CyrusOne: Yorkville 3

Latest Podcast Faxon Rd & Eldamain Rd
Planned
Future facility in planning stage
Operated by:

CyrusOne: Yorkville 3

Short Code: Building 11C
Year Planned: 2030
Utility Provider: ComEd
Floors: 1

Building 11C is one of eight single-story data centers in CyrusOne's CHI 11 plan for its 228-acre Yorkville Technology Campus in Yorkville, Illinois. Yorkville approved the eight-building layout in July 2026.

  • Location: West end of the campus's middle row.
  • Building: About 246,400 sq ft, including a two-story office front. The main hall is about 24 ft tall, with screened rooftop equipment to about 51 ft.
  • Equipment: 56 air-cooled chillers and 57 backup generators in a screened mechanical yard.
  • Power: ComEd, through the campus customer substation fed by two 345 kV lines from ComEd's Plano substation.

Map and Nearby Locations

Faxon Rd & Eldamain Rd
CyrusOne Sites
Nearby Facilities

CyrusOne: Yorkville 3 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of CyrusOne: Yorkville 3

Distance Site About
0.11 miles CyrusOne: Yorkville 5
Building 11E of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the west end of the campus's south row, near Faxon Road.
0.18 miles CyrusOne: Yorkville 2
Building 11B of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 129,000 sq ft, the campus's smallest building, beside Building 11A in the northwest section.
0.20 miles CyrusOne: Yorkville 4
Building 11D of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's middle row, just west of the on-site substation.
0.22 miles CyrusOne: Yorkville 1
Building 11A of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's northwest section. CyrusOne plans to build it first.
0.23 miles CyrusOne: Yorkville 6
Building 11F of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the middle of the campus's south row.
0.43 miles CyrusOne: Yorkville 7
Building 11G of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the east end of the south row, south of the on-site substation.
0.57 miles CyrusOne: Yorkville 9
Former ninth building of CyrusOne's 2024 Yorkville Technology Campus plan in Yorkville, Illinois. CyrusOne cut the campus to eight buildings in 2026, so this building is no longer planned.
0.59 miles CyrusOne: Yorkville 8
Building 11H of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft on the campus's east edge along Beecher Road.
0.60 miles Green Door: Yorkville 50 Acres
Green Door Capital land-bank data center tract of about 50 acres at Eldamain and Corneils roads in Yorkville, Illinois, held by Yorkville Nexus LLC. Zoned M-2 for data center use; no end user or site plan has been filed. Lies just north of CyrusOne's Yorkville campus.
0.64 miles Green Door: Yorkville Kelaka
Green Door Capital land-bank data center tract of about 154 acres south of Faxon Road in Yorkville, Illinois, held by Yorkville Nexus IV LLC. Yorkville approved its annexation and rezoning; no end user or site plan has been filed. Lies just south of CyrusOne's Yorkville campus.
0.81 miles DMYF: Yorkville Daniels North
Land-bank data center tract of about 54 acres between the BNSF railroad and Faxon Road at Beecher Road in Yorkville, Illinois, owned by the Daniels Malinski Yorkville Family partnership. Rezoned M-2 in 2025, next to CyrusOne's campus. No end user or site plan filed.
0.95 miles Kelaka: Yorkville Hamman
Kelaka LLC land-bank data center tract of about 112 acres in Yorkville, Illinois, in two pieces: south of Faxon Road beside Kylyn's Ridge, and at US 34 and Eldamain Road. Yorkville annexed and rezoned it M-2 in 2025. No end user or site plan has been filed.
1.15 miles AlphaInterested in this information?Contact us
Microsoft owns about 506 acres west of Eldamain Road at Corneils Road in Plano, Illinois, bought from three landowners in April 2024. Plano annexed and rezoned the land for a data center campus in 2024. Microsoft paused the project in June 2025.
1.33 miles DMYF: Yorkville Daniels South
Land-bank data center tract of about 268 acres at the northwest corner of US 34 and Beecher Road in Yorkville, Illinois, owned by the Daniels Malinski Yorkville Family partnership. Yorkville annexed and rezoned it M-2 in 2025. No end user or site plan has been filed.
1.43 miles Green Door: Yorkville Hagemann
Green Door Capital land-bank data center tract of about 138 acres on Eldamain Road in Yorkville, Illinois, held by Yorkville Nexus III LLC. Annexed and rezoned M-2 in 2024; no end user or site plan has been filed. Borders Prologis Project Steel near ComEd's Plano substation.
1.50 miles Prologis: Project Steel 1
Phase 1 of Prologis's Project Steel campus in Yorkville: four two-story data center buildings of about 425,000 sq ft each and two substations, east of the ComEd corridor off Corneils and Beecher roads. Construction is planned to start in 2027.
1.95 miles Savion: Plano 1
Plano 1 is the first building in Savion's proposed data center campus beside the Plano Skies Energy Center north of Plano, Illinois.
2.10 miles Prologis: Project Steel Expansion
Future Phases 2 and 3 of Prologis's Project Steel campus in Yorkville, Illinois: twelve two-story buildings and two substations at Galena and Eldamain roads, planned over the 2030s and 2040s.
2.28 miles Savion: Plano Expansion
2.43 miles Magnolia Hill: Yorkville Corneils Road
Proposed data center site of about 143 acres at Corneils Road and IL Route 47 near Bristol, Illinois, east of Yorkville, linked to Orlando family office Magnolia Hill Partners. Yorkville logged it as a site inquiry in 2025; no petition has been filed.
2.70 miles Pioneer: Project Cardinal Expansion
The other 13 planned buildings of Pioneer Development's Project Cardinal campus in Yorkville, Illinois, built in northeast, south and west phases after the first building.
2.95 miles Pioneer: Project Cardinal 1
First building of the northeast phase of Pioneer Development's Project Cardinal campus in Yorkville, Illinois. Planned as a two-story data center of about 1.36 million sq ft beside the campus ComEd switchyard and customer substation.
14.68 miles CyrusOne: CHI2 DC2
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
14.85 miles CyrusOne: CHI2 DC1
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
14.88 miles CyrusOne: CHI3 DC2
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
14.88 miles DataCanopy: Chicago, IL
14.90 miles CyrusOne: Aurora CME (CHI1)
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
15.00 miles CyrusOne: CHI3 DC1
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
15.09 miles Colovore: ORD01
Colovore's first Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Single data hall slated for service in late 2026.
15.17 miles Colovore: ORD03
Colovore's third Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Two-hall design with service dates in 2028.
15.20 miles Edged Energy: Chicago ORD03
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
15.21 miles Colovore: ORD04
Colovore's fourth Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus, adjacent to the company's ORD01 site. Two-hall design with service dates in late 2028 and early 2029.
15.22 miles Edged Energy: Chicago ORD02
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
15.25 miles DataBridge: Aurora, IL
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
15.26 miles US Signal: IL02 Aurora
US Signal's Aurora, Illinois data center at 4267 Meridian Parkway in the Meridian Business Campus, acquired in December 2025. The 70,000 sq ft facility carries about 33,000 sq ft of white space and is being upgraded in phases with new UPS, cooling and generator capacity, with liquid-cooled high-density space planned. It connects to US Signal's Oak Brook site and national fiber backbone and hosts the company's OpenCloud platform.
15.26 miles 4267 Meridian Pkwy: Lincoln Rackhouse
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
15.39 miles Edged Energy: Aurora ORD01
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
16.66 miles Hut 8: Batavia, IL
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
17.51 miles NetSource Chicago
17.67 miles Equinix: Minooka CH8
The Equinix Minooka Data Center is a large-scale infrastructure project spanning approximately 300 acres of former farmland near Ridge and Holt Roads in Grundy County, Illinois.
17.73 miles Equinix: CH9
This facility will be a part of Equinix's Minooka campus in Illinois.
17.79 miles Equinix: CH10
This facility will be a part of Equinix's Minooka campus in Illinois.
17.82 miles Summit: Naperville
17.86 miles Equinix: CH11
This facility will be a part of Equinix's Minooka campus in Illinois.
18.09 miles Equinix: CH12
This facility will be a part of Equinix's Minooka campus in Illinois.
18.18 miles Equinix: CH13
This facility will be a part of Equinix's Minooka campus in Illinois.
18.24 miles SBA Edge: 603 Discovery
Former New Continuum site that was acquired in 2019
18.26 miles Equinix: CH14
This facility will be a part of Equinix's Minooka campus in Illinois.
18.84 miles Colovore: West Chicago ORD02
ORD02 is Colovore's second Chicago-area facility, located in West Chicago and extending the company's distributed footprint across the metro. The liquid-cooled, HVDC-ready site is under construction and pre-leasing for edge AI and high-performance colocation workloads.
18.87 miles Metro PlazaInterested in this information?Contact us
DeKalb 1 is one half of the first H-shaped building on Meta's DeKalb, Illinois campus, which opened in November 2023.
18.92 miles Station ProInterested in this information?Contact us
DeKalb 2 is the second half of the first H-shaped building on Meta's DeKalb, Illinois campus, which opened in November 2023.
19.11 miles Karis: DeKalb 6
This data center is a part of Karis' DeKalb Campus in Illinois.
19.12 miles TwoInterested in this information?Contact us
DeKalb 3 is the third building on Meta's DeKalb, Illinois campus, part of the expansion beyond the first H-shaped building.
19.16 miles Karis: DeKalb 5
This data center is a part of Karis' DeKalb Campus in Illinois.
19.20 miles Karis: DeKalb 7
This data center is a part of Karis' DeKalb Campus in Illinois.
19.21 miles PointInterested in this information?Contact us
DeKalb 4 is the fourth building on Meta's DeKalb, Illinois campus, part of the expansion beyond the first H-shaped building.
19.23 miles Karis: DeKalb 4
This data center is a part of Karis' DeKalb Campus in Illinois.
19.26 miles Tower UltraInterested in this information?Contact us
DeKalb 5 is the fifth building on Meta's DeKalb, Illinois campus, part of the expansion beyond the first H-shaped building.
19.27 miles Karis: DeKalb 2
This data center is a part of Karis' DeKalb Campus in Illinois.
19.30 miles Karis: DeKalb 3
This data center is a part of Karis' DeKalb Campus in Illinois.
19.32 miles Karis: DeKalb 1
Karis Critical is investing to build a huge data center campus in DeKalb, Illinois. The plan is for seven two-story data center buildings, each spanning 250,000 sq ft (23,226 sq m).
19.46 miles Karis: Naperville (INEOS)
Real estate developer Karis Critical is in early-stage exploratory discussions to potentially acquire the 168-acre former BP/INEOS campus at in Naperville, Illinois, within the Suburban Chicago market.
19.58 miles Cogent Naperville

Operating Company

Operated by:

CyrusOne is a data center owner, operator, and developer that manages more than 50 facilities, with its footprint concentrated in the U.S. and Europe. The company is based in Dallas and was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt.

Its portfolio centers on hyperscale and enterprise colocation across multi-building campuses. CyrusOne has also pursued international growth initiatives alongside its core North American and European markets.

CyrusOne History:

  • March 2022: Taken private by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt.
  • July 2015: Acquired Cervalis, adding four data centers and two disaster recovery sites in the New York metro.
  • July 2014: Acquired Cervalis
  • January 2013: Completed initial public offering on NASDAQ as a carve-out of Cincinnati Bell’s data center business.
  • June 2010: Cincinnati Bell acquired CyrusOne for approximately 525 million dollars.
  • 2000: Founded by David Ferdman.
0
Facilities
0
Markets

News See all

Read CyrusOne Files Plans for Three-Building, $1.5bn Data Center Campus in Fairfield, Texas
CyrusOne has filed plans for three buildings at a new data center campus in Fairfield, Texas, located adjacent to Calpine’s Freestone natural gas power plant. The project, on FM 488 in Freestone Co...

CyrusOne Files Plans for Three-Building, $1.5bn Data Center Campus in Fairfield, Texas

August 01, 2026 CyrusOne

CyrusOne has filed plans for three buildings at a new data center campus in Fairfield, Texas, located adjacent to Calpine’s Freestone natural gas power plant. The project, on FM 488 in Freestone County, about 90 miles (144.8km) south of Dallas, is part of a 760MW data center development being...

Read more
Read CyrusOne Begins Construction on 380MW Data Center in Texas
CyrusOne has begun construction on a new data center campus in Texas, breaking ground last week in Freestone County, about 90 miles (144 km) south of Dallas. Full details of the planned development...

CyrusOne Begins Construction on 380MW Data Center in Texas

June 08, 2026 CyrusOne

CyrusOne has begun construction on a new data center campus in Texas, breaking ground last week in Freestone County, about 90 miles (144 km) south of Dallas. Full details of the planned development have not yet been disclosed. CyrusOne has partnered with Constellation on a 380MW agreement to...

Read more
Read CyrusOne to Internalize US Data Center Operations
CyrusOne to Internalize US Data Center Operations

CyrusOne to Internalize US Data Center Operations

May 07, 2026 CyrusOne

US data center operator CyrusOne is bringing a significant portion of its on-site operations in-house, ending large sections of its existing outsourcing partnership with JLL. The KKR-owned company confirmed to DCD this week that it is restructuring its US operating model by internalizing on-site...

Read more
Read CyrusOne Wins Approval for Sangamon, Illinois Data Center
CyrusOne Wins Approval for Sangamon, Illinois Data Center

CyrusOne Wins Approval for Sangamon, Illinois Data Center

April 09, 2026 CyrusOne

CyrusOne has received approval to build a data center in Sangamon, Illinois. Members of the Sangamon County Board voted on Tuesday to allow construction of the $500 million project, which will span 280 acres and include four buildings at the 13000 block of Thayer Road in Waverly.CyrusOne has said...

Read more
Read CyrusOne Starts Construction on First Italy Data CenterI Outside Milan
CyrusOne Starts Construction on First Italy Data CenterI Outside Milan

CyrusOne Starts Construction on First Italy Data CenterI Outside Milan

March 28, 2026 CyrusOne

CyrusOne has broken ground on its first data center in Italy. The company this week announced it has officially broken ground on MIL1 in Milan. The three-story facility will deliver 27MW of IT capacity across 7,000 sqm (75,345 sq ft) of technical space, with the first phase expected to go live by...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?