle Group still owned ~50% of the newly public company at the time of the IPO. The Carlyle Group has since reduced their ownership to less than 30%.

2012 Added Denver

In April, CoreSite acquired Comfluent and their two Denver data centers. The data centers were small, but pivotal to the Denver Interconnection and Peering Market. DE1 is located in 910 15th Street, Denver's Telecom Hotel, the Denver Gas & Electric Building (DGEB.) Comfluent was the defacto meet me room for the building. DE2 was 639 E 18th Ave, which was adjacent to Level 3's Denver Gateway site.

CoreSite was headquarted in Denver, but until 2012 did not have any data centers in Colorado.

2013

SV5 was built and leased to a single tenant

2014: New Buildings

  • VA2 launched with an initial build of 50,000 of 198,000 sqft
  • NY2 launched with an initial build of 65,000 of 283,000 sqft

2016: Change at the Top

Tom Ray, CoreSite's CEO since inception retired. Paul Szurek became CoreSites new CEO.

In August, Sunrise Technology Park (STP) was acquired for $60 million with a plan to significantly expand the campus.

Reston Campus Expansions

12100 Sunrise Valley was first acquired in 2008 and CoreSite has since turned the Reston site into a campus. The company constructed a building (VA2) in the parking lot. In 2018, Coresite acquired a 22-acre lot a few blocks away at 12379 Sunrise Valley Drive. The lot will serve to virtually expand the Reston Campus.

The development has four phases and involves building new 3-story data centers and demolishing the old buildings. CoreSite has begun work on VA3 on the new lot.

27 Facilities Owned
18 Markets Served
219.0 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
coresite_brochure_virginia1-pdf May 2014

PDF Data Sheet for VA1. Circa 2014.

coresite_brochure_virginia2-pdf May 2014

PDF Data Sheet for VA2. Circa 2014.

0007-slk-mkt-nva-20150810-low July 2019

Overview of CoreSite's Northern Virginia Options