0.09 miles
|
YTL: JDC5
|
JDC5 is a colocation building under construction on YTL Power's Green Data Center Park in Kulai, Johor.
|
|
0.10 miles
|
YTL: JDC3
|
JDC3 is a colocation building on YTL Power's Green Data Center Park in Kulai, Johor.
|
|
0.18 miles
|
YTL: JDC2
|
JDC2 is YTL Power's liquid-cooled AI building on the Green Data Center Park in Kulai, Johor.
|
|
0.19 miles
|
YTL: JDC6
|
JDC6 is a built-to-suit colocation building on YTL Power's Green Data Center Park in Kulai, Johor.
|
|
0.28 miles
|
YTL: JDC11
|
JDC11 is a colocation building under construction on YTL Power's Green Data Center Park in Kulai, Johor.
|
|
0.29 miles
|
YTL: JDC1
|
JDC1 is the first building on YTL Power's Green Data Center Park in Kulai, Johor, with Sea as anchor tenant.
|
|
0.33 miles
|
YTL: Kulai Expansion
|
YTL Power plans to double the size of its Green Data Center Park in Kulai, Johor.
|
|
4.67 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.58 miles
|
Global TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
5.60 miles
|
Princeton PDG: JH2
|
JH2 is Princeton Digital Group's second Johor campus, planned as five buildings at QUANTUM Edge in Kulai.
|
|
6.58 miles
|
Global Switch: Johor
|
Global Switch plans a data center campus in Kulai, Johor, inside the Johor-Singapore Special Economic Zone.
|
|
8.59 miles
|
GDC SDN: Johor SDK1
|
GDC-SDK1 is an AI data center that Global Data Centre plans in Sedenak Tech Park, Kulai, Johor.
|
|
8.71 miles
|
Bridge DC: MY06-C2
|
MY06-C2 is the second built cluster on Bridge Data Centres' Sedenak MY06 campus in Kulai, Johor, with six buildings completed in 2025.
|
|
8.85 miles
|
Princeton PDG: JH1 Bldg-4
|
Building 4 is the last of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor.
|
|
8.91 miles
|
Princeton PDG: JH1 Bldg-3
|
Building 3 is one of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor. It topped out in December 2025.
|
|
8.96 miles
|
Princeton PDG: JH1 Bldg-2
|
Building 2 is one of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor.
|
|
9.00 miles
|
Princeton PDG: JH1 Bldg-1
|
Building 1 is the first of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor.
|
|
9.19 miles
|
GDC SDN: Johor SDK2
|
GDC-SDK2 is a second AI data center that Global Data Centre proposes in Sedenak Tech Park, Kulai, Johor.
|
|
9.24 miles
|
Vantage: JHB13
|
JHB13 is the third planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
|
|
9.25 miles
|
Bridge DC: MY06-2
|
The second building on Bridge Data Centres' Sedenak MY06 campus and its first phase to use immersion cooling, serving anchor tenant ByteDance.
|
|
9.26 miles
|
Bridge DC: MY06-3
|
The third building on Bridge Data Centres' Sedenak MY06 campus, enlarged during construction for anchor tenant ByteDance.
|
|
9.29 miles
|
Bridge DC: MY06-1
|
The first building on Bridge Data Centres' Sedenak MY06 campus, assembled from close to 400 prefabricated modules made in China and leased to anchor tenant ByteDance.
|
|
9.33 miles
|
Bridge DC: MY06 Expansion
|
Further buildings that Bridge Data Centres plans for its Sedenak MY06 campus beyond the two built clusters.
|
|
9.36 miles
|
Bridge DC: MY06-4
|
A smaller expansion project on Bridge Data Centres' Sedenak MY06 campus, built for anchor tenant ByteDance.
|
|
9.37 miles
|
Vantage: JHB12
|
JHB12 is the second data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor, now under construction.
|
|
9.40 miles
|
Hub PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.41 miles
|
Keppel DC: Johor Sedenak 1
|
Keppel DC Johor 1 is a built-to-suit data center in Sedenak Tech Park, Johor, committed to one technology company.
|
|
9.44 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.48 miles
|
Vantage: JHB11
|
JHB11 is the first data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
|
|
9.57 miles
|
K2: Kulai JHR01-03
|
JHR01, JHR02 and JHR03 are the first three buildings on K2's campus in Sedenak Tech Park, Johor.
|
|
9.60 miles
|
K2: Kulai JHR04
|
JHR04 is the fourth building on K2's campus in Sedenak Tech Park, Johor.
|
|
9.68 miles
|
K2: Kulai Expansion
|
K2 is developing JHR05, the next building on its campus in Sedenak Tech Park, Johor, with room for more after it.
|
|
9.75 miles
|
BrightRay: Johor MY-01
|
MY-01 is the first building on BrightRay's prefabricated data center campus in Sedenak Tech Park, Johor.
|
|
9.80 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.83 miles
|
BrightRay: MY-03
|
MY-03 is the third building on BrightRay's prefabricated data center campus in Sedenak Tech Park, Johor.
|
|
9.85 miles
|
BrightRay: MY-02
|
MY-02 is the second building on BrightRay's prefabricated data center campus in Sedenak Tech Park, Johor.
|
|
10.15 miles
|
ZData: Johor
|
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
|
|
10.45 miles
|
NTT: Gelang Patah
|
NTT plans a six-building data center campus at Gelang Patah, Iskandar Puteri, Johor, beside Taman Nusa Bayu.
|
|
10.63 miles
|
YTL: Sedenak Tech Park West
|
YTL Power and JLand plan a large data center campus at Sedenak Tech Park West in Kulai, Johor.
|
|
11.14 miles
|
Stack: JHB01A
|
JHB01A is the first of two buildings on STACK's JHB01 campus in Iskandar Puteri, Johor: a two-storey data center with a multi-level external electrical yard, beside the campus's on-site TNB 275 kV substation. Construction began in 2025.
|
|
11.17 miles
|
Stack: JHB01B
|
JHB01B is the second building planned on STACK's JHB01 campus in Iskandar Puteri, Johor, on the east side of the lot beside JHB01A and served by the campus's on-site TNB 275 kV substation.
|
|
11.49 miles
|
AirTrunk Johor Bahru JHB1
|
AirTrunk officially commenced operations at its JHB1 data center campus in Johor in 2024.
|
|
11.68 miles
|
AirTrunk: Johor JHB2
|
AirTrunk plans to develop its second cloud and AI-ready data centre in Malaysia, named AirTrunk JHB2 located in Iskandar Puteri, Johor region
|
|
11.81 miles
|
Empyrion: Nusajaya Campus MY1
|
Empyrion Digital is expanding its pan-Asian footprint with the development of the MY1 campus in Johor, Malaysia.
|
|
11.90 miles
|
Digital Hyperspace: Johor
|
AME Elite, a Malaysian real estate company, has agreed to sell 35 acres of land in i-TechValley to Digital Hyperspace Malaysia SDN BHD for RM210.3 million ($2.5 million).
|
|
12.42 miles
|
AirTrunk: Johor JHB4
|
JHB4 is AirTrunk’s second newly announced Johor hyperscale campus and extends the company’s long-term Malaysia expansion strategy.
|
|
12.45 miles
|
AirTrunk: Johor JHB3
|
JHB3 is AirTrunk’s planned hyperscale expansion in Iskandar Puteri and represents the next stage of the company’s Johor platform growth focused on cloud and AI demand.
|
|
13.04 miles
|
Hub UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.18 miles
|
StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.23 miles
|
Digital Halo: Johor
|
Crescendo Corporation Berhad (CCB) sold a 20.46-acre industrial plot in Johor to Digital Halo Pte Ltd for RM115.87 million ($24.6 million).
|
|
13.23 miles
|
STT Johor Campus
|
The new STT Johor data centre campus will be constructed on over 22 acres of land, offering a development potential of IT power supplied by diverse substations located nearby.
|
|
13.23 miles
|
Edgnex: Johor
|
Crescendo Corporation, a Malaysian property developer, has sold 74,360 sqm (800,400 sq ft) of land in the Nusa Cemerlang Industrial Park to Data Cloud Innovation Sdn Bhd for RM120 million ($27.1m).
|
|
13.28 miles
|
Epoch Digital: Johor
|
Epoch Digital was established by Investment firm Actis in November 2022 with a defined go-to-market strategy. Its second project is a huge data center campus located in Johor, Malaysia.
|
|
13.64 miles
|
Telekom Malaysia: IPDC 2
|
IPDC Block 2 is the second of two buildings on Telekom Malaysia's Iskandar Puteri Data Centre campus in Nusajaya Tech Park, Johor.
|
|
13.64 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.68 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.68 miles
|
Telekom Malaysia: IPDC 1
|
IPDC Block 1 is the first of two buildings on Telekom Malaysia's Iskandar Puteri Data Centre campus in Nusajaya Tech Park, Johor.
|
|
13.70 miles
|
DayOne: Tanjung Kupang
|
DayOne has agreed to buy industrial land near Tanjung Kupang, Iskandar Puteri, for a data center campus.
|
|
13.78 miles
|
DayOne: NTP-A
|
NTP-A is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
|
|
13.81 miles
|
DayOne: NTP-B
|
NTP-B is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
|
|
13.84 miles
|
DayOne: NTP-C
|
NTP-C is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
|
|
13.96 miles
|
Equinix Johor JH1
|
The JH1 IBX data center is located in the Nusajaya Technology Park (NTP) within Iskandar, Johor, just 15 km away from Singapore's Tuas Checkpoint.
|
|
14.02 miles
|
Equinix: JH2
|
Equinix's JH2 data center in Johor is officially topped out and on track for a 2027 debut.
|
|
14.10 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.14 miles
|
DayOne: NTP-F
|
NTP-F is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
|
|
14.18 miles
|
DayOne: NTP-G
|
NTP-G is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
|
|
14.19 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.21 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.23 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.23 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.24 miles
|
DayOne: NTP-N
|
NTP-N is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
|
|
14.26 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.27 miles
|
DayOne: NTP-H
|
NTP-H is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
|
|
14.30 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.33 miles
|
DayOne: NTP-J
|
NTP-J is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
|
|
14.36 miles
|
DayOne: NTP-K
|
NTP-K is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
|
|
14.39 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.39 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.41 miles
|
DayOne: NTP-M
|
NTP-M is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
|
|
14.41 miles
|
DayOne: NTP-L
|
NTP-L is one of 16 data center buildings on DayOne's Nusajaya Tech Park campus in Iskandar Puteri, Johor.
|
|
14.42 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.43 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.45 miles
|
TM Nxera: Johor
|
Singtel's data center subsidiary, Nxera , and Telekom Malaysia (TM) have commenced construction on a new data center facility in Iskandar Puteri, Johor.
|
|
14.49 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.57 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.57 miles
|
Plaza ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.59 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.66 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.69 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.10 miles
|
ESR-Logos: Johor
|
The plan for a 350MW data center campus in Johor, Malaysia, by Logos and UEM Sunrise has been officially cancelled.
|
|
16.89 miles
|
Equalbase: Johor
|
Malaysian real estate firm Equalbase has acquired 64 acres in Johor's Sunway City Iskandar Puteri from Sunway Group for RM380 million ($80.4M).
|
|
19.01 miles
|
Digital Edge: Johor Campus
|
Digital Edge, an Asia Pacific data center company backed by Stonepeak, plans its first Malaysian campus in Kota Cemerlang Industrial Park, Kota Tinggi, Johor.
|
|
19.49 miles
|
EC33 Johor
|
|
|
19.62 miles
|
MSFusion Johor Campus
|
MSFusion, a subsidiary of the Singapore cloud company Megaspeed, is building an AI data center campus in Kota Cemerlang Industrial Park, Kota Tinggi, Johor.
|