|
0.06 miles
|
Bridge DC: MY06-1
|
The first building on Bridge Data Centres' Sedenak MY06 campus, assembled from close to 400 prefabricated modules made in China and leased to anchor tenant ByteDance.
|
|
0.14 miles
|
Bridge DC: MY06-2
|
The second building on Bridge Data Centres' Sedenak MY06 campus and its first phase to use immersion cooling, serving anchor tenant ByteDance.
|
|
0.16 miles
|
Bridge DC: MY06 Expansion
|
Further buildings that Bridge Data Centres markets for its Sedenak MY06 campus. Bridge describes MY06 as a 15-building campus; the land for the unbuilt buildings has not been located.
|
|
0.21 miles
|
Vantage: JHB13
|
JHB13 is the third planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
|
|
0.21 miles
|
Vantage: JHB12
|
JHB12 is the second planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
|
|
0.23 miles
|
Bridge DC: MY06-3
|
The third building on Bridge Data Centres' Sedenak MY06 campus, enlarged during construction for anchor tenant ByteDance.
|
|
0.25 miles
|
Vantage: JHB11
|
JHB11 is the first data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
|
|
0.32 miles
|
Princeton PDG: JH1 Bldg-2
|
This facility is part of Princeton PDG's JH1 Campus in Johor.
|
|
0.34 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Keppel DC is expanding its data center footprint in Sedenak Tech Park, on 25 acres of land.
|
|
0.35 miles
|
Princeton PDG: JH1 Bldg-1
|
Occupying 128,000 m² of land, JH1 is a carrier-neutral site featuring a design PUE of ≤1.4. The campus will consist of four buildings, the first of which successfully came online in July 2024.
https://princetondg.com/malaysia/jh1/
|
|
0.41 miles
|
K2: Kulai Expansion
|
|
|
0.41 miles
|
Keppel DC: Johor Sedenak 1
|
|
|
0.43 miles
|
Princeton PDG: JH1 Bldg-4
|
PDG has started construction of the third building of its JH1 campus.
|
|
0.45 miles
|
K2: Kulai JHR04
|
|
|
0.46 miles
|
Princeton PDG: JH1 Bldg-3
|
PDG successfully topped out the third building of its JH1 campus in late 2025.
|
|
0.48 miles
|
BrightRay: MY-03
|
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
|
|
0.50 miles
|
BrightRay: Johor MY-01
|
In 2025, Malaysian pre-fab data center specialist BrightRay officially opened its first facility in Johor.
|
|
0.54 miles
|
K2: Kulai JHR01-03
|
K2 Data Centres ("K2") is building a hyperscale data center campus at Sedenak Tech Park in Johor.
|
|
0.54 miles
|
BrightRay: MY-02
|
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
|
|
0.91 miles
|
GDC SDN: Johor SDK1
|
Global Data Centre Sdn. Bhd. (GDC) has officially broken ground on GDC-SDK1, a high density AI data center located in Johor’s Sedenak Tech Park.
|
|
8.62 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Keppel DC is building a massive data center campus on a 50-acre plot of land in Kulai, Johor.
|
|
9.32 miles
|
YTL: JDC3
|
This facility is a part of YTL's Johor campus in Malaysia.
|
|
9.35 miles
|
YTL: JDC6
|
This facility is a part of YTL's Johor campus in Malaysia.
|
|
9.35 miles
|
YTL: JDC1
|
YTL Green Data Center Park, the region's first solar-powered data center park spanning 275 acres, is located in Johor, Malaysia.
|
|
9.38 miles
|
YTL: JDC2
|
This facility is a part of YTL's Johor campus in Malaysia.
|
|
10.54 miles
|
BetaInterested in this information?Contact us
|
Microsoft has acquired 123 acres of land in Kulai, Johor, Malaysia for data center development. The plot, located in Eco Business Park VI in Senai, was purchased from EcoWorld's subsidiary for RM402.3 million ($85.2m).
|
|
13.21 miles
|
ThreeInterested in this information?Contact us
|
|
|
16.10 miles
|
EdgeInterested in this information?Contact us
|
|
|
16.77 miles
|
Global Switch: Johor
|
Global Switch plans to build a data center campus in Johor, Malaysia.
|
|
16.77 miles
|
EdgeConneX: Johor
|
EdgeConneX is building a huge data center campus in Johor, Malaysia.
|
|
16.77 miles
|
CURRENC: Johor
|
Fintech holding company CURRENC Group is venturing into data center development with a new facility in Johor, Malaysia.
|
|
19.12 miles
|
ZData: Johor
|
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
|
|
19.69 miles
|
Princeton PDG: JH2
|
PDG's JH2 data center is strategically positioned in Johor's Eco Business Park at Mukim Senai, just 30 km from the company's existing JH1 campus in Sedenak Tech Park.
|
|
19.71 miles
|
NTT: Gelang Patah
|
NTT Data aims to develop a six buildings campus on a 68.5-acre parcel of land in Gelang Patah, Johor Bahru.
|
|
19.84 miles
|
Stack: JHB01A
|
JHB01A is the first of two buildings on STACK's JHB01 campus in Iskandar Puteri, Johor: a two-storey data center with a multi-level external electrical yard, beside the campus's on-site TNB 275 kV substation. Construction began in 2025.
|
|
19.88 miles
|
Stack: JHB01B
|
JHB01B is the second building planned on STACK's JHB01 campus in Iskandar Puteri, Johor, on the east side of the lot beside JHB01A and served by the campus's on-site TNB 275 kV substation.
|