Savion: Plano 1

Latest Podcast Rock Creek Road
Withdrawn
Project cancelled before construction
Operated by:

Savion: Plano 1

Sites on this Campus:

Plano 1 is the first building in Savion's proposed data center campus off Rock Creek Road, beside the Plano Skies Energy Center solar project north of Plano, Illinois.

  • In February 2026, the city confirmed that the Plano Skies application includes no data center.

Map and Nearby Locations

Rock Creek Road
Savion Sites
Nearby Facilities

Sites within 15 miles of Savion: Plano 1

Distance Site About
0.33 miles Savion: Plano Expansion
1.34 miles PointInterested in this information?Contact us
Microsoft owns about 506 acres west of Eldamain Road at Corneils Road in Plano, Illinois, bought from three landowners in April 2024. Plano annexed and rezoned the land for a data center campus in 2024. Microsoft paused the project in June 2025.
1.86 miles CyrusOne: Yorkville 1
Building 11A of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's northwest section. CyrusOne plans to build it first.
1.92 miles Green Door: Yorkville 50 Acres
Green Door Capital land-bank data center tract of about 50 acres at Eldamain and Corneils roads in Yorkville, Illinois, held by Yorkville Nexus LLC. Zoned M-2 for data center use; no end user or site plan has been filed. Lies just north of CyrusOne's Yorkville campus.
1.95 miles CyrusOne: Yorkville 3
Building 11C of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the west end of the campus's middle row.
1.98 miles CyrusOne: Yorkville 2
Building 11B of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 129,000 sq ft, the campus's smallest building, beside Building 11A in the northwest section.
1.98 miles CyrusOne: Yorkville 5
Building 11E of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the west end of the campus's south row, near Faxon Road.
2.14 miles CyrusOne: Yorkville 4
Building 11D of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's middle row, just west of the on-site substation.
2.17 miles CyrusOne: Yorkville 6
Building 11F of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the middle of the campus's south row.
2.18 miles Green Door: Yorkville Hagemann
Green Door Capital land-bank data center tract of about 138 acres on Eldamain Road in Yorkville, Illinois, held by Yorkville Nexus III LLC. Annexed and rezoned M-2 in 2024; no end user or site plan has been filed. Borders Prologis Project Steel near ComEd's Plano substation.
2.38 miles CyrusOne: Yorkville 7
Building 11G of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the east end of the south row, south of the on-site substation.
2.44 miles Green Door: Yorkville Kelaka
Green Door Capital land-bank data center tract of about 154 acres south of Faxon Road in Yorkville, Illinois, held by Yorkville Nexus IV LLC. Yorkville approved its annexation and rezoning; no end user or site plan has been filed. Lies just south of CyrusOne's Yorkville campus.
2.52 miles CyrusOne: Yorkville 9
Former ninth building of CyrusOne's 2024 Yorkville Technology Campus plan in Yorkville, Illinois. CyrusOne cut the campus to eight buildings in 2026, so this building is no longer planned.
2.54 miles CyrusOne: Yorkville 8
Building 11H of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft on the campus's east edge along Beecher Road.
2.78 miles Prologis: Project Steel Expansion
Future Phases 2 and 3 of Prologis's Project Steel campus in Yorkville, Illinois: twelve two-story buildings and two substations at Galena and Eldamain roads, planned over the 2030s and 2040s.
2.84 miles Prologis: Project Steel 1
Phase 1 of Prologis's Project Steel campus in Yorkville: four two-story data center buildings of about 425,000 sq ft each and two substations, east of the ComEd corridor off Corneils and Beecher roads. Construction is planned to start in 2027.
3.75 miles Pioneer: Project Cardinal Expansion
The other 13 planned buildings of Pioneer Development's Project Cardinal campus in Yorkville, Illinois, built in northeast, south and west phases after the first building.
3.85 miles Pioneer: Project Cardinal 1
First building of the northeast phase of Pioneer Development's Project Cardinal campus in Yorkville, Illinois. Planned as a two-story data center of about 1.36 million sq ft beside the campus ComEd switchyard and customer substation.
16.11 miles CyrusOne: CHI2 DC2
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
16.27 miles CyrusOne: CHI3 DC2
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
16.28 miles CyrusOne: CHI2 DC1
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
16.31 miles DataCanopy: Chicago, IL
16.33 miles CyrusOne: Aurora CME (CHI1)
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
16.39 miles CyrusOne: CHI3 DC1
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
16.60 miles Edged Energy: Chicago ORD03
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
16.60 miles Edged Energy: Chicago ORD02
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
16.69 miles Colovore: ORD01
Colovore's first Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Single data hall slated for service in late 2026.
16.76 miles Colovore: ORD03
Colovore's third Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Two-hall design with service dates in 2028.
16.77 miles Edged Energy: Aurora ORD01
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
16.80 miles Colovore: ORD04
Colovore's fourth Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus, adjacent to the company's ORD01 site. Two-hall design with service dates in late 2028 and early 2029.
16.85 miles DataBridge: Aurora, IL
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
16.85 miles 4267 Meridian Pkwy: Lincoln Rackhouse
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
16.85 miles US Signal: IL02 Aurora
US Signal's Aurora, Illinois data center at 4267 Meridian Parkway in the Meridian Business Campus, acquired in December 2025. The 70,000 sq ft facility carries about 33,000 sq ft of white space and is being upgraded in phases with new UPS, cooling and generator capacity, with liquid-cooled high-density space planned. It connects to US Signal's Oak Brook site and national fiber backbone and hosts the company's OpenCloud platform.
17.36 miles Park PrimeInterested in this information?Contact us
DeKalb 1 is one half of the first H-shaped building on Meta's DeKalb, Illinois campus, which opened in November 2023.
17.40 miles Core StationInterested in this information?Contact us
DeKalb 2 is the second half of the first H-shaped building on Meta's DeKalb, Illinois campus, which opened in November 2023.
17.60 miles CoreInterested in this information?Contact us
DeKalb 3 is the third building on Meta's DeKalb, Illinois campus, part of the expansion beyond the first H-shaped building.
17.62 miles Karis: DeKalb 6
This data center is a part of Karis' DeKalb Campus in Illinois.
17.67 miles Karis: DeKalb 5
This data center is a part of Karis' DeKalb Campus in Illinois.
17.68 miles MaxInterested in this information?Contact us
DeKalb 4 is the fourth building on Meta's DeKalb, Illinois campus, part of the expansion beyond the first H-shaped building.
17.70 miles Hut 8: Batavia, IL
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
17.72 miles Karis: DeKalb 7
This data center is a part of Karis' DeKalb Campus in Illinois.
17.72 miles CoreInterested in this information?Contact us
DeKalb 5 is the fifth building on Meta's DeKalb, Illinois campus, part of the expansion beyond the first H-shaped building.
17.74 miles Karis: DeKalb 4
This data center is a part of Karis' DeKalb Campus in Illinois.
17.80 miles Karis: DeKalb 2
This data center is a part of Karis' DeKalb Campus in Illinois.
17.82 miles Karis: DeKalb 3
This data center is a part of Karis' DeKalb Campus in Illinois.
17.85 miles Karis: DeKalb 1
Karis Critical is investing to build a huge data center campus in DeKalb, Illinois. The plan is for seven two-story data center buildings, each spanning 250,000 sq ft (23,226 sq m).
18.96 miles NetSource Chicago
19.23 miles Equinix: Minooka CH8
The Equinix Minooka Data Center is a large-scale infrastructure project spanning approximately 300 acres of former farmland near Ridge and Holt Roads in Grundy County, Illinois.
19.27 miles SBA Edge: 603 Discovery
Former New Continuum site that was acquired in 2019
19.30 miles Equinix: CH9
This facility will be a part of Equinix's Minooka campus in Illinois.
19.37 miles Equinix: CH10
This facility will be a part of Equinix's Minooka campus in Illinois.
19.44 miles Equinix: CH11
This facility will be a part of Equinix's Minooka campus in Illinois.
19.56 miles Summit: Naperville
19.64 miles Equinix: CH12
This facility will be a part of Equinix's Minooka campus in Illinois.
19.74 miles Equinix: CH13
This facility will be a part of Equinix's Minooka campus in Illinois.
19.83 miles Equinix: CH14
This facility will be a part of Equinix's Minooka campus in Illinois.
19.91 miles Colovore: West Chicago ORD02
ORD02 is Colovore's second Chicago-area facility, located in West Chicago and extending the company's distributed footprint across the metro. The liquid-cooled, HVDC-ready site is under construction and pre-leasing for edge AI and high-performance colocation workloads.

Savion: Plano 1 Data Center Photos See all

Conceptual plan for Savion's Plano Data Center
Source: Savion

Operating Company

Operated by:

Savion, a Shell Group portfolio company, is one of the largest, most technologically advanced utility-scale solar and energy storage project development companies in the United States. With a growing portfolio, Savion’s diverse team provides comprehensive services at each phase of renewable energy project development, from conception through construction. As part of this full-service model, Savion manages all aspects of development for customers, partners, and project host communities. Savion is committed to helping decarbonize the energy grid by replacing electric power generation with renewable sources and delivering cost-competitive electricity to the marketplace.

0
Facilities
0
Markets

News See all

Read Developer Pulls Proposed Data Center Project in Pekin, Illinois
Developer Pulls Proposed Data Center Project in Pekin, Illinois

Developer Pulls Proposed Data Center Project in Pekin, Illinois

May 13, 2026 Illinois

Developer Western Hospitality Partners (WHP) has officially withdrawn its proposal to develop a data center in Pekin, Illinois, roughly two months after Mayor Mary Burress announced publicly that the city would not proceed with the project. “This letter shall serve as purchaser’s notice to...

Read more
Read SunRocket Capital Funds $15m Solar and Storage Project in Illinois
SunRocket Capital Funds $15m Solar and Storage Project in Illinois

SunRocket Capital Funds $15m Solar and Storage Project in Illinois

July 18, 2025 Illinois

US-based private lender SunRocket Capital has closed a $15 million financing package for a solar with battery storage project designed to provide power to the data center sector in Illinois.“SunRocket Capital is proud to facilitate the growth of renewable energy infrastructure that powers the...

Read more
Read MISO approves regional transmission plan
 MISO approves regional transmission plan

MISO approves regional transmission plan

December 17, 2024 Illinois

The Midcontinent Independent System Operator’s (MISO) board has approved a $21.9 billion long-range transmission plan. The new transmission lines will span 1,800 miles and include some that will connect directly to PJM Interconnection’s 765kV system in Illinois, Indiana, and Ohio. “The main thing...

Read more
Read Google Cloud to provide private cloud region and colocation facility for CME Group
Google Cloud to provide private cloud region and colocation facility for CME Group

Google Cloud to provide private cloud region and colocation facility for CME Group

June 28, 2024 Illinois

Google Cloud is providing a private cloud region for financial services company CME Group in Aurora, Illinois which will host a specialized platform to support global trading of CME's futures and options markets and will provide traders with access to a cloud-based low-latency network and...

Read more
Read NCSA expands Radiant Supercomputer
NCSA expands Radiant Supercomputer

NCSA expands Radiant Supercomputer

May 09, 2024 Illinois

The University of Illinois Urbana-Champaign’s (UIUC) National Center for Supercomputing Applications (NCSA) this week announced it has installed additional graphics processing units (GPUs) to its private cloud Radiant system. The University acquired the GPU with a funding commitment of $50...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?