Aligned: Pataskala

Year Planned: 2028
Utility Provider: AEP Ohio
Lot Size: 89 acres

Aligned Data Centers is targeting Pataskala for its second development in the Buckeye State. Aligned broke into the Ohio market with a $202 million project in Sandusky.

The Texas-based company paid $13.9 million for three parcels of vacant land at 6770 Mink St SW (89.4 acres, SE corner of Broad St SW & Mink St SW), sold by Shaffer Family Investments LLC.

Proposed campus

  • ~200 MW across three buildings (reduced from an original four), on land zoned for manufacturing.
  • Powered primarily behind-the-meter by on-site Bloom Energy natural-gas fuel cells, sized for the full campus so as not to strain the local utility grid. About 15,000 dth/day of natural gas imported to the site (Columbia Gas of Ohio territory).
  • 3 MW backup generators; closed-loop cooling that reuses water (no municipal water draw).
  • Electric utility territory: AEP Ohio (PJM). Grid role limited to standby given the self-generation design.

Status (2026-07)

  • Application filed Nov 2025; land acquired 2023.
  • Pataskala Planning & Zoning Commission voted 5-2 on 2026-06-03 to recommend the City Council reject the site plan.
  • City Council public hearing and decision set for 2026-08-25; organized resident opposition, including a push for a fall ballot measure to block large data centers.

Map and Nearby Locations

6770 Mink St SW
Aligned Sites
Nearby Facilities

Aligned: Pataskala Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Aligned: Pataskala

Distance Site About
1.27 miles Global CampusInterested in this information?Contact us
Microsoft acquired 289 acres of land in Pataskala for $30.7 million.
1.62 miles ParkInterested in this information?Contact us
Microsoft expanded its Ohio footprint in 2024, purchasing an additional 43 acres in Pataskala for $11.44 million.
4.36 miles South TowerInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
4.38 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
4.39 miles EdgeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
4.39 miles DBT Data: 2214 Harrison Rd
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
4.41 miles Central HubInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
4.42 miles East PointInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
4.43 miles EdgeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
4.57 miles QTS: New Albany 2 DC1
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
4.61 miles Station BetaInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
4.69 miles Edge ValleyInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
4.76 miles NorthInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
4.77 miles EastInterested in this information?Contact us
The Prometheus data center campus in New Albany, Ohio, serves as a primary hub for Meta's AI training infrastructure.
4.83 miles Valley ThreeInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
4.87 miles NorthInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
4.92 miles CoreInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
4.97 miles EastInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
5.03 miles Prime RidgeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
5.04 miles East CampusInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
5.06 miles Valley GammaInterested in this information?Contact us
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
5.09 miles Cloud PlazaInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
5.12 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
5.15 miles Point PrimeInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
5.21 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
5.28 miles East CampusInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
5.39 miles OneInterested in this information?Contact us
Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.
6.03 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
6.58 miles EdgeConnex: Johnstown South Campus
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
6.59 miles EdgeConnex: Johnstown South 2
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
6.60 miles CeraNet Columbus
6.86 miles PlazaInterested in this information?Contact us
6.95 miles Center BetaInterested in this information?Contact us
6.99 miles HubInterested in this information?Contact us
7.01 miles Ridge AlphaInterested in this information?Contact us
Google recently expanded its footprint in Ohio, acquiring nearly 85 acres of land in New Albany, outside Columbus, for $63 million.
7.01 miles West CenterInterested in this information?Contact us
7.02 miles TwoInterested in this information?Contact us
7.05 miles Point ThreeInterested in this information?Contact us
7.05 miles Point OneInterested in this information?Contact us
7.09 miles West ParkInterested in this information?Contact us
7.11 miles DBT Data: Jug & Mink Project
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
7.11 miles CyrusOne: New Albany COL-1
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
7.13 miles Park MaxInterested in this information?Contact us
7.26 miles EdgeInterested in this information?Contact us
7.37 miles Vantage: OH13
This facility is a part of Vantage's New Albany data center campus in Ohio.
7.41 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
7.49 miles Vantage: OH12
This facility is a part of Vantage's New Albany data center campus in Ohio.
7.62 miles MaxInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
7.64 miles Vantage: New Albany (OH1)
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
7.65 miles Edge PointInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
7.70 miles EdgeConnex: Johnstown North Campus
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
7.75 miles Tower TwoInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
7.87 miles Center MaxInterested in this information?Contact us
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
7.88 miles GammaInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
7.95 miles CentralInterested in this information?Contact us
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
8.00 miles PointInterested in this information?Contact us
Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.
8.40 miles QTS: Miller Road, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
8.60 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon is building five data centers and related buildings totaling 1.25 million square feet on 85 of the 439 acres the company bought along Beech and Miller roads in early 2023.
8.63 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
8.68 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
8.69 miles Compass New Albany
8.71 miles Compugen New Albany
8.71 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
8.73 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
8.77 miles Stack: NAL01B
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
8.78 miles Hyperscale Data CenterInterested in this information?Contact us
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
8.80 miles TJX Corporate Techno
8.84 miles Discover Financial Services New Albany
9.00 miles Karis Critical: New Albany, OH
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
9.03 miles Edged Energy: Columbus CMH01
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
9.91 miles Cologix: Johnstown Expansion
9.95 miles Cologix: Johnstown COL7
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
9.99 miles Cologix: Johnstown COL8
11.11 miles Resilience CMH II
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
11.16 miles Compass Groveport AEP II
American Electric Power invested approximately $125 million into the data center on Hamilton Road
11.18 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Vantage plans to build another data center campus near Columbus, Ohio.
11.20 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
11.47 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
11.51 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Vantage's OH-E Campus in Ohio.
12.23 miles Hub PlusInterested in this information?Contact us
Microsoft put its data center construction plans on hold in New Albany, Heath, and Hebron in April 2025.
12.27 miles Racksquared 2560 Value Way
12.66 miles eNET Columbus
13.22 miles Cloud ParkInterested in this information?Contact us
Microsoft put its data center construction plans on hold in New Albany, Heath, and Hebron in April 2025.
13.74 miles MicroLink: Mansfield Campus
MicroLink is planning to build a data center in Columbus, Ohio.
14.01 miles Racksquared 325 E Spring St
14.12 miles CityNet Columbus
14.15 miles Lumen: 226 North Fifth
14.15 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
14.16 miles Cogent: 240 North 5th
14.17 miles Lumen: 266 North 5th
14.22 miles Lumen: 580 North 4th
14.23 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
14.23 miles CENTRA: 180 East Broad (CMH01)
14.32 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
14.48 miles WeConnect Westerville
14.61 miles Carrier-Neutral Data CenterInterested in this information?Contact us
16.66 miles Cologix COL3
16.70 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
16.73 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
16.76 miles PointInterested in this information?Contact us
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.
16.85 miles DataCanopy: Columbus
17.07 miles West HubInterested in this information?Contact us
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
17.28 miles Ridge UltraInterested in this information?Contact us
This data center is a part of Google's Lockbourne Campus in Ohio.
17.30 miles West CenterInterested in this information?Contact us
This data center is part of Google's Lockbourne Campus in Ohio.
17.41 miles MetroInterested in this information?Contact us
This data center is part of Google's Lockbourne Campus in Ohio.
17.50 miles Valley OneInterested in this information?Contact us
This data center is a part of Google's Lockbourne Campus in Ohio.
18.58 miles MaxInterested in this information?Contact us
This facility is part of Google's Lancaster campus in Ohio.
18.69 miles Cloud ParkInterested in this information?Contact us
In 2021 Google bought a farm at 104 Whiley Road, west of U.S. 33 and the first site was completed in 2024.
18.72 miles Expedient: Lewis Center (CMH3)
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
19.03 miles Expedient Upper Arlington
19.19 miles Centersquare: Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord.

Aligned: Pataskala Data Center Photos See all

Operating Company

Operated by:

Aligned Data Centers is an infrastructure technology company that offers colocation and build-to-scale solutions to cloud, enterprise, and managed service providers.

In early 2022, Aligned Energy was rebranded to Aligned Data Centers.

45
Facilities
14
Markets

News See all

Read Aligned Data Centers Sold in $40bn Deal
Aligned Data Centers Sold in $40bn Deal

Aligned Data Centers Sold in $40bn Deal

October 11, 2025 Aligned

Aligned Data Centers is being sold to BlackRock and MGX in a deal worth $40 billion, the biggest ever acquisition in the digital infrastructure space. Macquarie Asset Management selling it to a group comprising the AI Infrastructure Partnership (AIP), MGX, and BlackRock-owned Global...

Read more
Read Aligned to Develop 200-Acre Data Center Campus
 Aligned to Develop 200-Acre Data Center Campus

Aligned to Develop 200-Acre Data Center Campus

July 25, 2025 Aligned

Aligned Data Centers this week announced plans to expand in Central Ohio with the development of a data center campus inside the Conesville Industrial Park in Coshocton. Coshocton is located approximately 63 miles (101 km) northeast of Columbus.Aligned will develop a 197-acre parcel adjacent to...

Read more
Read Aligned to proceed with stalled data center camps at Maryland
Aligned to proceed with stalled data center camps at Maryland

Aligned to proceed with stalled data center camps at Maryland

May 24, 2024 Aligned

Aligned Data Centers has revealed its plans to proceed with its previously halted data center campus in Maryland after recent regulatory changes. around backup generators, easing restrictions for data center firms. With this move, Aligned will now be moving ahead with its plans for a campus in...

Read more
Read Aligned Data Centres unveils new liquid cooling system
Aligned Data Centres unveils new liquid cooling system

Aligned Data Centres unveils new liquid cooling system

January 16, 2024 Aligned

Data center firm Aligned recently unveiled a new liquid cooling system designed to support high-density compute requirements and supercomputers and can cool densities up to 300kW per rack. This cooling system, called DataFlow is said to be a turnkey solution which supports current and future...

Read more
Read Alligned Reveals New Brownfield Land Acquisition for DC Campus in Ohio
Alligned Reveals New Brownfield Land Acquisition for DC Campus in Ohio

Alligned Reveals New Brownfield Land Acquisition for DC Campus in Ohio

September 28, 2023 Aligned

On September 25, 2023, Aligned Data Centers announced the acquisition of a new brownfield land in Perkins Township., Northeast Ohio. The firm purchased the 129-acre parcel to construct a new four-building hyperscale data center campus. Aligned said its NEO-01 data center, the first of the four...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?