0.14 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
|
0.91 miles
|
Aligned: Manassas, VA
|
In 2022, Aligned acquired this plot in Manassas, Virginia.
|
|
1.22 miles
|
Edge ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
1.36 miles
|
Global PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
1.55 miles
|
Point ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
1.69 miles
|
Station MaxInterested in this information?Contact us
|
|
|
1.76 miles
|
Center UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
1.80 miles
|
MetroInterested in this information?Contact us
|
|
|
1.83 miles
|
Tower ThreeInterested in this information?Contact us
|
|
|
1.85 miles
|
Tower AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
1.85 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
1.88 miles
|
Iron Mountain: Manassas Point
|
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
|
|
1.94 miles
|
Campus GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
2.18 miles
|
Global PlazaInterested in this information?Contact us
|
|
|
2.18 miles
|
Center OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
2.18 miles
|
GammaInterested in this information?Contact us
|
|
|
2.22 miles
|
Park BetaInterested in this information?Contact us
|
|
|
2.25 miles
|
Center PlusInterested in this information?Contact us
|
|
|
2.27 miles
|
South PointInterested in this information?Contact us
|
|
|
2.28 miles
|
Cloud CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
2.34 miles
|
West ValleyInterested in this information?Contact us
|
|
|
2.38 miles
|
CenterInterested in this information?Contact us
|
|
|
2.47 miles
|
Iron Mountain: VA-7
|
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
|
|
2.61 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
|
2.63 miles
|
Iron Mountain VA-1
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
|
2.63 miles
|
Iron Mountain VA-2
|
|
|
2.64 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
|
2.66 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
|
2.67 miles
|
Stack: NVA05D
|
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
|
|
2.74 miles
|
Opus Interactive Manassas
|
|
|
2.76 miles
|
TPC: Manassas, VA
|
|
|
2.79 miles
|
Iron Mountain: VA-8
|
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
|
|
2.89 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
|
2.89 miles
|
Iron Mountain: VA-6
|
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
|
|
2.92 miles
|
Valley GammaInterested in this information?Contact us
|
|
|
2.92 miles
|
Stack: NVA05C
|
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
|
|
2.99 miles
|
BlackChamber: Gainesville, VA
|
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
|
|
3.00 miles
|
ProInterested in this information?Contact us
|
|
|
3.09 miles
|
CoreInterested in this information?Contact us
|
|
|
3.10 miles
|
Yondr: Manassas
|
Yondr and Cerberus have acquired land in Manassas for a new hyperscale data center campus targeted for service in 2029.
|
|
3.13 miles
|
Central StationInterested in this information?Contact us
|
|
|
3.13 miles
|
Stack: NVA05A
|
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
|
3.17 miles
|
ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.20 miles
|
Edge PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.27 miles
|
Tower BetaInterested in this information?Contact us
|
|
|
3.37 miles
|
QTS Manassas 1 DC5
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
3.45 miles
|
Center OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.46 miles
|
QTS: Manassas 1 DC3
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
3.49 miles
|
QTS: Manassas 1 DC1
|
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
|
3.50 miles
|
JK Land: Comcast Center
|
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
|
|
3.50 miles
|
QTS: Manassas 1 DC2
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
3.52 miles
|
CorScale: Gainesville 5
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
3.56 miles
|
Prime TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.56 miles
|
CorScale: Gainesville 4
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
3.58 miles
|
South PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.60 miles
|
Point ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.61 miles
|
QTS: Manassas 1 DC4
|
|
|
3.67 miles
|
QTS Manassas 1 DC6
|
This facility is part of QTS Manassas 1 Campus in Virginia.
|
|
3.71 miles
|
Metro PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.74 miles
|
Station PlusInterested in this information?Contact us
|
|
|
3.76 miles
|
Central RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.77 miles
|
CorScale: Gainesville 3
|
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
|
|
3.78 miles
|
Ridge MaxInterested in this information?Contact us
|
|
|
3.80 miles
|
Station UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.81 miles
|
Global PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.83 miles
|
Valley BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.84 miles
|
TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.85 miles
|
Corscale: Gainesville 1
|
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
|
|
3.86 miles
|
EastInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.86 miles
|
Black Chamber: Nokesville
|
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
|
|
3.89 miles
|
North HubInterested in this information?Contact us
|
|
|
3.90 miles
|
Cloud PlazaInterested in this information?Contact us
|
|
|
3.90 miles
|
Park OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.91 miles
|
PointInterested in this information?Contact us
|
|
|
3.91 miles
|
Central StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.91 miles
|
CorScale: Gainesville 2
|
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
|
|
3.94 miles
|
West PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.95 miles
|
Campus ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
3.99 miles
|
Core PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.01 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
|
4.01 miles
|
Evoswitch USA WDC 1
|
|
|
4.01 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
|
4.01 miles
|
Valley MaxInterested in this information?Contact us
|
|
|
4.08 miles
|
Stack: NVA02G
|
NVA02G is a 185,803 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 9530 Hornbaker Road in Manassas, Virginia.
|
|
4.16 miles
|
Compass: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
4.16 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.16 miles
|
Stack: NVA02D
|
NVA02D is a 281,000 sq ft data center building on STACK Infrastructure's NVA02 campus at 9590 Hornbaker Road in Manassas, Virginia.
|
|
4.20 miles
|
Stack: NVA02C
|
NVA02C, or Building C, is a 14,387 sq ft building on STACK Infrastructure's NVA02 campus at 9730 Hornbaker Road in Manassas, Virginia.
|
|
4.21 miles
|
West ValleyInterested in this information?Contact us
|
|
|
4.24 miles
|
Cloud PlazaInterested in this information?Contact us
|
|
|
4.25 miles
|
QTS: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
4.26 miles
|
CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.26 miles
|
Stack: NVA02B
|
NVA02B is a 224,652 sq ft data center building on STACK Infrastructure's NVA02 campus at 9740 Hornbaker Road in Manassas, Virginia.
|
|
4.29 miles
|
Yondr Bristow Campus
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
|
|
4.30 miles
|
Stack: NVA02E
|
NVA02E is a 259,200 sq ft data center building on STACK Infrastructure's NVA02 campus at 9570 Hornbaker Road in Manassas, Virginia.
|
|
4.33 miles
|
Stack: NVA02A
|
NVA02A is a 226,862 sq ft data center building on STACK Infrastructure's NVA02 campus at 9750 Hornbaker Road in Manassas, Virginia.
|
|
4.33 miles
|
ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.35 miles
|
Stack: NVA02F
|
NVA02F is a data center building under construction on STACK Infrastructure's NVA02 campus at 9640 Hornbaker Road in Manassas, Virginia.
|
|
4.35 miles
|
Digital Realty: IAD53
|
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
|
|
4.35 miles
|
MaxInterested in this information?Contact us
|
|
|
4.45 miles
|
CoreInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.47 miles
|
Stack: NVA02H
|
NVA02H is a 256,212 sq ft, two-story data center building under construction on STACK Infrastructure's NVA02 campus at 10167 Linton Hall Road in Prince William County, Virginia.
|
|
4.47 miles
|
Global ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.49 miles
|
Yondr: Bristow Bldg 2
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
|
|
4.50 miles
|
Digital Realty: IAD50
|
|
|
4.54 miles
|
Cloud CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.54 miles
|
Stack: NVA02I
|
NVA02I is a 256,280 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10161 Linton Hall Road in Prince William County, Virginia.
|
|
4.58 miles
|
Central PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.59 miles
|
Digital Realty: IAD51
|
|
|
4.66 miles
|
Stack: NVA02J
|
NVA02J is a 201,000 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10155 Linton Hall Road in Prince William County, Virginia.
|
|
4.66 miles
|
Station MaxInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.67 miles
|
Edge ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.71 miles
|
Tower UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.75 miles
|
Stack: Bristow 2 (NVA02L)
|
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
|
|
4.77 miles
|
Cloud HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.78 miles
|
CloudHQ: MDC3
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
4.78 miles
|
AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.88 miles
|
CloudHQ: MDC2
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
4.94 miles
|
JK Land: Hunter Trust
|
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
|
|
4.94 miles
|
Stack: Bristow 1 (NVA02K)
|
Bristow 1 (NVA02K) is the first of two three-story data centers STACK Infrastructure proposed on a 58-acre site in Bristow, Virginia. Prince William County supervisors rejected the project in September 2025.
|
|
4.96 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
|
5.00 miles
|
CloudHQ: MDC1
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
5.35 miles
|
NTT: VA10
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
5.42 miles
|
NTT: VA11
|
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
5.48 miles
|
Parkstone Tech Park
|
|
|
5.49 miles
|
NTT: VA12
|
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
5.58 miles
|
CloudHQ MCC2
|
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
|
|
5.59 miles
|
CloudHQ: MCC7
|
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
|
|
5.61 miles
|
NTT: VA13
|
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
5.64 miles
|
John Marshall Commons Tech Park
|
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
|
|
5.88 miles
|
CloudHQ: MCC5
|
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
|
|
5.88 miles
|
BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.89 miles
|
Gardner Property Project
|
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
|
|
5.90 miles
|
CloudHQ: MCC4
|
CloudHQ has announced plans for MCC4, a new facility to be located at 10849 Airman Avenue in the Northern Virginia market. The data center will span 225,585 sqft of space.
|
|
5.90 miles
|
Station OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.93 miles
|
Prime PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.99 miles
|
GlobalInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.99 miles
|
CloudHQ: MCC1
|
CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
|
|
6.11 miles
|
CloudHQ: MCC6Z
|
MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
|
|
6.16 miles
|
CloudHQ: MCC6A
|
MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
|
|
6.21 miles
|
CloudHQ MCC3
|
CloudHQ MCC3 is a part of The MCC data center campus.
|
|
6.58 miles
|
Dulles South Innovation Center
|
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
|
|
6.71 miles
|
Data Center Edge District
|
The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
|
|
7.20 miles
|
TwoInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.22 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.35 miles
|
Central HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.44 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.44 miles
|
WestInterested in this information?Contact us
|
|
|
7.47 miles
|
Penzance: Chantilly Premier
|
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
|
7.64 miles
|
West RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.66 miles
|
AlphaInterested in this information?Contact us
|
|
|
7.66 miles
|
Central CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
7.66 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
|
7.67 miles
|
Prime PlazaInterested in this information?Contact us
|
|
|
7.70 miles
|
Central RidgeInterested in this information?Contact us
|
|
|
7.75 miles
|
GammaInterested in this information?Contact us
|
|
|
7.80 miles
|
Edge TowerInterested in this information?Contact us
|
|
|
7.82 miles
|
EastInterested in this information?Contact us
|
|
|
7.86 miles
|
Edge CampusInterested in this information?Contact us
|
|
|
7.89 miles
|
Tower GammaInterested in this information?Contact us
|
|
|
7.90 miles
|
Tower PlusInterested in this information?Contact us
|
|
|
7.94 miles
|
ParkInterested in this information?Contact us
|
|
|
7.95 miles
|
West RidgeInterested in this information?Contact us
|
|
|
7.97 miles
|
Station BetaInterested in this information?Contact us
|
|
|
8.04 miles
|
Starwood: Stonecroft Blvd, Chantilly
|
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
|
|
8.05 miles
|
Metro PlazaInterested in this information?Contact us
|
|
|
8.24 miles
|
EastInterested in this information?Contact us
|
|
|
8.27 miles
|
North CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.28 miles
|
Station UltraInterested in this information?Contact us
|
|
|
8.32 miles
|
Tower PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.33 miles
|
Prime StationInterested in this information?Contact us
|
|
|
8.41 miles
|
Valley PlusInterested in this information?Contact us
|
|
|
9.32 miles
|
West ValleyInterested in this information?Contact us
|
|
|
9.37 miles
|
CyrusOne: Vint Hill
|
CyrusOne LLC, a data center developer and operator, submitted its first site plan to the county in March for an 870,000-square-foot data center campus.
|
|
9.41 miles
|
Tower BetaInterested in this information?Contact us
|
|
|
9.41 miles
|
BetaInterested in this information?Contact us
|
|
|
9.51 miles
|
South ParkInterested in this information?Contact us
|
|
|
9.58 miles
|
PrimeInterested in this information?Contact us
|
|
|
9.62 miles
|
OVH: Vint Hill Bldg 1
|
This facility, situated on the grounds of a former Army base in Vint Hill, became OVHcloud's first U.S. data center and officially began operations in 2017.
|
|
9.63 miles
|
Cloud PointInterested in this information?Contact us
|
|
|
9.68 miles
|
Tower PrimeInterested in this information?Contact us
|
|
|
9.71 miles
|
OVH: Vint Hill Bldg 2
|
OVHcloud currently plans an expansion of its existing data center, which currently calls the Vint Hill Business Park home.
|
|
9.74 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
9.78 miles
|
PowerHouse: Arcola Bldg A
|
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
9.81 miles
|
PowerHouse: Arcola Bldg B
|
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
9.90 miles
|
South PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.93 miles
|
Cloud RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.02 miles
|
Station PrimeInterested in this information?Contact us
|
|
|
10.03 miles
|
JK Land: Technology Park 3
|
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
|
10.04 miles
|
Cloud ParkInterested in this information?Contact us
|
|
|
10.10 miles
|
Point BetaInterested in this information?Contact us
|
|
|
10.11 miles
|
Central ParkInterested in this information?Contact us
|
|
|
10.13 miles
|
Prime PointInterested in this information?Contact us
|
|
|
10.14 miles
|
Yondr: Arcola Expansion
|
Yondr is planning to expand capacity on an adjacent parcel of land.
|
|
10.15 miles
|
PrimeInterested in this information?Contact us
|
|
|
10.16 miles
|
Park BetaInterested in this information?Contact us
|
|
|
10.17 miles
|
Hub GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.19 miles
|
JK Land: Technology Park 2
|
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
|
10.23 miles
|
EastInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.24 miles
|
Vint Hill Corners
|
The Vint Hill Corners data center campus proposal, submitted by a company called Vint Hill Corners LLC, which owns about 80 acres on Brookside Parkway, seeks to develop two one-story data centers on about 50 acres of property at 4295 Aiken Drive in Vint Hill.
|
|
10.26 miles
|
Hiddenwood Assemblage Campus
|
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
|
10.27 miles
|
Yondr: Arcola Bldg 2
|
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
|
10.29 miles
|
North HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.31 miles
|
Edge RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.33 miles
|
Yondr: Arcola Bldg 1
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
|
10.33 miles
|
Valley ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.36 miles
|
Tower PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.36 miles
|
Central CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.41 miles
|
Central HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.46 miles
|
Tower BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.47 miles
|
North PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.52 miles
|
Center PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.57 miles
|
BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.63 miles
|
Core ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.66 miles
|
JK Land: Technology Park 1
|
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
|
10.69 miles
|
CyrusOne: NVA9 Bldg-1A
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
10.70 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.71 miles
|
CoreInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.73 miles
|
JK Land: Tech Park 1 Expansion
|
|
|
10.76 miles
|
CyrusOne: NVA9 Bldg-2
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
10.76 miles
|
CyrusOne: NVA9 Bldg-1B
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
10.86 miles
|
Stack: Loudoun 2
|
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
10.89 miles
|
Stack: Loudoun 1
|
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
10.90 miles
|
Digital Realty Dulles Expansion
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
|
10.95 miles
|
Digital Realty: IAD44
|
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
|
10.99 miles
|
Prologis: Sterling, VA
|
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
|
11.06 miles
|
Digital Realty: IAD45
|
This facility is part of the Digital Dulles Campus in Sterling, VA.
|
|
11.51 miles
|
Station OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.80 miles
|
Headwaters: Catlett, VA
|
The Headwaters Site Development was a proposed $400 million data center project planned for a 67-acre site in the Catlett Station area of Fauquier County, Virginia.
|
|
11.87 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
12.16 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.21 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.28 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.31 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.55 miles
|
CoreSite: VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
12.67 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
12.69 miles
|
Dulles 2000 Campus
|
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
|
12.80 miles
|
Csquare: Dulles IAD3
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
|
12.87 miles
|
CoreSite: VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
12.87 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
12.95 miles
|
CoreSite: VA2
|
|
|
12.95 miles
|
ThreeInterested in this information?Contact us
|
|
|
12.99 miles
|
Quantico Ridge Data Center
|
The Quantico Ridge data center project was effectively rejected and halted when the developer abruptly withdrew its rezoning application in May 2026.
|
|
13.04 miles
|
Central CenterInterested in this information?Contact us
|
|
|
13.06 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
13.09 miles
|
Equinix Herndon DC97
|
|
|
13.11 miles
|
NorthInterested in this information?Contact us
|
|
|
13.13 miles
|
Core CenterInterested in this information?Contact us
|
|
|
13.18 miles
|
Tower UltraInterested in this information?Contact us
|
|
|
13.18 miles
|
ThreeInterested in this information?Contact us
|
|
|
13.18 miles
|
H5: Herndon
|
|
|
13.18 miles
|
Prologis: Global Plaza Rd
|
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
|
|
13.21 miles
|
Lumen Herndon 3
|
|
|
13.22 miles
|
CentralInterested in this information?Contact us
|
|
|
13.22 miles
|
Lumen Herndon 1
|
|
|
13.26 miles
|
Campus ThreeInterested in this information?Contact us
|
|
|
13.27 miles
|
ValleyInterested in this information?Contact us
|
|
|
13.28 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
|
13.28 miles
|
Valley PlusInterested in this information?Contact us
|
|
|
13.30 miles
|
Point PrimeInterested in this information?Contact us
|
|
|
13.30 miles
|
Center TwoInterested in this information?Contact us
|
|
|
13.31 miles
|
Centersquare: IAD2-B
|
|
|
13.34 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
|
13.35 miles
|
Centersquare: IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
|
13.35 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
|
13.37 miles
|
Core PointInterested in this information?Contact us
|
|
|
13.37 miles
|
WestInterested in this information?Contact us
|
|
|
13.40 miles
|
Prologis: Executive Drive
|
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
|
|
13.43 miles
|
SDC: Import Plaza C
|
Building C is a single-story, 14,160 sq ft support building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, leased to Amazon Web Services as IAD-606.
|
|
13.43 miles
|
Point PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.45 miles
|
PointInterested in this information?Contact us
|
|
|
13.46 miles
|
SDC: Import Plaza D
|
Building D is a planned 20,000 sq ft server storage building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, approved by Loudoun County in June 2026.
|
|
13.46 miles
|
Prime StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.48 miles
|
SDC: Import Plaza A
|
Building A is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2021 and leased to Amazon Web Services as IAD-161.
|
|
13.48 miles
|
Global TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.48 miles
|
SDC: Import Plaza B
|
Building B is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2022 and leased to Amazon Web Services as IAD-162.
|
|
13.49 miles
|
Park PlusInterested in this information?Contact us
|
|
|
13.51 miles
|
SDC: Low Latency Lane 2
|
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
|
|
13.51 miles
|
SDC: Low Latency Lane Expansion
|
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.
|
|
13.52 miles
|
PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.52 miles
|
Valley TwoInterested in this information?Contact us
|
|
|
13.54 miles
|
Station UltraInterested in this information?Contact us
|
|
|
13.56 miles
|
Valley ThreeInterested in this information?Contact us
|
|
|
13.58 miles
|
QTS: ASH2 DC2
|
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
|
|
13.58 miles
|
QTS Ashburn-Shellhorn DC1
|
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
|
|
13.58 miles
|
EastInterested in this information?Contact us
|
|
|
13.59 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
13.60 miles
|
SDC: Low Latency Lane 1
|
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
|
|
13.61 miles
|
PlusInterested in this information?Contact us
|
|
|
13.63 miles
|
QTS: ASH2 DC1
|
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
|
|
13.63 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
|
13.65 miles
|
QTS Ashburn-Shellhorn DC2
|
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
|
|
13.71 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
|
13.71 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
|
|
13.72 miles
|
Digital Realty: IAD55
|
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
|
|
13.73 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
|
13.76 miles
|
NorthInterested in this information?Contact us
|
|
|
13.79 miles
|
Metro ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.79 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
|
13.80 miles
|
Station BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.80 miles
|
Stack: NVA04A
|
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
|
|
13.80 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
|
13.82 miles
|
43881 Devin Shafron (Bldg B)
|
|
|
13.84 miles
|
MaxInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.85 miles
|
43831 Devin Shafron (Bldg C)
|
|
|
13.87 miles
|
WestInterested in this information?Contact us
|
|
|
13.87 miles
|
CentralInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.87 miles
|
43915 Devin Shafron (Bldg A)
|
|
|
13.88 miles
|
Campus UltraInterested in this information?Contact us
|
|
|
13.88 miles
|
43791 Devin Shafron (Bldg D)
|
|
|
13.89 miles
|
ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.89 miles
|
Stack: NVA04B
|
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
|
|
13.90 miles
|
CloudHQ: LC4
|
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
|
|
13.90 miles
|
CloudHQ: LC8
|
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
|
|
13.94 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
13.96 miles
|
BetaInterested in this information?Contact us
|
|
|
13.96 miles
|
Deft: DRT-IAD1
|
|
|
13.96 miles
|
43830 Devin Shafron (Bldg F)
|
|
|
13.97 miles
|
Stack: NVA04C
|
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
|
|
13.97 miles
|
Edge PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.00 miles
|
Connect Data Centers: Sterling, VA
|
|
|
14.00 miles
|
43790 Devin Shafron (Bldg E)
|
|
|
14.01 miles
|
CloudHQ: LC10
|
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
14.01 miles
|
Vantage VA16
|
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
|
|
14.01 miles
|
CloudHQ: LC9
|
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
14.02 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
14.02 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
|
14.04 miles
|
Menlo: MD-DC2 (Sterling)
|
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
|
|
14.05 miles
|
Active Infra: Spring Valley 1
|
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
|
|
14.05 miles
|
Vantage VA15
|
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
|
|
14.07 miles
|
Digital Realty: IAD43
|
|
|
14.08 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
14.08 miles
|
CloudHQ: LC12
|
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
14.09 miles
|
CloudHQ: LC13
|
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
14.10 miles
|
Vantage: VA23
|
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
14.11 miles
|
Vantage: VA21
|
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
|
|
14.17 miles
|
Vantage: VA22
|
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
14.17 miles
|
Sentinel: Cloud Plaza, Sterling, VA
|
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
|
|
14.17 miles
|
CloudHQ: LC14
|
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
14.19 miles
|
CloudHQ: LC11
|
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
14.22 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
|
14.24 miles
|
PowerHouse: Pacific Bldg C
|
PowerHouse Pacific Building C is a three-story, 352,000 sq ft hyperscale data center shell under construction at 22279 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
|
|
14.26 miles
|
Vantage VA12
|
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
|
|
14.28 miles
|
PowerHouse: Pacific Bldg B
|
PowerHouse Pacific Building B is a three-story, 354,000 sq ft hyperscale data center shell under construction at 22214 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
|
|
14.31 miles
|
44372 Round Table: Digital Realty
|
|
|
14.31 miles
|
Vantage VA11
|
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
|
|
14.32 miles
|
Digital Realty: Broderick Drive
|
|
|
14.33 miles
|
Vantage VA14
|
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
|
|
14.33 miles
|
Vantage VA13
|
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
|
|
14.35 miles
|
44274 Round Table (Bldg L)
|
|
|
14.39 miles
|
CloudHQ: LC5
|
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
|
|
14.39 miles
|
PowerHouse: Pacific Bldg A
|
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.
|
|
14.42 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
|
14.45 miles
|
Aligned: IAD-02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
|
14.47 miles
|
44751 Round Table (Bldg P)
|
|
|
14.48 miles
|
Regency DC Campus Ashburn
|
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
|
|
14.53 miles
|
CloudHQ: LC1B
|
|
|
14.54 miles
|
Quantum Connect: Ashburn, VA
|
A data center is under construction at the Quantum business park in Ashburn, Virginia.
|
|
14.54 miles
|
CloudHQ: LC1A
|
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
|
|
14.59 miles
|
Equinix DC13
|
|
|
14.62 miles
|
CloudHQ: LC3
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
14.63 miles
|
Dulles 28 Technology Park
|
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
|
|
14.67 miles
|
Aligned: IAD-01
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
|
14.67 miles
|
CloudHQ LC2
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
14.67 miles
|
Sabey Intergate: Ashburn Bldg-A
|
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
|
|
14.69 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
|
14.69 miles
|
Sabey Intergate: Ashburn Bldg-B
|
|
|
14.74 miles
|
Equinix DC21
|
|
|
14.75 miles
|
DataCanopy: Ashburn 1
|
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
|
|
14.76 miles
|
DataBank Ashburn IAD1
|
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
|
|
14.77 miles
|
DataBank Ashburn IAD4
|
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
|
|
14.77 miles
|
Sabey Intergate: Ashburn Bldg-C
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
|
14.77 miles
|
Active Infra: Spring Valley Expansion
|
|
|
14.78 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
|
14.78 miles
|
FastServ Ashburn
|
|
|
14.84 miles
|
NTT: VA7
|
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
|
|
14.85 miles
|
Digital Realty: IAD-56
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
|
14.87 miles
|
Equinix: DC22
|
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
|
|
14.88 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
|
14.90 miles
|
Equinix Ashburn DC11
|
|
|
14.90 miles
|
Equinix Ashburn DC6
|
|
|
14.90 miles
|
NTT: VA6
|
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
|
|
14.90 miles
|
Lightedge: Ashburn
|
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
|
|
14.92 miles
|
DataBank Ashburn IAD3
|
|
|
14.94 miles
|
Equinix Ashburn DC5
|
|
|
14.94 miles
|
NTT: VA9
|
|
|
14.94 miles
|
Equinix Ashburn DC1
|
|
|
14.96 miles
|
Cologix: Ashburn Expansion (Beaumeade Circle)
|
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
|
|
14.97 miles
|
Equinix Ashburn DC4
|
|
|
14.97 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
|
14.99 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
|
15.00 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
|
15.01 miles
|
Global TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.01 miles
|
NTT VA5
|
|
|
15.02 miles
|
AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.06 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
15.09 miles
|
Cologix: ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
|
15.10 miles
|
AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.11 miles
|
NTT: VA8
|
|
|
15.13 miles
|
Dulles 28 Centre Motorplex
|
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
|
|
15.15 miles
|
NTT VA4
|
|
|
15.17 miles
|
Paragon Park Lot 3B
|
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
|
|
15.19 miles
|
21710 Charles View
|
|
|
15.19 miles
|
CampusInterested in this information?Contact us
|
|
|
15.19 miles
|
Cologix: ASH2
|
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
|
|
15.20 miles
|
44521 Hastings (ACC5) Digital Realty
|
|
|
15.22 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
|
15.26 miles
|
PowerHouse ABX1
|
|
|
15.27 miles
|
Rackspace Ashburn IAD3
|
|
|
15.27 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
15.29 miles
|
44490 Chilum (ACC2): Digital Realty
|
|
|
15.30 miles
|
Cyrusone: Beaumeade Circle
|
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
|
|
15.34 miles
|
44470 Chillum - Digital Realty
|
|
|
15.35 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
|
15.37 miles
|
Park AlphaInterested in this information?Contact us
|
|
|
15.37 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
|
15.38 miles
|
21641 Charles View
|
|
|
15.40 miles
|
Lumen Ashburn
|
|
|
15.42 miles
|
Digital Realty: 21561 Beaumeade Cir
|
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
|
|
15.42 miles
|
Centersquare: Ashburn WDC1
|
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
|
|
15.45 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
|
15.46 miles
|
DataCanopy: Ashburn 2
|
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
|
|
15.48 miles
|
Ridge BetaInterested in this information?Contact us
|
|
|
15.50 miles
|
Equinix DC15
|
|
|
15.54 miles
|
Tower AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.55 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
|
15.58 miles
|
NTT VA2
|
|
|
15.59 miles
|
Equinix DC16
|
|
|
15.61 miles
|
PointOne: IAD2
|
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
|
|
15.62 miles
|
Equinix: DC17
|
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
|
|
15.63 miles
|
South StationInterested in this information?Contact us
|
|
|
15.65 miles
|
Equinix: DC18
|
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
|
|
15.69 miles
|
Prime CampusInterested in this information?Contact us
|
|
|
15.75 miles
|
Valley TwoInterested in this information?Contact us
|
|
|
15.75 miles
|
South TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.75 miles
|
Prime StationInterested in this information?Contact us
|
|
|
15.78 miles
|
BetaInterested in this information?Contact us
|
|
|
15.79 miles
|
South TowerInterested in this information?Contact us
|
|
|
15.80 miles
|
DataCanopy: Sterling, VA
|
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
|
|
15.83 miles
|
CyrusOne: NVA5
|
|
|
15.85 miles
|
Hub BetaInterested in this information?Contact us
|
|
|
15.87 miles
|
CyrusOne: Broadlands Expansion
|
|
|
15.89 miles
|
Central CenterInterested in this information?Contact us
|
|
|
15.91 miles
|
CyrusOne: Broadlands Boulevard 1
|
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
|
|
15.91 miles
|
Washington Commanders: Ashburn, VA
|
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
|
|
15.94 miles
|
CyrusOne Sterling VIII
|
|
|
15.96 miles
|
CyrusOne: NVA7
|
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
|
|
15.97 miles
|
EdgeCore Ashburn
|
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
|
16.00 miles
|
West HubInterested in this information?Contact us
|
|
|
16.01 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.02 miles
|
Global CenterInterested in this information?Contact us
|
|
|
16.02 miles
|
COPT: 45761 Maries Rd
|
|
|
16.03 miles
|
COPT: 45771 Maries Rd
|
|
|
16.06 miles
|
RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.08 miles
|
Centersquare: Sterling DC2
|
|
|
16.09 miles
|
TA Realty: Sterling, Virginia
|
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
|
|
16.09 miles
|
Centersquare: Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
|
16.13 miles
|
PointOne: Ashburn
|
The campus will have 2 buildings
|
|
16.18 miles
|
Point GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.19 miles
|
Centersquare: Sterling DC4
|
|
|
16.19 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
|
16.22 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
|
16.23 miles
|
West StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.23 miles
|
EastInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.25 miles
|
Kyndryl: Sterling
|
|
|
16.25 miles
|
OneInterested in this information?Contact us
|
|
|
16.29 miles
|
Maple Tree Farm
|
A 145-acre property known as Maple Tree Farm, located just east of Warrenton, is being marketed as a potential data center location.
|
|
16.31 miles
|
Central RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.32 miles
|
Hub MaxInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.38 miles
|
WestInterested in this information?Contact us
|
|
|
16.42 miles
|
Cloud PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.46 miles
|
East CenterInterested in this information?Contact us
|
|
|
16.56 miles
|
Farkas Family: Leesburg, VA
|
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
|
|
16.67 miles
|
Compass Loudoun County
|
|
|
16.75 miles
|
Corscale: Kincora
|
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
|
|
17.04 miles
|
Cogent Vienna
|
|
|
17.09 miles
|
Equinix Vienna DC8
|
|
|
17.13 miles
|
8100 Boone - Digital Realty
|
|
|
17.24 miles
|
Equinix Vienna DC7
|
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC7 in Q2 2026.
|
|
17.27 miles
|
Element Critical VA1
|
|
|
17.28 miles
|
Metro StationInterested in this information?Contact us
|
|
|
17.37 miles
|
Luck Stone: Ashburn Expansion
|
|
|
17.40 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.43 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
|
17.43 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.50 miles
|
Luck Stone: Ashburn 1
|
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
|
|
17.51 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.57 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.59 miles
|
JK Land: Greenlin Park 1
|
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
|
|
17.69 miles
|
Tower TwoInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.73 miles
|
JK Land: Greenlin Expansion
|
|
|
17.92 miles
|
DataBank McLean IAD2
|
In 2020, DataBank acquired the site from zColo.
|
|
17.98 miles
|
ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.99 miles
|
Lumen McLean 1
|
|
|
18.14 miles
|
JK Land: Cross Mill Center
|
A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved.
|
|
18.27 miles
|
JK Land: Ashburn
|
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
|
|
18.30 miles
|
Core StationInterested in this information?Contact us
|
|
|
18.34 miles
|
CentralInterested in this information?Contact us
|
|
|
18.59 miles
|
CoreInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.61 miles
|
StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.65 miles
|
CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.66 miles
|
SDC Capital: Twin Creeks
|
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
|
|
18.66 miles
|
Belmont Innovation Campus
|
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
|
|
18.84 miles
|
JK Land: Freedom Trail Rd
|
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
|
|
18.95 miles
|
Vantage: VA32
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
18.98 miles
|
Plaza AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.99 miles
|
Tuscarora Crossing Campus
|
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
|
|
19.01 miles
|
Tower AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.02 miles
|
Vantage: VA33
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
19.09 miles
|
Vantage: VA35
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
19.11 miles
|
Vantage: VA31
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
|
19.14 miles
|
Vantage: VA34
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
19.20 miles
|
Vantage: VA37
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
19.27 miles
|
Vantage: VA36
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
19.32 miles
|
Stack: NVA06B
|
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
|
19.49 miles
|
Stack: NVA06A
|
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
|
19.62 miles
|
Springfield East: Leesburg, VA
|
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
|
|
19.78 miles
|
Starwood: Alexandria, VA
|
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
|