QTS Ashburn (Carpathia)

Latest Podcast 43480 Yukon Dr
Operational
Fully operational facility
Operated by:

QTS Ashburn (Carpathia)

Year Built: 2007
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

QTS acquired this site via the Carpathia acquisition in 2015.

Power:


  • 2N on MGE UPS Power
  • 4kW Cabinets and 6kW cabinets available
  • UPS supportable loads (N+1); block redundant system with (5+1) electrical bus
  • 6 power transformers Utility voltage = 34.5 kV
  • Standby power configuration: N+1 block redundant
  • N+1 on Cummins generators and Trane Chiller System
  • Three generators. One primary generator and one primary utility per 1125 kW

Cooling:


  • Cooling plant – split system, direct expansion, air cooled
  • Hydronic chilled water closed look system feeding multiple central air handling units
  • Five 650 ton water-cooled Carrier chilled water units
  • Five primary chilled water pumps and three secondary chilled water pumps, both having one redundant pump
  • 21 Rascan air handling units supply conditioned air

Building:


4,040 SqFt of Office space

Map and Nearby Locations

43480 Yukon Dr
QTS Data Centers Sites
Nearby Facilities

QTS Ashburn (Carpathia) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of QTS Ashburn (Carpathia)

Distance Site About
0.46 miles 43790 Devin Shafron (Bldg E)
0.47 miles BetaInterested in this information?Contact us
0.48 miles 43791 Devin Shafron (Bldg D)
0.49 miles Regency DC Campus Ashburn
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
0.54 miles Deft: DRT-IAD1
0.54 miles 43830 Devin Shafron (Bldg F)
0.57 miles 43831 Devin Shafron (Bldg C)
0.68 miles 43881 Devin Shafron (Bldg B)
0.71 miles 43915 Devin Shafron (Bldg A)
0.73 miles DataBank Ashburn IAD4
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
0.76 miles CloudHQ: LC12
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
0.77 miles CloudHQ: LC11
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
0.77 miles DataCanopy: Ashburn 1
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
0.78 miles DataBank Ashburn IAD1
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
0.80 miles FastServ Ashburn
0.81 miles Sabey Intergate: Ashburn Bldg-B
0.84 miles CloudHQ: LC14
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
0.84 miles CloudHQ: LC13
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
0.86 miles 43940 Digital Loudoun Plaza (Bldg G)
0.86 miles CloudHQ: LC5
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
0.88 miles 43780 Digital Loudoun Plaza (Bldg H)
0.89 miles DataBank Ashburn IAD3
0.91 miles PrimeInterested in this information?Contact us
0.92 miles Sabey Intergate: Ashburn Bldg-C
Intergate.Ashburn is a purpose-built data center campus on 38 acres
0.92 miles Sabey Intergate: Ashburn Bldg-A
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
0.96 miles Aligned: IAD-02
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
0.98 miles 44100 Digital Loudoun Plaza (Bldg J)
0.99 miles Equinix DC13
0.99 miles 44060 Digital Loudoun Plaza (Bldg K)
1.14 miles CloudHQ: LC10
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
1.15 miles NTT: VA9
1.16 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.18 miles Quantum Connect: Ashburn, VA
A data center is under construction at the Quantum business park in Ashburn, Virginia.
1.19 miles CloudHQ: LC4
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
1.19 miles QTS Ashburn-Shellhorn DC1
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
1.20 miles NTT: VA6
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
1.20 miles Aligned: IAD-01
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
1.23 miles QTS Ashburn-Shellhorn DC2
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
1.23 miles NTT: VA8
1.24 miles NTT: VA7
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
1.27 miles NTT VA5
1.27 miles 44372 Round Table: Digital Realty
1.29 miles CloudHQ: LC9
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
1.32 miles SDC: Import Plaza A
Building A is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2021 and leased to Amazon Web Services as IAD-161.
1.34 miles Core PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.36 miles 44274 Round Table (Bldg L)
1.37 miles NTT VA4
1.38 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
1.42 miles CloudHQ: LC8
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
1.45 miles SDC: Import Plaza B
Building B is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2022 and leased to Amazon Web Services as IAD-162.
1.45 miles Point PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.48 miles 21745 Sir Timothy (ACC9) Digital Realty
1.50 miles Plaza BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.50 miles SDC: Import Plaza C
Building C is a single-story, 14,160 sq ft support building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, leased to Amazon Web Services as IAD-606.
1.51 miles 21744 Sir Timothy Drive (ACC10)
1.52 miles SDC: Import Plaza D
Building D is a planned 20,000 sq ft server storage building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, approved by Loudoun County in June 2026.
1.52 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.58 miles CloudHQ: LC1A
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
1.59 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
1.67 miles CloudHQ LC2
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
1.67 miles CloudHQ: LC1B
1.75 miles CloudHQ: LC3
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
1.75 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
1.75 miles Equinix Ashburn DC4
1.77 miles Equinix Ashburn DC5
1.78 miles 44521 Hastings (ACC5) Digital Realty
1.79 miles Prime CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.79 miles Stack: NVA04C
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
1.80 miles Rackspace Ashburn IAD3
1.80 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
1.82 miles Hub AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.82 miles Stack: NVA04B
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
1.82 miles 44751 Round Table (Bldg P)
1.84 miles South TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.84 miles Stack: NVA04A
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
1.84 miles Equinix Ashburn DC1
1.85 miles Lightedge: Ashburn
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
1.89 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
1.89 miles Cologix: ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
1.89 miles Equinix Ashburn DC11
1.89 miles Equinix Ashburn DC6
1.90 miles SDC: Low Latency Lane 2
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
1.90 miles Hyperscale Data CenterInterested in this information?Contact us
1.93 miles Hyperscale Data CenterInterested in this information?Contact us
1.94 miles 44470 Chillum - Digital Realty
1.94 miles 44520 Hastings (ACC3) Digital Realty
1.95 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
1.97 miles 44490 Chilum (ACC2): Digital Realty
1.98 miles SDC: Low Latency Lane 1
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
1.99 miles Digital Realty: IAD-56
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
2.01 miles Hyperscale Data CenterInterested in this information?Contact us
2.02 miles Cologix: ASH2
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
2.03 miles SDC: Low Latency Lane Expansion
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.
2.03 miles Cologix: Ashburn Expansion (Beaumeade Circle)
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
2.06 miles Hyperscale Data CenterInterested in this information?Contact us
2.09 miles Equinix DC21
2.12 miles Lumen Ashburn
2.13 miles Equinix: DC22
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
2.15 miles QTS: ASH2 DC2
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
2.19 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.21 miles QTS: ASH2 DC1
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
2.21 miles Digital Realty: IAD43
2.21 miles NTT VA2
2.24 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
2.25 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
2.27 miles DataCanopy: Ashburn 2
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
2.27 miles Hub ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.31 miles Digital Realty: Broderick Drive
2.32 miles Centersquare: Ashburn WDC1
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
2.32 miles Park ThreeInterested in this information?Contact us
2.33 miles OneInterested in this information?Contact us
2.34 miles CyrusOne: Broadlands Boulevard 1
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
2.34 miles Station ProInterested in this information?Contact us
2.34 miles Digital Realty: 21561 Beaumeade Cir
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
2.38 miles PowerHouse ABX1
2.39 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
2.40 miles CyrusOne: Broadlands Expansion
2.40 miles Equinix: DC17
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
2.41 miles Cyrusone: Beaumeade Circle
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
2.41 miles PowerHouse: Pacific Bldg C
PowerHouse Pacific Building C is a three-story, 352,000 sq ft hyperscale data center shell under construction at 22279 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
2.43 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
2.43 miles Equinix: DC18
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
2.43 miles Equinix DC16
2.46 miles Central PlazaInterested in this information?Contact us
2.49 miles Equinix DC15
2.50 miles PowerHouse: Pacific Bldg B
PowerHouse Pacific Building B is a three-story, 354,000 sq ft hyperscale data center shell under construction at 22214 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
2.50 miles MetroInterested in this information?Contact us
2.52 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
2.52 miles PowerHouse: Pacific Bldg A
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.
2.58 miles Tower OneInterested in this information?Contact us
2.61 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
2.64 miles Dulles 28 Technology Park
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
2.65 miles PlusInterested in this information?Contact us
2.65 miles Menlo: MD-DC2 (Sterling)
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
2.65 miles CoreInterested in this information?Contact us
2.67 miles EdgeCore: Ashburn AS02
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
2.67 miles CentralInterested in this information?Contact us
2.69 miles Valley PlusInterested in this information?Contact us
2.71 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
2.75 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
2.75 miles Dulles 28 Centre Motorplex
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
2.78 miles Plaza MaxInterested in this information?Contact us
2.82 miles Vantage VA15
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
2.85 miles Vantage VA13
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
2.86 miles Vantage VA16
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
2.90 miles 21710 Charles View
2.90 miles TwoInterested in this information?Contact us
2.90 miles Vantage VA14
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
2.91 miles Sentinel: Cloud Plaza, Sterling, VA
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
2.93 miles Washington Commanders: Ashburn, VA
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
2.94 miles Tower ThreeInterested in this information?Contact us
2.96 miles Vantage VA12
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
2.96 miles 21641 Charles View
2.97 miles Prologis: Executive Drive
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
2.98 miles South StationInterested in this information?Contact us
2.99 miles Core CampusInterested in this information?Contact us
2.99 miles Vantage VA11
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
3.01 miles Tower GammaInterested in this information?Contact us
3.01 miles GlobalInterested in this information?Contact us
3.08 miles Cloud RidgeInterested in this information?Contact us
3.11 miles Paragon Park Lot 3B
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
3.12 miles Aligned IAD03
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
3.14 miles PointInterested in this information?Contact us
3.17 miles Prime PointInterested in this information?Contact us
3.19 miles Digital Realty: IAD45
This facility is part of the Digital Dulles Campus in Sterling, VA.
3.22 miles Csquare: Dulles IAD3
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
3.23 miles North CampusInterested in this information?Contact us
3.23 miles Campus TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.23 miles Prologis: Sterling, VA
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
3.24 miles Center UltraInterested in this information?Contact us
3.25 miles Tower ProInterested in this information?Contact us
3.25 miles South PlazaInterested in this information?Contact us
3.25 miles ProInterested in this information?Contact us
3.28 miles Digital Realty: IAD44
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
3.28 miles DataCanopy: Sterling, VA
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
3.31 miles Prologis: Global Plaza Rd
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
3.34 miles CyrusOne: NVA5
3.35 miles Digital Realty: IAD55
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
3.35 miles South RidgeInterested in this information?Contact us
3.36 miles Digital Realty Dulles Expansion
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
3.38 miles PrimeInterested in this information?Contact us
3.39 miles CyrusOne: NVA7
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
3.41 miles Compass Loudoun County
3.43 miles Vantage: VA22
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
3.44 miles Vantage: VA21
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
3.44 miles NorthInterested in this information?Contact us
3.47 miles CyrusOne: NVA9 Bldg-2
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
3.50 miles CyrusOne: NVA9 Bldg-1B
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
3.50 miles Vantage: VA23
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
3.51 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.55 miles PointOne: IAD2
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
3.56 miles CyrusOne: NVA9 Bldg-1A
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
3.58 miles Hub OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.64 miles Edge ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.75 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.77 miles East TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.78 miles Corscale: Kincora
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
3.78 miles Global ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.79 miles Stack: Loudoun 2
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
3.83 miles Luck Stone: Ashburn Expansion
3.85 miles Visa Eastern US Ashburn
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
3.89 miles Luck Stone: Ashburn 1
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
3.90 miles PointOne: Ashburn
The campus will have 2 buildings
3.90 miles TA Realty: Sterling, Virginia
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
3.91 miles Stack: Loudoun 1
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
3.97 miles CyrusOne Northern Virginia Sterling IV
3.99 miles Cloud ParkInterested in this information?Contact us
3.99 miles Global RidgeInterested in this information?Contact us
4.03 miles Metro StationInterested in this information?Contact us
4.04 miles Centersquare: IAD2-B
4.04 miles COPT: 45771 Maries Rd
4.05 miles Active Infra: Spring Valley 1
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
4.07 miles Centersquare: IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
4.08 miles JK Land: Ashburn
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
4.08 miles Cloud PlazaInterested in this information?Contact us
4.10 miles Plaza PlusInterested in this information?Contact us
4.10 miles Metro PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.10 miles COPT: 45761 Maries Rd
4.12 miles AlphaInterested in this information?Contact us
4.13 miles Farkas Family: Leesburg, VA
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
4.18 miles Hyperscale Data CenterInterested in this information?Contact us
4.21 miles Dulles 2000 Campus
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
4.21 miles Hyperscale Data CenterInterested in this information?Contact us
4.22 miles Connect Data Centers: Sterling, VA
4.23 miles Active Infra: Spring Valley Expansion
4.25 miles Hyperscale Data CenterInterested in this information?Contact us
4.27 miles Hyperscale Data CenterInterested in this information?Contact us
4.30 miles Centersquare: Sterling DC3
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
4.30 miles North PlazaInterested in this information?Contact us
4.33 miles EdgeCore Ashburn
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
4.36 miles CyrusOne Sterling VIII
4.37 miles CyrusOne Northern Virginia Sterling I, II, III
4.39 miles Station AlphaInterested in this information?Contact us
4.39 miles GammaInterested in this information?Contact us
4.39 miles Hyperscale Data CenterInterested in this information?Contact us
4.40 miles Centersquare: Sterling DC2
4.41 miles Edge StationInterested in this information?Contact us
4.42 miles Hub MaxInterested in this information?Contact us
4.43 miles Peterson: Silverbrook
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
4.46 miles 21110 Ridgetop
The site is fully leased to triple net tenants.
4.46 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.46 miles Metro HubInterested in this information?Contact us
4.47 miles Hub MaxInterested in this information?Contact us
4.48 miles Centersquare: Sterling DC4
4.49 miles Global StationInterested in this information?Contact us
4.52 miles Point UltraInterested in this information?Contact us
4.52 miles Global StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.55 miles JK Land: Greenlin Park 1
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
4.55 miles Metro TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.57 miles Belmont Innovation Campus
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
4.57 miles Edge RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.60 miles Campus MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.60 miles JK Land: Tech Park 1 Expansion
4.62 miles Tower OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.64 miles Station PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.67 miles Hub OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.67 miles JK Land: Freedom Trail Rd
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
4.70 miles JK Land: Technology Park 1
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
4.70 miles Tower TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.70 miles JK Land: Greenlin Expansion
4.74 miles SDC Capital: Twin Creeks
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
4.81 miles Vantage: VA32
This facility is a part of Vantage's VA3 data center campus in Ashburn.
4.83 miles Global CenterInterested in this information?Contact us
4.90 miles Vantage: VA33
This facility is a part of Vantage's VA3 data center campus in Ashburn.
4.91 miles Hiddenwood Assemblage Campus
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
4.94 miles JK Land: Cross Mill Center
A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved.
4.95 miles Vantage: VA35
This facility is a part of Vantage's VA3 data center campus in Ashburn.
4.95 miles JK Land: Technology Park 2
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
4.97 miles Metro ParkInterested in this information?Contact us
4.98 miles Vantage: VA31
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
4.99 miles JK Land: Technology Park 3
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
4.99 miles Vantage: VA34
This facility is a part of Vantage's VA3 data center campus in Ashburn.
5.01 miles PowerHouse: Arcola Bldg B
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
5.07 miles PowerHouse: Arcola Bldg A
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
5.07 miles Kyndryl: Sterling
5.08 miles Yondr: Arcola Bldg 1
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
5.08 miles Vantage: VA37
This facility is a part of Vantage's VA3 data center campus in Ashburn.
5.12 miles Point OneInterested in this information?Contact us
5.14 miles Vantage: VA36
This facility is a part of Vantage's VA3 data center campus in Ashburn.
5.15 miles Yondr: Arcola Expansion
Yondr is planning to expand capacity on an adjacent parcel of land.
5.16 miles Yondr: Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
5.19 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.20 miles MetroInterested in this information?Contact us
5.22 miles Station MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.25 miles Tuscarora Crossing Campus
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
5.32 miles Center ProInterested in this information?Contact us
5.35 miles Edge CampusInterested in this information?Contact us
5.36 miles Point GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.38 miles Campus OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.43 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.44 miles Valley BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.48 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.49 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.53 miles West HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.54 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.58 miles West ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.61 miles Springfield East: Leesburg, VA
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
5.93 miles Center ThreeInterested in this information?Contact us
5.96 miles TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.96 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.00 miles Campus TwoInterested in this information?Contact us
6.04 miles Campus MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.08 miles Prime ValleyInterested in this information?Contact us
6.08 miles Tower ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.09 miles ValleyInterested in this information?Contact us
6.18 miles Point GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.20 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.20 miles Core StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.23 miles ParkInterested in this information?Contact us
6.26 miles Station OneInterested in this information?Contact us
6.26 miles Stack: NVA06B
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
6.28 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.30 miles Station PrimeInterested in this information?Contact us
6.32 miles TowerInterested in this information?Contact us
6.33 miles Prime CampusInterested in this information?Contact us
6.37 miles West PlazaInterested in this information?Contact us
6.40 miles Edge ParkInterested in this information?Contact us
6.40 miles Stack: NVA06A
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
6.43 miles RidgeInterested in this information?Contact us
6.44 miles Station PrimeInterested in this information?Contact us
6.46 miles PlusInterested in this information?Contact us
6.49 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
6.53 miles Station AlphaInterested in this information?Contact us
6.66 miles Lumen Herndon 1
6.67 miles South HubInterested in this information?Contact us
6.67 miles Lumen Herndon 3
6.73 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
6.83 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
6.86 miles Center PrimeInterested in this information?Contact us
6.90 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
6.93 miles Park PrimeInterested in this information?Contact us
6.93 miles Hub GammaInterested in this information?Contact us
6.96 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
6.99 miles H5: Herndon
6.99 miles Equinix Herndon DC97
7.01 miles Plaza TwoInterested in this information?Contact us
7.02 miles Starwood: Stonecroft Blvd, Chantilly
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
7.07 miles Peterson: Leesburg Gateway Campus
Peterson Companies, through its affiliate Leesburg Gateway, LLC, is proposing a significant data center and industrial development on a 100-acre site in Leesburg, Virginia.
7.30 miles SouthInterested in this information?Contact us
7.32 miles Penzance: Chantilly Premier
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
7.35 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.45 miles Campus ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.51 miles North PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.71 miles CoreSite: VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
7.82 miles Central StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.90 miles Park MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.93 miles East CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.95 miles CoreSite: VA2
7.97 miles CoreSite: VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
7.97 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
9.45 miles Parkstone Tech Park
9.53 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
9.71 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
9.82 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
9.83 miles Dulles South Innovation Center
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
11.80 miles QTS: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
13.19 miles Compass: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
14.11 miles Verizon: 7777 Infantry Ridge
Former AOL data center
14.22 miles Equinix Manassas DC14
14.27 miles Atmosphere: Dickerson, Maryland
14.62 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
14.63 miles Equinix Vienna DC8
14.64 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.67 miles Global HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.81 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.94 miles North TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.95 miles CorScale: Gainesville 5
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
15.03 miles Corscale: Gainesville 1
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
15.04 miles CorScale: Gainesville 4
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
15.14 miles Central CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.20 miles CorScale: Gainesville 2
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
15.21 miles Metro CampusInterested in this information?Contact us
15.21 miles CorScale: Gainesville 3
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
15.25 miles Global RidgeInterested in this information?Contact us
15.28 miles Plaza ThreeInterested in this information?Contact us
15.29 miles East ParkInterested in this information?Contact us
15.31 miles TowerInterested in this information?Contact us
15.40 miles Tower TwoInterested in this information?Contact us
15.56 miles East PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.56 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.61 miles John Marshall Commons Tech Park
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
15.61 miles Valley BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.63 miles Prime PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.64 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.64 miles Iron Mountain: Manassas Point
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
15.64 miles StationInterested in this information?Contact us
15.65 miles Cloud HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.66 miles GammaInterested in this information?Contact us
15.68 miles NTT: VA13
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
15.71 miles NTT: VA12
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
15.72 miles NTT: VA11
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
15.72 miles Cogent Vienna
15.73 miles NTT: VA10
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
15.75 miles Hub AlphaInterested in this information?Contact us
15.77 miles 8100 Boone - Digital Realty
15.77 miles Cloud RidgeInterested in this information?Contact us
15.78 miles Tower BetaInterested in this information?Contact us
15.81 miles Core TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.83 miles CampusInterested in this information?Contact us
15.84 miles South RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.85 miles East PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.85 miles Core CenterInterested in this information?Contact us
15.87 miles Edge RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.89 miles Global CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.90 miles Park BetaInterested in this information?Contact us
15.95 miles Point ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.97 miles AlphaInterested in this information?Contact us
15.97 miles Station PlusInterested in this information?Contact us
16.00 miles BlackChamber: Gainesville, VA
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
16.04 miles StationInterested in this information?Contact us
16.05 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.05 miles Park UltraInterested in this information?Contact us
16.07 miles Point AlphaInterested in this information?Contact us
16.08 miles TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.11 miles Gardner Property Project
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
16.14 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.18 miles Equinix Vienna DC7
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC7 in Q2 2026.
16.20 miles Iron Mountain VA-1
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
16.22 miles DataBank McLean IAD2
In 2020, DataBank acquired the site from zColo.
16.23 miles Element Critical VA1
16.23 miles South ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.25 miles Iron Mountain VA-2
16.27 miles Lumen McLean 1
16.31 miles Iron Mountain: VA-7
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
16.32 miles WestInterested in this information?Contact us
16.33 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
16.34 miles Hub GammaInterested in this information?Contact us
16.36 miles Park GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.38 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
16.40 miles North RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.45 miles Opus Interactive Manassas
16.48 miles Iron Mountain: VA-5
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
16.49 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.63 miles Iron Mountain: VA-8
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
16.76 miles Yondr Bristow Campus
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
16.83 miles Iron Mountain: VA-6
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
16.88 miles Stack: NVA05D
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
16.92 miles Yondr: Bristow Bldg 2
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
16.98 miles TPC: Manassas, VA
17.00 miles 8217 Linton Hall (VA4) Digital Realty
17.05 miles West ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.10 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
17.13 miles Station ProInterested in this information?Contact us
17.14 miles Stack: NVA05C
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
17.17 miles Yondr: Manassas
Yondr and Cerberus have acquired land in Manassas for a new hyperscale data center campus targeted for service in 2029.
17.21 miles Cloud CampusInterested in this information?Contact us
17.25 miles West TowerInterested in this information?Contact us
17.31 miles JK Land: Hunter Trust
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
17.34 miles Stack: NVA05A
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
17.38 miles PrimeInterested in this information?Contact us
17.48 miles Park BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.59 miles QTS Manassas 1 DC5
This facility is part of QTS Data Center Campus in Manassas.
17.67 miles QTS: Manassas 1 DC3
This facility is part of QTS Data Center Campus in Manassas.
17.68 miles JK Land: Comcast Center
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
17.71 miles QTS: Manassas 1 DC1
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
17.71 miles QTS: Manassas 1 DC2
This facility is part of QTS Data Center Campus in Manassas.
17.83 miles QTS: Manassas 1 DC4
17.87 miles North ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.88 miles QTS Manassas 1 DC6
This facility is part of QTS Manassas 1 Campus in Virginia.
18.00 miles Black Chamber: Nokesville
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
18.01 miles East ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.03 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.05 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.10 miles North CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.12 miles Metro CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.13 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.16 miles South ValleyInterested in this information?Contact us
18.16 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
18.16 miles VAZATA Northern Virginia (NoVa One)
18.16 miles Evoswitch USA WDC 1
18.16 miles Stack: NVA02G
NVA02G is a 185,803 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 9530 Hornbaker Road in Manassas, Virginia.
18.27 miles Stack: NVA02D
NVA02D is a 281,000 sq ft data center building on STACK Infrastructure's NVA02 campus at 9590 Hornbaker Road in Manassas, Virginia.
18.34 miles Stack: NVA02C
NVA02C, or Building C, is a 14,387 sq ft building on STACK Infrastructure's NVA02 campus at 9730 Hornbaker Road in Manassas, Virginia.
18.38 miles PrimeInterested in this information?Contact us
18.38 miles Stack: NVA02E
NVA02E is a 259,200 sq ft data center building on STACK Infrastructure's NVA02 campus at 9570 Hornbaker Road in Manassas, Virginia.
18.40 miles PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.40 miles Stack: NVA02B
NVA02B is a 224,652 sq ft data center building on STACK Infrastructure's NVA02 campus at 9740 Hornbaker Road in Manassas, Virginia.
18.40 miles Ridge TwoInterested in this information?Contact us
18.43 miles Stack: NVA02F
NVA02F is a data center building under construction on STACK Infrastructure's NVA02 campus at 9640 Hornbaker Road in Manassas, Virginia.
18.47 miles Stack: NVA02A
NVA02A is a 226,862 sq ft data center building on STACK Infrastructure's NVA02 campus at 9750 Hornbaker Road in Manassas, Virginia.
18.47 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.51 miles East TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.51 miles Stack: NVA02H
NVA02H is a 256,212 sq ft, two-story data center building under construction on STACK Infrastructure's NVA02 campus at 10167 Linton Hall Road in Prince William County, Virginia.
18.53 miles Digital Realty: IAD53
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
18.56 miles Stack: NVA02I
NVA02I is a 256,280 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10161 Linton Hall Road in Prince William County, Virginia.
18.56 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.70 miles Digital Realty: IAD50
18.71 miles Stack: NVA02J
NVA02J is a 201,000 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10155 Linton Hall Road in Prince William County, Virginia.
18.71 miles Hub BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.76 miles Plaza ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.78 miles Digital Realty: IAD51
18.82 miles Stack: Bristow 2 (NVA02L)
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
18.86 miles Valley TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.89 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.97 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.98 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.99 miles Stack: Bristow 1 (NVA02K)
Bristow 1 (NVA02K) is the first of two three-story data centers STACK Infrastructure proposed on a 58-acre site in Bristow, Virginia. Prince William County supervisors rejected the project in September 2025.
18.99 miles CloudHQ: MDC3
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
19.08 miles CloudHQ: MDC2
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
19.19 miles CloudHQ: MDC1
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
19.73 miles Data Center Edge District
The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
19.73 miles CloudHQ MCC2
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
19.76 miles CloudHQ: MCC7
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
19.97 miles CloudHQ: MCC5
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.

QTS Ashburn (Carpathia) Data Center Photos See all

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.

QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.

History:

  • On August 31, 2021 funds managed by Blackstone completed the acquisition of QTS Realty Trust.
  • April 30, 2019: Acquired two operating data centers in Groningen and Eemshaven, Netherlands, for approximately $44 million.
  • June 2015: QTS acquires Carpathis Hosting for $326 million. The transaction increases QTS's ability to serve IaaS and Government clients. Additionally the transaction provides a number of deployments within Equinix facilities.
  • July 8, 2014: Acquired the former Chicago Sun-Times printing plant for conversion to a data center.
  • June 30, 2014: Acquired the Princeton, New Jersey data center from McGraw Hill Financial.
  • 2013: Went public (IPO) and started trading under the symbol QTS on the NYSE.
  • 2010 Acquired their Richmond facility
  • 2005 QTS acquired Atlanta Suwanee data center
  • 2003: Company acquired its first data center in Overland Park, KS
  • 2003: QTS was founded by Chad Williams with its first data center in Overland Park in Kansas
0
Facilities
0
Markets

News See all

Read QTS Drops Plan for Data Center near Madison, Wisconsin
QTS Drops Plan for Data Center near Madison, Wisconsin

QTS Drops Plan for Data Center near Madison, Wisconsin

January 30, 2026 QTS Data Centers

QTS has backed off plans to develop a data center near Madison, Wisconsin, after pushback from local officials. The company has dropped plans for a campus in the Village of DeForest after the village announced its intention to deny an annexation request related to the project.“After individual...

Read more
Read QTS Starts Preparation for $13bn UK data center
QTS Starts Preparation for $13bn UK data center

QTS Starts Preparation for $13bn UK data center

October 10, 2025 QTS Data Centers

QTS has begun site work on a massive data center project in Northumberland, UK which could see an investment of up to £10 billion ($13.2bn) across 10 facilities if fully built out. This March, the project received outline planning permission from the local council. After initially being pitched...

Read more
Read QTS Plans Data Center in Forssa, Finland
QTS Plans Data Center in Forssa, Finland

QTS Plans Data Center in Forssa, Finland

August 20, 2025 QTS Data Centers

Data center firm QTS is expanding its European footprint with plans for a campus in Finland. The City of Forssa signed a preliminary agreement earlier this year with QTS for more than 100 hectares of land in Ratasmäki. "The interest of a large investor like Blackstone in Forssa is very good news....

Read more
Read QTS Breaks Ground on Data Center in Iowa
QTS Breaks Ground on Data Center in Iowa

QTS Breaks Ground on Data Center in Iowa

August 13, 2025 QTS Data Centers

QTS has officially announced plans for a new data center campus in Cedar Rapids, Iowa. The campus could support up to seven data center buildings at full build-out and see up to $10 billion invested.Tag Greason and David Robey, co-CEOs of QTS, said: “From day one, we believe in being a good...

Read more
Read Meta & QTS sign solar PPA in Oregon
Meta & QTS sign solar PPA in Oregon

Meta & QTS sign solar PPA in Oregon

December 06, 2024 QTS Data Centers

Avangrid and Portland General Electric (PGE) have signed a Power Purchase Agreement (PPA) with QTS and Meta for energy from a 120MW solar energy project under construction in Morrow County, Oregon. This project will deliver energy to the PGE grid through the Green Future Impact (GFI) program, a...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?