Go to PodcastThe Daniels Malinski Yorkville Family partnership (DMYF) owns about 268 acres at the northwest corner of US Route 34 and Beecher Road in Yorkville, Kendall County, Illinois, about 850 feet east of Eldamain Road. The land is zoned for a future data center. No end user or site plan has been filed.
Green Door's Kelaka tract lies to the north and the Hamman-Kelaka tract to the west. CyrusOne's Yorkville campus lies about 0.6 km north.
| Distance | Site | About |
|---|---|---|
| 0.57 miles | Kelaka: Yorkville Hamman |
Kelaka LLC land-bank data center tract of about 112 acres in Yorkville, Illinois, in two pieces: south of Faxon Road beside Kylyn's Ridge, and at US 34 and Eldamain Road. Yorkville annexed and rezoned it M-2 in 2025. No end user or site plan has been filed.
|
| 0.72 miles | Green Door: Yorkville Kelaka |
Green Door Capital land-bank data center tract of about 154 acres south of Faxon Road in Yorkville, Illinois, held by Yorkville Nexus IV LLC. Yorkville approved its annexation and rezoning; no end user or site plan has been filed. Lies just south of CyrusOne's Yorkville campus.
|
| 1.04 miles | DMYF: Yorkville Daniels North |
Land-bank data center tract of about 54 acres between the BNSF railroad and Faxon Road at Beecher Road in Yorkville, Illinois, owned by the Daniels Malinski Yorkville Family partnership. Rezoned M-2 in 2025, next to CyrusOne's campus. No end user or site plan filed.
|
| 1.13 miles | CyrusOne: Yorkville 7 |
Building 11G of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the east end of the south row, south of the on-site substation.
|
| 1.17 miles | CyrusOne: Yorkville 6 |
Building 11F of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the middle of the campus's south row.
|
| 1.18 miles | CyrusOne: Yorkville 9 |
Former ninth building of CyrusOne's 2024 Yorkville Technology Campus plan in Yorkville, Illinois. CyrusOne cut the campus to eight buildings in 2026, so this building is no longer planned.
|
| 1.19 miles | CyrusOne: Yorkville 8 |
Building 11H of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft on the campus's east edge along Beecher Road.
|
| 1.22 miles | CyrusOne: Yorkville 5 |
Building 11E of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the west end of the campus's south row, near Faxon Road.
|
| 1.28 miles | CyrusOne: Yorkville 4 |
Building 11D of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's middle row, just west of the on-site substation.
|
| 1.33 miles | CyrusOne: Yorkville 3 |
Building 11C of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the west end of the campus's middle row.
|
| 1.48 miles | CyrusOne: Yorkville 2 |
Building 11B of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 129,000 sq ft, the campus's smallest building, beside Building 11A in the northwest section.
|
| 1.55 miles | CyrusOne: Yorkville 1 |
Building 11A of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's northwest section. CyrusOne plans to build it first.
|
| 1.90 miles | Green Door: Yorkville 50 Acres |
Green Door Capital land-bank data center tract of about 50 acres at Eldamain and Corneils roads in Yorkville, Illinois, held by Yorkville Nexus LLC. Zoned M-2 for data center use; no end user or site plan has been filed. Lies just north of CyrusOne's Yorkville campus.
|
| 2.45 miles | Center UltraInterested in this information?Contact us |
Microsoft owns about 506 acres west of Eldamain Road at Corneils Road in Plano, Illinois, bought from three landowners in April 2024. Plano annexed and rezoned the land for a data center campus in 2024. Microsoft paused the project in June 2025.
|
| 2.54 miles | Prologis: Project Steel 1 |
Phase 1 of Prologis's Project Steel campus in Yorkville: four two-story data center buildings of about 425,000 sq ft each and two substations, east of the ComEd corridor off Corneils and Beecher roads. Construction is planned to start in 2027.
|
| 2.64 miles | Magnolia Hill: Yorkville Corneils Road |
Proposed data center site of about 143 acres at Corneils Road and IL Route 47 near Bristol, Illinois, east of Yorkville, linked to Orlando family office Magnolia Hill Partners. Yorkville logged it as a site inquiry in 2025; no petition has been filed.
|
| 2.71 miles | Green Door: Yorkville Hagemann |
Green Door Capital land-bank data center tract of about 138 acres on Eldamain Road in Yorkville, Illinois, held by Yorkville Nexus III LLC. Annexed and rezoned M-2 in 2024; no end user or site plan has been filed. Borders Prologis Project Steel near ComEd's Plano substation.
|
| 2.89 miles | Savion: Plano 1 |
Plano 1 is the first building in Savion's proposed data center campus beside the Plano Skies Energy Center north of Plano, Illinois.
|
| 3.16 miles | Savion: Plano Expansion | |
| 3.32 miles | Prologis: Project Steel Expansion |
Future Phases 2 and 3 of Prologis's Project Steel campus in Yorkville, Illinois: twelve two-story buildings and two substations at Galena and Eldamain roads, planned over the 2030s and 2040s.
|
| 3.71 miles | Pioneer: Project Cardinal Expansion |
The other 13 planned buildings of Pioneer Development's Project Cardinal campus in Yorkville, Illinois, built in northeast, south and west phases after the first building.
|
| 4.02 miles | Pioneer: Project Cardinal 1 |
First building of the northeast phase of Pioneer Development's Project Cardinal campus in Yorkville, Illinois. Planned as a two-story data center of about 1.36 million sq ft beside the campus ComEd switchyard and customer substation.
|
| 15.04 miles | CyrusOne: CHI2 DC2 |
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
|
| 15.22 miles | CyrusOne: CHI2 DC1 |
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
|
| 15.25 miles | DataCanopy: Chicago, IL | |
| 15.26 miles | CyrusOne: Aurora CME (CHI1) |
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
| 15.27 miles | Colovore: ORD01 |
Colovore's first Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Single data hall slated for service in late 2026.
|
| 15.28 miles | CyrusOne: CHI3 DC2 |
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
| 15.35 miles | Colovore: ORD03 |
Colovore's third Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Two-hall design with service dates in 2028.
|
| 15.39 miles | CyrusOne: CHI3 DC1 |
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
| 15.40 miles | Colovore: ORD04 |
Colovore's fourth Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus, adjacent to the company's ORD01 site. Two-hall design with service dates in late 2028 and early 2029.
|
| 15.43 miles | DataBridge: Aurora, IL |
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
|
| 15.44 miles | US Signal: IL02 Aurora |
US Signal's Aurora, Illinois data center at 4267 Meridian Parkway in the Meridian Business Campus, acquired in December 2025. The 70,000 sq ft facility carries about 33,000 sq ft of white space and is being upgraded in phases with new UPS, cooling and generator capacity, with liquid-cooled high-density space planned. It connects to US Signal's Oak Brook site and national fiber backbone and hosts the company's OpenCloud platform.
|
| 15.44 miles | 4267 Meridian Pkwy: Lincoln Rackhouse |
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
|
| 15.59 miles | Edged Energy: Chicago ORD03 |
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
|
| 15.62 miles | Edged Energy: Chicago ORD02 |
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
| 15.79 miles | Edged Energy: Aurora ORD01 |
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
| 16.42 miles | Equinix: Minooka CH8 |
The Equinix Minooka Data Center is a large-scale infrastructure project spanning approximately 300 acres of former farmland near Ridge and Holt Roads in Grundy County, Illinois.
|
| 16.49 miles | Equinix: CH9 |
This facility will be a part of Equinix's Minooka campus in Illinois.
|
| 16.55 miles | Equinix: CH10 |
This facility will be a part of Equinix's Minooka campus in Illinois.
|
| 16.62 miles | Equinix: CH11 |
This facility will be a part of Equinix's Minooka campus in Illinois.
|
| 16.83 miles | Equinix: CH12 |
This facility will be a part of Equinix's Minooka campus in Illinois.
|
| 16.93 miles | Equinix: CH13 |
This facility will be a part of Equinix's Minooka campus in Illinois.
|
| 17.02 miles | Equinix: CH14 |
This facility will be a part of Equinix's Minooka campus in Illinois.
|
| 17.33 miles | Hut 8: Batavia, IL |
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
|
| 17.79 miles | Summit: Naperville | |
| 17.82 miles | NetSource Chicago | |
| 18.70 miles | Tract: Morris Tech Park |
Data center developer Tract is making a major move into the Chicago market with the announcement of the Morris Technology Park, a 343-acre campus located in Morris, Illinois.
|
| 18.91 miles | SBA Edge: 603 Discovery |
Former New Continuum site that was acquired in 2019
|
| 19.48 miles | Colovore: West Chicago ORD02 |
ORD02 is Colovore's second Chicago-area facility, located in West Chicago and extending the company's distributed footprint across the metro. The liquid-cooled, HVDC-ready site is under construction and pre-leasing for edge AI and high-performance colocation workloads.
|
| 19.70 miles | Karis: Naperville (INEOS) |
Real estate developer Karis Critical is in early-stage exploratory discussions to potentially acquire the 168-acre former BP/INEOS campus at in Naperville, Illinois, within the Suburban Chicago market.
|
| 19.78 miles | Cogent Naperville |
Daniels Malinski Yorkville Family, LLLP (DMYF) is a family land partnership based in Lake Bluff, Illinois. Yorkville annexed and rezoned two of its farm tracts for data center use in 2025.
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to Podcast