0.33 miles
|
Savion: Plano, Illinois
|
Savion, the company developing the massive 250MW Plano Skies Energy Center solar project in Kendall County, Illinois, is now proposing to add a large data center campus to the development.
|
|
2.10 miles
|
AlphaInterested in this information?Contact us
|
Microsoft acquired 500 acres of land around Eldamain and Corneils roads from three landowners in Plano, Illinois.
|
|
2.27 miles
|
CyrusOne: Yorkville Campus
|
CyrusOne is building a huge data center campus on 228 acres in Kendall County outside of Chicago, Illinois. The data center campus will have up to nine (9) two-story buildings and a centralized 800,000-square-foot electric substation.
|
|
2.37 miles
|
CyrusOne: Yorkville 3
|
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
|
2.40 miles
|
CyrusOne: Yorkville 2
|
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
|
2.51 miles
|
CyrusOne: Yorkville 4
|
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
|
2.64 miles
|
CyrusOne: Yorkville 5
|
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
|
2.69 miles
|
CyrusOne: Yorkville 7
|
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
|
2.71 miles
|
CyrusOne: Yorkville 6
|
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
|
2.83 miles
|
Prologis: Project Steel Expansion
|
|
|
2.84 miles
|
CyrusOne: Yorkville 8
|
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
|
2.85 miles
|
CyrusOne: Yorkville 9
|
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
|
2.95 miles
|
Prologis: Project Steel
|
Project Steel involves developing a 540-acre campus featuring 24 two-story data center buildings, totaling over 9 million square feet (836,125 sqm), along with three substations.
|
|
3.35 miles
|
Project Cardinal Expansion
|
|
|
3.44 miles
|
Project Cardinal
|
Pioneer Development, LLC has filed an application for Project Cardinal, a sprawling data center campus planned for over 1,000 acres in Yorkville, Kendall County.
|
|
16.40 miles
|
CyrusOne: CHI2 DC2
|
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
|
|
16.56 miles
|
CyrusOne: CHI3 DC2
|
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
|
16.57 miles
|
CyrusOne: Aurora CHI2
|
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
|
|
16.61 miles
|
DataCanopy: Chicago, IL
|
|
|
16.63 miles
|
CyrusOne Chicago Aurora CME
|
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
|
16.68 miles
|
CyrusOne: Aurora III (CHI3)
|
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
|
16.89 miles
|
Edged Energy: Chicago ORD03
|
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
|
|
16.89 miles
|
Edged Energy: Chicago ORD02
|
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
|
17.04 miles
|
Colovore: Aurora ORD03
|
Colovore's third Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Two-hall design with service dates in 2028.
|
|
17.06 miles
|
Edged Energy: Aurora ORD01
|
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
|
17.08 miles
|
Colovore: Aurora ORD01
|
Colovore's first Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Single data hall slated for service in late 2026.
|
|
17.11 miles
|
Colovore: Aurora ORD04
|
Colovore's fourth Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus, adjacent to the company's ORD01 site. Two-hall design with service dates in late 2028 and early 2029.
|
|
17.16 miles
|
DataBridge: Aurora, IL
|
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
|
|
17.16 miles
|
US Signal: IL02 Aurora
|
US Signal's Aurora, Illinois data center at 4267 Meridian Parkway in the Meridian Business Campus, acquired in December 2025. The 70,000 sq ft facility carries about 33,000 sq ft of white space and is being upgraded in phases with new UPS, cooling and generator capacity, with liquid-cooled high-density space planned. It connects to US Signal's Oak Brook site and national fiber backbone and hosts the company's OpenCloud platform.
|
|
17.16 miles
|
4267 Meridian Pkwy: Lincoln Rackhouse
|
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
|
|
17.17 miles
|
Edge ValleyInterested in this information?Contact us
|
Three years after construction began, the social media giant Meta's new data center in DeKalb became officially operational in December 2023.
|
|
17.21 miles
|
PointInterested in this information?Contact us
|
Three years after construction began, the social media giant Meta's new data center in DeKalb became officially operational in December 2023.
|
|
17.40 miles
|
ValleyInterested in this information?Contact us
|
|
|
17.44 miles
|
Karis: DeKalb 6
|
This data center is a part of Karis' DeKalb Campus in Illinois.
|
|
17.48 miles
|
Karis: DeKalb 5
|
This data center is a part of Karis' DeKalb Campus in Illinois.
|
|
17.48 miles
|
East PlazaInterested in this information?Contact us
|
|
|
17.52 miles
|
Center OneInterested in this information?Contact us
|
|
|
17.53 miles
|
Karis: DeKalb 7
|
This data center is a part of Karis' DeKalb Campus in Illinois.
|
|
17.55 miles
|
Karis: DeKalb 4
|
This data center is a part of Karis' DeKalb Campus in Illinois.
|
|
17.62 miles
|
Karis: DeKalb 2
|
This data center is a part of Karis' DeKalb Campus in Illinois.
|
|
17.63 miles
|
Karis: DeKalb 3
|
This data center is a part of Karis' DeKalb Campus in Illinois.
|
|
17.67 miles
|
Karis: DeKalb Campus
|
Karis Critical is investing to build a huge data center campus in DeKalb, Illinois. The plan is for seven two-story data center buildings, each spanning 250,000 sq ft (23,226 sq m).
|
|
17.95 miles
|
Hut 8: Batavia, IL
|
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
|
|
19.26 miles
|
NetSource Chicago
|
|
|
19.46 miles
|
Equinix: Minooka CH8
|
The Equinix Minooka Data Center is a large-scale infrastructure project spanning approximately 300 acres of former farmland near Ridge and Holt Roads in Grundy County, Illinois.
|
|
19.52 miles
|
SBA Edge: 603 Discovery
|
Former New Continuum site that was acquired in 2019
|
|
19.53 miles
|
Equinix: CH9
|
This facility will be a part of Equinix's Minooka campus in Illinois.
|
|
19.60 miles
|
Equinix: CH10
|
This facility will be a part of Equinix's Minooka campus in Illinois.
|
|
19.67 miles
|
Equinix: CH11
|
This facility will be a part of Equinix's Minooka campus in Illinois.
|
|
19.86 miles
|
Equinix: CH12
|
This facility will be a part of Equinix's Minooka campus in Illinois.
|
|
19.89 miles
|
Summit: Naperville
|
|
|
19.96 miles
|
Equinix: CH13
|