Princeton PDG: JH2

Planned
Future facility in planning stage
Operated by:

Princeton PDG: JH2

Year Planned: 2027

PDG's JH2 data center is strategically positioned in Johor's Eco Business Park at Mukim Senai, just 30 km from the company's existing JH1 campus in Sedenak Tech Park. This carrier-neutral facility features a versatile design optimized for both hyperscale and AI infrastructure requirements. With its prime location 36.7 km from Johor Bahru's city center, JH2 benefits from superior access through multiple major routes including the North-South Highway, Senai Highway, and Jalan Kulai-Sedenak.

Map and Nearby Locations

( Eco Business Park VI )
Princeton Digital Group Sites
Nearby Facilities

Princeton PDG: JH2 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Princeton PDG: JH2

Distance Site About
0.20 miles Tower ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.19 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.53 miles Global StationInterested in this information?Contact us
4.46 miles YTL: JDC1
YTL Green Data Center Park, the region's first solar-powered data center park spanning 275 acres, is located in Johor, Malaysia.
4.47 miles YTL: JDC2
This facility is a part of YTL's Johor campus in Malaysia.
4.52 miles YTL: JDC3
This facility is a part of YTL's Johor campus in Malaysia.
4.53 miles YTL: JDC6
This facility is a part of YTL's Johor campus in Malaysia.
8.22 miles South RidgeInterested in this information?Contact us
10.44 miles Princeton PDG: JH1 Bldg-4
PDG has started construction of the third building of its JH1 campus.
10.49 miles Princeton PDG: JH1 Bldg-3
PDG successfully topped out the third building of its JH1 campus in late 2025.
10.54 miles Princeton PDG: JH1 Bldg-2
This facility is part of Princeton PDG's JH1 Campus in Johor.
10.60 miles Princeton PDG: JH1 Bldg-1
Occupying 128,000 m² of land, JH1 is a carrier-neutral site featuring a design PUE of ≤1.4. The campus will consist of four buildings, the first of which successfully came online in July 2024. https://princetondg.com/malaysia/jh1/
10.60 miles Keppel DC: Johor Sedenak 1
10.62 miles Bridge DC: MY06-3
The third building on Bridge Data Centres' Sedenak MY06 campus, enlarged during construction for anchor tenant ByteDance.
10.62 miles Bridge DC: MY06-2
The second building on Bridge Data Centres' Sedenak MY06 campus and its first phase to use immersion cooling, serving anchor tenant ByteDance.
10.67 miles Bridge DC: MY06-1
The first building on Bridge Data Centres' Sedenak MY06 campus, assembled from close to 400 prefabricated modules made in China and leased to anchor tenant ByteDance.
10.68 miles Bridge DC: MY06 Expansion
Further buildings that Bridge Data Centres markets for its Sedenak MY06 campus, which Bridge describes as a 15-building campus.
10.72 miles Bridge DC: MY06-4
A smaller expansion project on Bridge Data Centres' Sedenak MY06 campus, built for anchor tenant ByteDance.
10.72 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.76 miles Vantage: JHB13
JHB13 is the third planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
10.80 miles K2: Kulai JHR01-03
K2 Data Centres ("K2") is building a hyperscale data center campus at Sedenak Tech Park in Johor.
10.85 miles Vantage: JHB12
JHB12 is the second planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
10.89 miles K2: Kulai JHR04
10.96 miles Vantage: JHB11
JHB11 is the first data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
10.98 miles K2: Kulai Expansion
11.19 miles BrightRay: MY-03
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
11.21 miles BrightRay: Johor MY-01
In 2025, Malaysian pre-fab data center specialist BrightRay officially opened its first facility in Johor.
11.25 miles BrightRay: MY-02
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
11.47 miles GDC SDN: Johor SDK1
Global Data Centre Sdn. Bhd. (GDC) has officially broken ground on GDC-SDK1, a high density AI data center located in Johor’s Sedenak Tech Park.
12.40 miles ZData: Johor
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
12.90 miles NTT: Gelang Patah
NTT Data aims to develop a six buildings campus on a 68.5-acre parcel of land in Gelang Patah, Johor Bahru.
13.16 miles DayOne: Kempas Tech Park
Data center operator GDS is building another data center in Kempas Lama, Johor.
13.75 miles Stack: JHB01A
JHB01A is the first of two buildings on STACK's JHB01 campus in Iskandar Puteri, Johor: a two-storey data center with a multi-level external electrical yard, beside the campus's on-site TNB 275 kV substation. Construction began in 2025.
13.76 miles Stack: JHB01B
JHB01B is the second building planned on STACK's JHB01 campus in Iskandar Puteri, Johor, on the east side of the lot beside JHB01A and served by the campus's on-site TNB 275 kV substation.
13.95 miles AirTrunk Johor Bahru JHB1
AirTrunk officially commenced operations at its JHB1 data center campus in Johor in 2024.
14.10 miles Empyrion: Nusajaya Campus MY1
Empyrion Digital is expanding its pan-Asian footprint with the development of the MY1 campus in Johor, Malaysia.
14.12 miles Digital Hyperspace: Johor
AME Elite, a Malaysian real estate company, has agreed to sell 35 acres of land in i-TechValley to Digital Hyperspace Malaysia SDN BHD for RM210.3 million ($2.5 million).
14.17 miles AirTrunk: Johor JHB2
AirTrunk plans to develop its second cloud and AI-ready data centre in Malaysia, named AirTrunk JHB2 located in Iskandar Puteri, Johor region
15.24 miles AirTrunk: Johor JHB4
JHB4 is AirTrunk’s second newly announced Johor hyperscale campus and extends the company’s long-term Malaysia expansion strategy.
15.26 miles AirTrunk: Johor JHB3
JHB3 is AirTrunk’s planned hyperscale expansion in Iskandar Puteri and represents the next stage of the company’s Johor platform growth focused on cloud and AI demand.
15.70 miles Epoch Digital: Johor
Epoch Digital was established by Investment firm Actis in November 2022 with a defined go-to-market strategy. Its second project is a huge data center campus located in Johor, Malaysia.
15.70 miles Edgnex: Johor
Crescendo Corporation, a Malaysian property developer, has sold 74,360 sqm (800,400 sq ft) of land in the Nusa Cemerlang Industrial Park to Data Cloud Innovation Sdn Bhd for RM120 million ($27.1m).
15.70 miles Core ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.70 miles Digital Halo: Johor
Crescendo Corporation Berhad (CCB) sold a 20.46-acre industrial plot in Johor to Digital Halo Pte Ltd for RM115.87 million ($24.6 million).
15.70 miles STT Johor Campus
The new STT Johor data centre campus will be constructed on over 22 acres of land, offering a development potential of IT power supplied by diverse substations located nearby.
16.25 miles Telekom Malaysia: IPDC 2
Telekom Malaysia expanded its Iskandar Puteri Core Data Centre (IPDC) Campus with a second building.
16.29 miles Telekom Malaysia: IPDC 1
Launched in 2017, IPDC has around 90,000 sq ft (8,300 sqm) of white space.
16.32 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.36 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.38 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.40 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.42 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.54 miles Digital Edge: Johor Campus
Digital Edge has entered Johor with a RM346.5 million (~$87.3 million USD) acquisition of 50 acres of freehold land in Bandar Cemerlang Industrial Park (BCIP), Kota Tinggi.
16.60 miles Equinix Johor JH1
The JH1 IBX data center is located in the Nusajaya Technology Park (NTP) within Iskandar, Johor, just 15 km away from Singapore's Tuas Checkpoint.
16.68 miles Equinix: JH2
Equinix's JH2 data center in Johor is officially topped out and on track for a 2027 debut.
16.76 miles TM Nxera: Johor
Singtel's data center subsidiary, Nxera , and Telekom Malaysia (TM) have commenced construction on a new data center facility in Iskandar Puteri, Johor.
16.86 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.88 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.91 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.92 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.98 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.98 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.01 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.06 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.09 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.76 miles MSFusion Johor Campus
The MSFusion Data Center, operated by Singapore-based cloud firm Megaspeed, is a massive hyperscale project located in the Bandar Cemerlang Industrial Park in Kota Tinggi, Johor.
17.81 miles Digital Edge: Kota Tinggi, Johor
Digital Edge, an Asia Pacific data center platform backed by Stonepeak, agreed in April 2026 to acquire freehold industrial land in the Bandar Cemerlang Industrial Park in Johor, Malaysia, for a planned data center campus. The conditional purchase remains subject to regulatory and power approvals, with completion targeted for the second half of 2027.
17.93 miles ESR-Logos: Johor
The plan for a 350MW data center campus in Johor, Malaysia, by Logos and UEM Sunrise has been officially cancelled.
19.24 miles Equalbase: Johor
Malaysian real estate firm Equalbase has acquired 64 acres in Johor's Sunway City Iskandar Puteri from Sunway Group for RM380 million ($80.4M).
19.24 miles EC33 Johor
19.94 miles Open DC JB2

Operating Company

Operated by:

Princeton Digital Group (PDG) develops and operates data centers in six key and dynamic digital economies of Asia, including China, Singapore, India, Indonesia, Malaysia, and Japan. With 20+ data centers across these six countries and counting, we accelerate the growth of cloud and AI for global hyperscalers and enterprises.

PDG is backed by Warburg Pincus, the Ontario Teacher's Pension Plan Board and Mubadala investments

0
Facilities
0
Markets

News See all

Read Malaysia Requires Data Centers To Source 30% Renewable Energy
Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan ...

Malaysia Requires Data Centers To Source 30% Renewable Energy

October 29, 2026 Malaysia

Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan Rakyat on October 27 that the rule applies to a data center's total capacity or its energy...

Read more
Read Princeton Digital Group Linked to A$1B, 100MW Sydney Data Centre
Planning documents filed with the [New South Wales](https://baxtel.com/regions/new-south-wales) government identify [Princeton Digital Group](https://baxtel.com/data-centers/princeton-digital-group...

Princeton Digital Group Linked to A$1B, 100MW Sydney Data Centre

October 26, 2026 Princeton Digital Group

Planning documents filed with the New South Wales government identify Princeton Digital Group as the client behind a 100-megawatt data centre in Sydney's southwest. The scoping report, first reported by Mingtiandi on Oct. 24, describes capital investment above A$1 billion (US$701 million). If...

Read more
Read DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion
A seven-bank consortium has added RM15 billion, about US$3.67 billion, to [DayOne](https://baxtel.com/data-centers/dayone)'s Johor data center financing, lifting the Singapore-headquartered operato...

DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion

October 14, 2026 DayOne

A seven-bank consortium has added RM15 billion, about US$3.67 billion, to DayOne's Johor data center financing, lifting the Singapore-headquartered operator's debt platform in Malaysia's southern state to RM30 billion, or roughly US$7.3 billion. The lenders set out the upsizing in a...

Read more
Read ESR Partners with Wide Creek for 80MW Incheon Facility
ESR Partners with Wide Creek for 80MW Incheon Facility

ESR Partners with Wide Creek for 80MW Incheon Facility

November 21, 2025 Princeton Digital Group

APAC real estate firm ESR this week said it was developing an 80MW data center in South Korea, in partnership with Seoul-based Wide Creek Asset Management. The facility is set to be leased to APAC data center operator Princeton Digital Group (PDG).Stuart Gibson, co-founder and co-CEO, ESR, said:...

Read more
Read PDG Secures $160m Green Loan for Mumbai Data Center
PDG Secures $160m Green Loan for Mumbai Data Center

PDG Secures $160m Green Loan for Mumbai Data Center

July 31, 2025 Princeton Digital Group

APAC data center firm Princeton Digital Group (PDG) this week announced it has secured $160 million in green loans for its MU1 data center campus in Navi Mumbai, India. The financing, provided by local financial firms Axis Bank, Kotak Mahindra Bank, and Canara Bank, will be used to fund the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.