EC33 Johor

Operational
Fully operational facility
Operated by:

EC33 Johor

░░░░ Request Dataset MW
Operational Power
  • Electrical Capacity - 4kW/Rack supplied by Autonomax ™
  • EIX ports offer 10G and 100G ports on a Layer 2 Ethernet platform
  • Building Type – Single-story structure
  • Fire Cross Connects – Single-Mode fibre (LC connectors), CAT6

Map and Nearby Locations

Wadi Hana ( 80300 Johor Bahru )
Edge Centres Sites
Nearby Facilities

Sites within 15 miles of EC33 Johor

Distance Site About
0.89 miles Open DC JB2
Open DC JB2 is a carrier-neutral data center suite in Menara Ansar, Johor Bahru.
1.00 miles Open DC JB1
Open DC JB1 is a carrier-neutral data center in the Menara MSC Cyberport tower, about 2 km from the Johor-Singapore Causeway.
2.43 miles 1-Net North Data Centre
Constructed in 2016, the 1-Net North Data Center is a 5 story datacenter. It is located in Marsiling in northern Singapore. Situated in a low risk environment. It is specifically designed and constructed to meet the strict security guidelines of Uptime Institute and Monetary Authority of Singapore (MAS).
3.07 miles East CenterInterested in this information?Contact us
3.21 miles Ridge PlusInterested in this information?Contact us
4.04 miles Global Switch Singapore Woodlands
5.96 miles StarHub North Point Yishun
6.47 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.53 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.53 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.59 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.64 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.66 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.70 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.72 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.76 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.79 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.86 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.99 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.08 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.41 miles Empyrion (DoDid) Singapore
In 2021, Empyrion acquired the site and Dodid Pte Ltd.
7.43 miles YTL: Singapore
In 2021, YTL Power International Berhad ("YTL Power”), through its subsidiary YTL Data Center Holdings Pte. Ltd. (“YTL DC”), completed the acquisition of Dodid Pte. Ltd. ("Dodid”), owner of this Tier-3 data center in Singapore.
8.18 miles Bridge DC: MY07 Expansion
The last two buildings Bridge Data Centres plans for its Ulu Tiram MY07 campus, on the west plot.
8.21 miles Bridge DC: MY07 Phase 1
The first two data centre buildings on Bridge Data Centres' Ulu Tiram MY07 campus, built in 2025 on land bought from Paragon Globe.
8.23 miles ST Engineering Digital Hub
The ST Engineering Digital Hub serves as the third secure data facility in Singapore for ST Engineering, a Singaporean multinational technology and engineering group.
8.27 miles ST Engineering Hub
The ST Engineering Hub serves as the second secure data facility in Singapore for ST Engineering, a Singaporean multinational technology and engineering group.
8.35 miles Bridge DC: MY07 Phase 2
The second phase of Bridge Data Centres' Ulu Tiram MY07 campus: four buildings under construction on the north side.
8.98 miles Nova Complex: IMS-GT Cluster
Nova Complex, an infrastructure development firm based in Singapore, plans to establish IMS-GT Cluster (Indonesia-Malaysia-Singapore Growth Triangle) in Singapore.
9.02 miles Plaza MaxInterested in this information?Contact us
9.10 miles Cloud HubInterested in this information?Contact us
9.14 miles Edge RidgeInterested in this information?Contact us
9.35 miles StarHub Ang Mo Kio
9.74 miles ST Engineering: Jalan Boon Lay
Singaporean multinational technology and engineering group, ST Engineering, is developing its fourth data center in Singapore's Jalan Boon Lay area.
10.09 miles Princeton SG1
Situated in the heart of Singapore, 15 minutes from town and 20 minutes from the airport, our data center in Singapore is a strategic location for hyperscalers and enterprises that are looking to expand and require additional capacity. https://princetondg.com/locations/sg1/
10.09 miles STT Jurong
10.10 miles CyrusOne Singapore
CryusOne is located within Digital Realty's facility at 29A International Business Park
10.10 miles Digital Jurong: 29A International Business Park - Digital Realty
Digital Realty’s 7 story data centre is located in the Jurong East area of Singapore, at 29A International Business Park.
10.10 miles Colt/KVH Singapore DC1 (SGDC1)
10.10 miles NTT: Jurong
Jurong Data Center is a 40-minute drive from Singapore Changi Airport, and a 20-minute drive from central Singapore.
10.10 miles Cyxtera Singapore SG2
10.14 miles Iron Mountain Singapore SIN-1
Iron Mountain's Singapore SIN-1 site is a purpose-built data center developed to global banking standards with 5.5 MW of power capacity over four 10,000 SF data halls.
10.18 miles EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.25 miles M1 Next-Gen Singapore
10.32 miles NTT Singapore Serangoon SG1
Launched in 2012, Serangoon Data Center is NTT's first self-built and self-managed data center outside of Japan.
10.34 miles Kepple DC Singapore 1 (S25)
10.36 miles TM Nxera: Johor
Singtel's data center subsidiary, Nxera , and Telekom Malaysia (TM) have commenced construction on a new data center facility in Iskandar Puteri, Johor.
10.59 miles Nxera: DC West
Singtel's DC West is located in Jurong Lake District, a commercial hub outside of the Central Business District. DC West is close to the Kingsland Data Center and Telin-3 in Singapore Data Center Park (DCP.)
10.59 miles Equalbase: Johor
Malaysian real estate firm Equalbase has acquired 64 acres in Johor's Sunway City Iskandar Puteri from Sunway Group for RM380 million ($80.4M).
10.64 miles Digital Hyperspace: Johor
AME Elite, a Malaysian real estate company, has agreed to sell 35 acres of land in i-TechValley to Digital Hyperspace Malaysia SDN BHD for RM210.3 million ($2.5 million).
10.67 miles Equinix SG6
10.69 miles Metro CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.80 miles 1AsiaCom New Tech Park
1Asia Data Centre located in the telecom building in Singapore which is known as New Tech Park.
10.81 miles Epsilon Singapore New Tech Park
10.83 miles Empyrion: Nusajaya Campus MY1
Empyrion Digital is expanding its pan-Asian footprint with the development of the MY1 campus in Johor, Malaysia.
10.84 miles Edge PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.88 miles Epoch Digital: Johor
Epoch Digital was established by Investment firm Actis in November 2022 with a defined go-to-market strategy. Its second project is a huge data center campus located in Johor, Malaysia.
11.06 miles Digital Halo: Johor
Crescendo Corporation Berhad (CCB) sold a 20.46-acre industrial plot in Johor to Digital Halo Pte Ltd for RM115.87 million ($24.6 million).
11.06 miles Edgnex: Johor
Crescendo Corporation, a Malaysian property developer, has sold 74,360 sqm (800,400 sq ft) of land in the Nusa Cemerlang Industrial Park to Data Cloud Innovation Sdn Bhd for RM120 million ($27.1m).
11.06 miles STT Johor Campus
The new STT Johor data centre campus will be constructed on over 22 acres of land, offering a development potential of IT power supplied by diverse substations located nearby.
11.30 miles West TowerInterested in this information?Contact us
11.37 miles MSFusion Johor Campus
MSFusion, a subsidiary of the Singapore cloud company Megaspeed, is building an AI data center campus in Kota Cemerlang Industrial Park, Kota Tinggi, Johor.
11.38 miles CentralInterested in this information?Contact us
11.39 miles DayOne: NTP-C
NTP-C is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
11.41 miles BetaInterested in this information?Contact us
11.41 miles NTT: Gelang Patah
NTT plans a six-building data center campus at Gelang Patah, Iskandar Puteri, Johor, beside Taman Nusa Bayu.
11.41 miles ZData: Johor
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
11.42 miles AirTrunk Johor Bahru JHB1
AirTrunk officially commenced operations at its JHB1 data center campus in Johor in 2024.
11.42 miles DayOne: NTP-B
NTP-B is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
11.42 miles Equinix Singapore SG2
SG2 facility at Pioneer Walk is home to Equinix's Asia-Pacific Network Operation Centre with Internet exchange points access to one of the world's three GRX peering points.
11.44 miles Princeton PDG: SG3
In 2024, Princeton Digital Group acquired the Yahoo data centre in western Singapore as the Warburg Pincus-backed platform continues to expand aggressively in the city-state and neighbouring territories.
11.44 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.45 miles AirTrunk: Johor JHB2
AirTrunk plans to develop its second cloud and AI-ready data centre in Malaysia, named AirTrunk JHB2 located in Iskandar Puteri, Johor region
11.45 miles DayOne: NTP-A
NTP-A is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
11.46 miles Keppel DC Singapore 5 (Kingsland)
Kingsland Data Center was completed in Singapore in Q3 2015. The 208,000ft2, 5-storey purpose-built data center facility has 30MVA of redundant power supported by two diverse sub-stations.
11.50 miles Digital Edge: Johor Campus
Digital Edge, an Asia Pacific data center company backed by Stonepeak, plans its first Malaysian campus in Kota Cemerlang Industrial Park, Kota Tinggi, Johor.
11.50 miles Metro HubInterested in this information?Contact us
11.52 miles Equinix Singapore SG5
SG5 is a nine-story facility located at the Tanjong Kling data center park. At full buildout, it will offer 5,000 cabinets, with a total colocation space of close to 129,000 square feet (12,000 square meters).
11.52 miles Telekom Malaysia: IPDC 1
IPDC Block 1 is the first of two buildings on Telekom Malaysia's Iskandar Puteri Data Centre campus in Nusajaya Tech Park, Johor.
11.52 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.55 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.55 miles Telekom Malaysia: IPDC 2
IPDC Block 2 is the second of two buildings on Telekom Malaysia's Iskandar Puteri Data Centre campus in Nusajaya Tech Park, Johor.
11.57 miles NeutraDC: Telin-3
Telin-3, a purposed built 5-storey multi-tier data centre and telecommunication hub is strategically located in the Singapore Data Centre Park (Tanjong Kling).
11.57 miles DayOne: NTP-K
NTP-K is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
11.60 miles Global PointInterested in this information?Contact us
11.61 miles DayOne: Jln Buroh, Singapore
In 2024, Chinese data center firm GDS acquired this property at 21 Jalan Buroh in Singapore from CapitaLand, with plans to convert it into a data center.
11.63 miles Equinix Johor JH1
The JH1 IBX data center is located in the Nusajaya Technology Park (NTP) within Iskandar, Johor, just 15 km away from Singapore's Tuas Checkpoint.
11.63 miles DayOne: NTP-H
NTP-H is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
11.63 miles Mapletree: Sunview 1
Mapletree Sunview 1 is a purpose-built data center completed on July 13, 2018. The six-story facility offers approximately 242,000 square feet of gross floor area and was developed as a build-to-suit (BTS) project.
11.64 miles Point ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.65 miles DayOne: NTP-L
NTP-L is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
11.70 miles DayOne: NTP-G
NTP-G is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
11.71 miles Equinix: JH2
Equinix's JH2 data center in Johor is officially topped out and on track for a 2027 debut.
11.71 miles DayOne: NTP-J
NTP-J is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
11.72 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.76 miles DayOne: NTP-N
NTP-N is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
11.77 miles DayOne: NTP-M
NTP-M is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
11.80 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.88 miles Racks Central: RCJM2B
RCJM2B is a later phase of Racks Central's AI data center campus in Iskandar Halal Park, Pasir Gudang, Johor.
11.89 miles Stack: JHB01B
JHB01B is the second building planned on STACK's JHB01 campus in Iskandar Puteri, Johor, on the east side of the lot beside JHB01A and served by the campus's on-site TNB 275 kV substation.
11.92 miles Racks Central: RCJM2A
RCJM2A is the second phase of Racks Central's AI data center campus in Iskandar Halal Park, Pasir Gudang, Johor.
11.93 miles DayOne: NTP-F
NTP-F is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
11.96 miles Stack: JHB01A
JHB01A is the first of two buildings on STACK's JHB01 campus in Iskandar Puteri, Johor: a two-storey data center with a multi-level external electrical yard, beside the campus's on-site TNB 275 kV substation. Construction began in 2025.
11.99 miles Racks Central: Pasir Gudang RCJM1
RCJM1 is the first phase of Racks Central's AI data center campus in Iskandar Halal Park, Pasir Gudang, Johor.
12.12 miles NUS Computer Centre
12.33 miles AirTrunk: Johor JHB3
JHB3 is AirTrunk’s planned hyperscale expansion in Iskandar Puteri and represents the next stage of the company’s Johor platform growth focused on cloud and AI demand.
12.35 miles STT Singapore 2
STT Singapore 2 is located in the east of Singapore, in the Defu Industrial Estate that is undergoing redevelopment into a green and sustainable industrial park of tomorrow.
12.36 miles Equinix Singapore SG3
Equinix SG3 is a 7 story, purpose-built facility is constructed in a flood- and earthquake-free zone and connects to the carrier dense SG1 facility via dark fiber. Together SG1 and SG3 form a virtual campus in One-North.
12.38 miles DayOne: Tanjung Kupang
DayOne has agreed to buy industrial land near Tanjung Kupang, Iskandar Puteri, for a data center campus.
12.40 miles STT Singapore 3
The seven-story facility at Defu Avenue 1 has an IT load capacity of 15MW, giving total capacity of 40 MW at the STT Defu campus
12.40 miles STT Singapore 1
STT Singapore 1 is located in the east of Singapore, in the Defu Industrial Estate that is undergoing redevelopment into a green and sustainable industrial park of tomorrow.
12.40 miles AirTrunk: Johor JHB4
JHB4 is AirTrunk’s second newly announced Johor hyperscale campus and extends the company’s long-term Malaysia expansion strategy.
12.42 miles Internap Singapore: 20 Ayer Rajah Crescent
12.42 miles Equinix Singapore SG1
12.47 miles ESR-Logos: Johor
The plan for a 350MW data center campus in Johor, Malaysia, by Logos and UEM Sunrise has been officially cancelled.
12.60 miles StarHub Cable Vision
12.62 miles NUS Prince George's Park
12.68 miles STT Singapore 4
STT MediaHub is close to Equinix's SG1 and has access to the dense network ecosystem at SG1.
12.71 miles Capitaland: 38A Kim Chuan Road
12.72 miles Nxera: Kim Chuan 2
Singtel operated from two data center buildings at 38 Kim Chuan Road: KCTC-1 and KCTC-2. In 2024, the Singaporean telco announced the closure of KCTC-1 as part of its shift towards newer, AI-focused facilities.
12.77 miles Singtel TUAS CLS
12.78 miles Nxera: DC Tuas
12.79 miles Citigroup Singapore
12.79 miles CINTECH II (Singapore Science Park I)
CINTECH II is a three-storey development ideal for companies in infocomm technology, product design & development, R&D engineering and back-end business operations.
12.81 miles Kim Chuan Telecommunications Complex
Kim Chuan Telecommunications Complex is a 10-storey data centre located a short distance from the Aljunied MRT Station and is easily accessible by PIE. CapitaLand Ascendas REIT acquired this site in 2005.
12.91 miles Keppel DC: Singapore 9
Singapore 9 is the third of three planned buildings on the Keppel Data Centre Campus at Genting Lane.
12.95 miles Keppel DC: Singapore 8
The six-story Keppel DC Singapore 8 has a net lettable area of approximately 100,882 sq ft (9,372 sqm).
12.96 miles Keppel DC Singapore 7
Keppel DC Singapore 7 (KDC SGP 7) is a seven-storey, purpose-built, carrier-neutral colocation data centre
12.98 miles China Mobile Tai Seng
12.98 miles Equinix Singapore SG4
The new SG4 will in the Tai Seng Industrial Estate, one of the country's five data center clusters, situated at the East of Singapore
13.02 miles STT Singapore 5
STT Singapore 5 is located in the east of Singapore with rich connectivity and abundant redundant power availability.
13.03 miles CloudInterested in this information?Contact us
13.04 miles CapitalLand: 9 Tai Seng
9 Tai Seng Drive is a 6-storey carrier neutral facility.
13.06 miles StarHub CO2 Tai Seng
13.07 miles Racks Central Singapore RC1
Located within the central Data Center zone in the heart of Singapore at Tai Seng Drive, RC1 is a carrier-class Tier 3 Internet Data Center housed just meters from a Global Switch Carrier Aggregation Data Center.
13.08 miles AIMS: 23 Tai Seng Drive
13.12 miles NeutraDC: Telin-2
13.12 miles STT Tai Seng 2
13.13 miles Global Switch Singapore Tai Seng
13.13 miles East ValleyInterested in this information?Contact us
13.14 miles NTT: Tai Seng 2
NTT's Tai Seng 2 Data Center is a purposebuilt, six-storey data center, which covers 22,000 sq ft and has connections to more than 20 carriers.
13.14 miles Telstra Singapore Tai Seng SGDS1
13.33 miles Ascenix Singapore
13.67 miles BDx Singapore SIN1
The eight-storey, 155,000-square foot standalone facility, strategically located in Paya Lebar, was built to Tier III criteria and received certification of the design documents by Uptime Institute on 4 December 2013.
13.67 miles OVH Singapore SGP-1
13.67 miles OVH: SGP2
European cloud and data center firm OVHcloud launched a new data center capacity in Singapore in 2023.
13.68 miles AIMS Singapore
The AIMS carrier neutral data centre is situated in Telstra’s Paya Lebar Data Centre (SGCS 2) and is part of the Pacnet Enabled Network (PEN), the first Pan-Asia Network-as-a-Service (NaaS) architecture
13.75 miles Epsilon: Techlink
13.76 miles Starhub CO3 Kaki Bukit
13.78 miles IT Block: Singapore SG1
IT Block Singapore - SG1 Data Center is a carrier-neutral colocation facility offering scalable digital infrastructure.
13.89 miles Visa Singapore
14.17 miles ST Telemedia Centennial Tower Singapore
14.96 miles CapitaLand: Telepark
15.05 miles Singtel Katong CLS
15.14 miles Strateq: Singapore
15.15 miles Telehouse Singapore
15.15 miles 1-Net East Singapore
15.51 miles Keppel DC Singapore 4
15.57 miles Keppel DC Singapore 3 (T27)
15.58 miles Kepple DC Singapore 2 (T25)
15.59 miles Tower TwoInterested in this information?Contact us
15.60 miles UltraInterested in this information?Contact us
15.66 miles Keppel: Floating Data Center
Keppel has started construction on a floating data center project at Loyang Offshore Supply Base in Singapore, advancing a modular near-shore infrastructure concept designed to reduce land and water constraints while supporting future digital growth.
15.67 miles STT Singapore 6
STT Singapore 6 is located in the east of Singapore, the facility is built to the highest industry standards to meet the demands of the evolving digital landscape.
15.72 miles AirTrunk Singapore SGP1
AirTrunk launched its data center (SNG1) in Loyang, eastern Singapore, in 2020, with StarHub as the anchor tenant.
15.78 miles Digital Realty Singapore Loyang 2
15.88 miles OCBC
15.92 miles PlazaInterested in this information?Contact us
15.93 miles Digital Realty Singapore Loyang
16.05 miles AirTrunk: SGP2
AirTrunk's second Singapore campus will be located in Loyang.
16.33 miles ST Engineering: Fort Data Center
ST Engineering entered Singapore's data center market in 2009 with its first facility, which operates under a partnership model where Mapletree owns the building shell while ST Engineering manages the operations.
16.87 miles Changi Cable Landing Station
16.89 miles Jurong Island DC Park
An inter-agency statement from the Jurong Town Corporation (JTC) and Singapore’s Economic Development Bureau (EDB) details plans to develop the nation's largest low-carbon Data Center Park on Jurong Island.
16.91 miles NeutraDC: Telin-1
16.98 miles HPC Data CenterInterested in this information?Contact us
17.42 miles Global Switch: Johor
Global Switch plans a data center campus in Kulai, Johor, inside the Johor-Singapore Special Economic Zone.
19.27 miles YTL: Kulai Expansion
YTL Power plans to double the size of its Green Data Center Park in Kulai, Johor.
19.41 miles YTL: JDC1
JDC1 is the first building on YTL Power's Green Data Center Park in Kulai, Johor, with Sea as anchor tenant.
19.44 miles YTL: JDC2
JDC2 is YTL Power's liquid-cooled AI building on the Green Data Center Park in Kulai, Johor.
19.46 miles YTL: JDC3
JDC3 is a colocation building on YTL Power's Green Data Center Park in Kulai, Johor.
19.49 miles YTL: JDC4
JDC4 is a colocation building under construction on YTL Power's Green Data Center Park in Kulai, Johor.
19.53 miles YTL: JDC5
JDC5 is a colocation building under construction on YTL Power's Green Data Center Park in Kulai, Johor.
19.56 miles Ridge BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.56 miles YTL: JDC6
JDC6 is a built-to-suit colocation building on YTL Power's Green Data Center Park in Kulai, Johor.
19.60 miles YTL: JDC11
JDC11 is a colocation building under construction on YTL Power's Green Data Center Park in Kulai, Johor.

Operating Company

Operated by:
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Malaysia Requires Data Centers To Source 30% Renewable Energy
Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan ...

Malaysia Requires Data Centers To Source 30% Renewable Energy

October 29, 2026 Malaysia

Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan Rakyat on October 27 that the rule applies to a data center's total capacity or its energy...

Read more
Read DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion
A seven-bank consortium has added RM15 billion, about US$3.67 billion, to [DayOne](https://baxtel.com/data-centers/dayone)'s Johor data center financing, lifting the Singapore-headquartered operato...

DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion

October 14, 2026 DayOne

A seven-bank consortium has added RM15 billion, about US$3.67 billion, to DayOne's Johor data center financing, lifting the Singapore-headquartered operator's debt platform in Malaysia's southern state to RM30 billion, or roughly US$7.3 billion. The lenders set out the upsizing in a...

Read more
Read Second Building at Edged’s Chicago Data Center Campus Topped Out
Edged Energy has topped out its latest facility at its Chicago, Illinois campus. The company said it has completed structural work on its second building at the site at 2835 Bilter Road in Aurora. ...

Second Building at Edged’s Chicago Data Center Campus Topped Out

June 05, 2026 Edge Centres

Edged Energy has topped out its latest facility at its Chicago, Illinois campus. The company said it has completed structural work on its second building at the site at 2835 Bilter Road in Aurora. The ORD01-2 data center is fully pre-leased, will deliver 72MW of capacity, and is scheduled to go...

Read more
Read Armada Raises $230M ln Latest Funding Round
Armada Raises $230M ln Latest Funding Round

Armada Raises $230M ln Latest Funding Round

May 20, 2026 Edge Centres

Armada has raised $230 million in an oversubscribed Series B round, its largest funding to date, bringing total capital to nearly $500 million. The round was co-led by Overmatch, BlackRock, and 8090 Industries, with participation from investors including Johnson Controls, NightDragon, Mitsui, and...

Read more
Read NextDC Begins Construction on 4.4MW Edge Facility in Geelong
NextDC Begins Construction on 4.4MW Edge Facility in Geelong

NextDC Begins Construction on 4.4MW Edge Facility in Geelong

April 22, 2026 Edge Centres

Australian data center firm NextDC has broken ground on a new Edge facility near Melbourne. “It's begun! Work on NextDC's GE1 4.4MW data center in Geelong has commenceIn thid, bringing new capability to the region,” Adam Gardner, head of Edge at NextDC, said on Linkedin this week.The...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.