GDC SDN: Johor SDK2

Short Code: SDK2
PUE: 1.25
Utility Provider: Tenaga Nasional Berhad
Lot Size: 4 acres

GDC-SDK2 is a second AI data center that Global Data Centre, an arm of Global Telecom, proposes in Sedenak Tech Park, Johor. The design allows up to 140 kW per rack.

Map and Nearby Locations

Persiaran Digital Perdana ( Sedenak Tech Park )
Global Data Centre SDN. BHD. (GDC) Sites
Nearby Facilities

Sites within 15 miles of GDC SDN: Johor SDK2

Distance Site About
0.22 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.23 miles Keppel DC: Johor Sedenak 1
Keppel DC Johor 1 is a built-to-suit data center in Sedenak Tech Park, Johor, committed to one technology company.
0.28 miles Bridge DC: MY06-1
The first building on Bridge Data Centres' Sedenak MY06 campus, assembled from close to 400 prefabricated modules made in China and leased to anchor tenant ByteDance.
0.32 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.36 miles Bridge DC: MY06-2
The second building on Bridge Data Centres' Sedenak MY06 campus and its first phase to use immersion cooling, serving anchor tenant ByteDance.
0.36 miles Bridge DC: MY06 Expansion
Further buildings that Bridge Data Centres plans for its Sedenak MY06 campus beyond the two built clusters.
0.43 miles Bridge DC: MY06-3
The third building on Bridge Data Centres' Sedenak MY06 campus, enlarged during construction for anchor tenant ByteDance.
0.45 miles Bridge DC: MY06-4
A smaller expansion project on Bridge Data Centres' Sedenak MY06 campus, built for anchor tenant ByteDance.
0.47 miles K2: Kulai JHR01-03
JHR01, JHR02 and JHR03 are the first three buildings on K2's campus in Sedenak Tech Park, Johor.
0.55 miles K2: Kulai Expansion
K2 is developing JHR05, the next building on its campus in Sedenak Tech Park, Johor, with room for more after it.
0.57 miles Bridge DC: MY06-C2
MY06-C2 is the second built cluster on Bridge Data Centres' Sedenak MY06 campus in Kulai, Johor, with six buildings completed in 2025.
0.58 miles K2: Kulai JHR04
JHR04 is the fourth building on K2's campus in Sedenak Tech Park, Johor.
0.61 miles GDC SDN: Johor SDK1
GDC-SDK1 is an AI data center that Global Data Centre plans in Sedenak Tech Park, Kulai, Johor.
0.65 miles Princeton PDG: JH1 Bldg-2
Building 2 is one of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor.
0.67 miles Vantage: JHB12
JHB12 is the second data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor, now under construction.
0.67 miles Vantage: JHB11
JHB11 is the first data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
0.69 miles Vantage: JHB13
JHB13 is the third planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
0.69 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.73 miles Princeton PDG: JH1 Bldg-1
Building 1 is the first of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor.
0.77 miles Princeton PDG: JH1 Bldg-3
Building 3 is one of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor. It topped out in December 2025.
0.80 miles Princeton PDG: JH1 Bldg-4
Building 4 is the last of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor.
0.89 miles BrightRay: MY-03
MY-03 is the third building on BrightRay's prefabricated data center campus in Sedenak Tech Park, Johor.
0.89 miles BrightRay: Johor MY-01
MY-01 is the first building on BrightRay's prefabricated data center campus in Sedenak Tech Park, Johor.
0.95 miles BrightRay: MY-02
MY-02 is the second building on BrightRay's prefabricated data center campus in Sedenak Tech Park, Johor.
1.44 miles YTL: Sedenak Tech Park West
YTL Power and JLand plan a large data center campus at Sedenak Tech Park West in Kulai, Johor.
8.29 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.13 miles YTL: JDC11
JDC11 is a colocation building under construction on YTL Power's Green Data Center Park in Kulai, Johor.
9.15 miles YTL: JDC6
JDC6 is a built-to-suit colocation building on YTL Power's Green Data Center Park in Kulai, Johor.
9.17 miles YTL: JDC5
JDC5 is a colocation building under construction on YTL Power's Green Data Center Park in Kulai, Johor.
9.19 miles YTL: JDC4
JDC4 is a colocation building under construction on YTL Power's Green Data Center Park in Kulai, Johor.
9.20 miles YTL: JDC3
JDC3 is a colocation building on YTL Power's Green Data Center Park in Kulai, Johor.
9.22 miles YTL: JDC2
JDC2 is YTL Power's liquid-cooled AI building on the Green Data Center Park in Kulai, Johor.
9.24 miles YTL: JDC1
JDC1 is the first building on YTL Power's Green Data Center Park in Kulai, Johor, with Sea as anchor tenant.
9.38 miles YTL: Kulai Expansion
YTL Power plans to double the size of its Green Data Center Park in Kulai, Johor.
10.15 miles Princeton PDG: JH2
JH2 is Princeton Digital Group's second Johor campus, planned as five buildings at QUANTUM Edge in Kulai.
10.62 miles Plaza MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.91 miles Global Switch: Johor
Global Switch plans a data center campus in Kulai, Johor, inside the Johor-Singapore Special Economic Zone.
16.55 miles EdgeConneX: Johor
EdgeConneX plans a multi-building, AI-ready data center campus in Johor, Malaysia.
16.55 miles Fintech Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.11 miles ZData: Johor
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
19.37 miles NTT: Gelang Patah
NTT plans a six-building data center campus at Gelang Patah, Iskandar Puteri, Johor, beside Taman Nusa Bayu.
19.86 miles Stack: JHB01A
JHB01A is the first of two buildings on STACK's JHB01 campus in Iskandar Puteri, Johor: a two-storey data center with a multi-level external electrical yard, beside the campus's on-site TNB 275 kV substation. Construction began in 2025.
19.90 miles Stack: JHB01B
JHB01B is the second building planned on STACK's JHB01 campus in Iskandar Puteri, Johor, on the east side of the lot beside JHB01A and served by the campus's on-site TNB 275 kV substation.

Operating Company

Operated by:

GLOBAL DATA CENTRE SDN. BHD. (GDC) is a subsidiary of GLOBAL TELECOMMUNICATIONS SDN. BHD. GLOBALTELECOM is the premier digital infrastructures and service provider in Malaysia and Southeast Asia Region, specializing in Cloud Solutions, Data Centres, and Submarine Cable Connectivity. Through a comprehensive one-stop solution, GLOBALTELECOM provides enterprises with a gateway to both local and international markets.

The advanced data centres, strategically positioned in Cyberjaya, Johor, and Kuching, Malaysia, are equipped with cutting-edge A.I. technology and designed to meet High Performance Computing (HPC) requirements. Operating with low Power Usage Effectiveness (PUE), these facilities deliver optimal power utilization and enhanced efficiency, demonstrating GLOBALTELECOM's commitment to sustainable and high-performance digital infrastructure solutions.

0
Facilities
0
Markets

News See all

Read Malaysia Requires Data Centers To Source 30% Renewable Energy
Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan ...

Malaysia Requires Data Centers To Source 30% Renewable Energy

October 29, 2026 Malaysia

Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan Rakyat on October 27 that the rule applies to a data center's total capacity or its energy...

Read more
Read DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion
A seven-bank consortium has added RM15 billion, about US$3.67 billion, to [DayOne](https://baxtel.com/data-centers/dayone)'s Johor data center financing, lifting the Singapore-headquartered operato...

DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion

October 14, 2026 DayOne

A seven-bank consortium has added RM15 billion, about US$3.67 billion, to DayOne's Johor data center financing, lifting the Singapore-headquartered operator's debt platform in Malaysia's southern state to RM30 billion, or roughly US$7.3 billion. The lenders set out the upsizing in a...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.