YTL: Sedenak Tech Park West

Latest Podcast Sedenak Tech Park West
Land Bank
Land secured for future development
Operated by:

YTL: Sedenak Tech Park West

Utility Provider: Tenaga Nasional Berhad

YTL Power and JLand, the property arm of Johor Corporation, plan a joint data center campus at Sedenak Tech Park West in Kulai. SIPP Power, a YTL Power subsidiary, is to acquire about 145 acres, with an option on up to 400 more. YTL Power has not published a building plan or schedule.

Site History

  • August 2026: YTL Power and JLand announce the campus.

Map and Nearby Locations

Sedenak Tech Park West ( Ibrahim Technopolis )
YTL Data Centers Sites
Nearby Facilities

Sites within 15 miles of YTL: Sedenak Tech Park West

Distance Site About
0.91 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.99 miles K2: Kulai Expansion
K2 is developing JHR05, the next building on its campus in Sedenak Tech Park, Johor, with room for more after it.
1.06 miles BrightRay: MY-03
MY-03 is the third building on BrightRay's prefabricated data center campus in Sedenak Tech Park, Johor.
1.08 miles BrightRay: MY-02
MY-02 is the second building on BrightRay's prefabricated data center campus in Sedenak Tech Park, Johor.
1.10 miles K2: Kulai JHR01-03
JHR01, JHR02 and JHR03 are the first three buildings on K2's campus in Sedenak Tech Park, Johor.
1.13 miles K2: Kulai JHR04
JHR04 is the fourth building on K2's campus in Sedenak Tech Park, Johor.
1.16 miles BrightRay: Johor MY-01
MY-01 is the first building on BrightRay's prefabricated data center campus in Sedenak Tech Park, Johor.
1.21 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.22 miles Keppel DC: Johor Sedenak 1
Keppel DC Johor 1 is a built-to-suit data center in Sedenak Tech Park, Johor, committed to one technology company.
1.24 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.33 miles Vantage: JHB11
JHB11 is the first data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
1.35 miles Bridge DC: MY06-4
A smaller expansion project on Bridge Data Centres' Sedenak MY06 campus, built for anchor tenant ByteDance.
1.36 miles Bridge DC: MY06 Expansion
Further buildings that Bridge Data Centres plans for its Sedenak MY06 campus beyond the two built clusters.
1.37 miles Bridge DC: MY06-1
The first building on Bridge Data Centres' Sedenak MY06 campus, assembled from close to 400 prefabricated modules made in China and leased to anchor tenant ByteDance.
1.44 miles Bridge DC: MY06-2
The second building on Bridge Data Centres' Sedenak MY06 campus and its first phase to use immersion cooling, serving anchor tenant ByteDance.
1.44 miles Vantage: JHB12
JHB12 is the second data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor, now under construction.
1.44 miles GDC SDN: Johor SDK2
GDC-SDK2 is a second AI data center that Global Data Centre proposes in Sedenak Tech Park, Kulai, Johor.
1.45 miles Bridge DC: MY06-3
The third building on Bridge Data Centres' Sedenak MY06 campus, enlarged during construction for anchor tenant ByteDance.
1.59 miles Vantage: JHB13
JHB13 is the third planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
1.80 miles Princeton PDG: JH1 Bldg-2
Building 2 is one of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor.
1.81 miles Princeton PDG: JH1 Bldg-1
Building 1 is the first of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor.
1.89 miles Princeton PDG: JH1 Bldg-3
Building 3 is one of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor. It topped out in December 2025.
1.95 miles Princeton PDG: JH1 Bldg-4
Building 4 is the last of four buildings on Princeton Digital Group's JH1 campus in Sedenak Tech Park, Johor.
1.95 miles Bridge DC: MY06-C2
MY06-C2 is the second built cluster on Bridge Data Centres' Sedenak MY06 campus in Kulai, Johor, with six buildings completed in 2025.
2.05 miles GDC SDN: Johor SDK1
GDC-SDK1 is an AI data center that Global Data Centre plans in Sedenak Tech Park, Kulai, Johor.
9.56 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.58 miles YTL: JDC11
JDC11 is a colocation building under construction on YTL Power's Green Data Center Park in Kulai, Johor.
10.60 miles YTL: JDC6
JDC6 is a built-to-suit colocation building on YTL Power's Green Data Center Park in Kulai, Johor.
10.61 miles YTL: JDC5
JDC5 is a colocation building under construction on YTL Power's Green Data Center Park in Kulai, Johor.
10.63 miles YTL: JDC4
JDC4 is a colocation building under construction on YTL Power's Green Data Center Park in Kulai, Johor.
10.65 miles YTL: JDC3
JDC3 is a colocation building on YTL Power's Green Data Center Park in Kulai, Johor.
10.66 miles YTL: JDC2
JDC2 is YTL Power's liquid-cooled AI building on the Green Data Center Park in Kulai, Johor.
10.68 miles YTL: JDC1
JDC1 is the first building on YTL Power's Green Data Center Park in Kulai, Johor, with Sea as anchor tenant.
10.82 miles YTL: Kulai Expansion
YTL Power plans to double the size of its Green Data Center Park in Kulai, Johor.
11.38 miles Princeton PDG: JH2
JH2 is Princeton Digital Group's second Johor campus, planned as five buildings at QUANTUM Edge in Kulai.
11.87 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.19 miles Global Switch: Johor
Global Switch plans a data center campus in Kulai, Johor, inside the Johor-Singapore Special Economic Zone.
15.40 miles EdgeConneX: Johor
EdgeConneX plans a multi-building, AI-ready data center campus in Johor, Malaysia.
15.40 miles Fintech Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Malaysia Requires Data Centers To Source 30% Renewable Energy
Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan ...

Malaysia Requires Data Centers To Source 30% Renewable Energy

October 29, 2026 Malaysia

Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan Rakyat on October 27 that the rule applies to a data center's total capacity or its energy...

Read more
Read DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion
A seven-bank consortium has added RM15 billion, about US$3.67 billion, to [DayOne](https://baxtel.com/data-centers/dayone)'s Johor data center financing, lifting the Singapore-headquartered operato...

DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion

October 14, 2026 DayOne

A seven-bank consortium has added RM15 billion, about US$3.67 billion, to DayOne's Johor data center financing, lifting the Singapore-headquartered operator's debt platform in Malaysia's southern state to RM30 billion, or roughly US$7.3 billion. The lenders set out the upsizing in a...

Read more
Read YLT gains access to Dodid data center through acquisition
YLT gains access to Dodid data center through acquisition

YLT gains access to Dodid data center through acquisition

December 30, 2021 YTL Data Centers

YTL, with the acquisition of Dodid Pte Ltd, now has access to the startup’s data center based in Tagore Industrial Ave, as it expands its footprint outside of Malaysia for the first time. Dodid’s facility is a 12.5-megawatt Tier-3 hyperscale data center, spanning 39,000 square feet of space. The...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.