AirTrunk Plans Second Data Center in Osaka, Japan
December 17, 2025
AirTrunk
AirTrunk officially commenced operations at its JHB1 data center campus in Johor in 2024. The facility spans 21,900 square meters (235,750 square feet) of data center space distributed across 20 data halls. The campus also includes 370 square meters (4,000 square feet) of office and storage area. The initial phase represents approximately one-third of the facility's total planned capacity.
| Distance | Site | About |
|---|---|---|
| 0.23 miles | AirTrunk: Johor JHB2 |
AirTrunk plans to develop its second cloud and AI-ready data centre in Malaysia, named AirTrunk JHB2 located in Iskandar Puteri, Johor region
|
| 0.48 miles | Stack: JHB01B |
This facility is a part of Stack Infrastructure's Johor Campus in Malaysia.
|
| 0.55 miles | Stack: Johor JHB01 |
STACK's flagship Johor Bahru campus spans 10.8 hectares and will feature two facilities totaling around 1 million square feet, designed to support cloud and AI/ML workloads.
|
| 0.59 miles | Empyrion: Nusajaya Campus MY1 |
Empyrion Digital is expanding its pan-Asian footprint with the development of the MY1 campus in Johor, Malaysia.
|
| 0.78 miles | Digital Hyperspace: Johor |
AME Elite, a Malaysian real estate company, has agreed to sell 35 acres of land in i-TechValley to Digital Hyperspace Malaysia SDN BHD for RM210.3 million ($2.5 million).
|
| 1.25 miles | NTT: Gelang Patah |
NTT Data aims to develop a six buildings campus on a 68.5-acre parcel of land in Gelang Patah, Johor Bahru.
|
| 1.59 miles | ZData: Johor |
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
|
| 1.77 miles | Digital Halo: Johor |
Crescendo Corporation Berhad (CCB) sold a 20.46-acre industrial plot in Johor to Digital Halo Pte Ltd for RM115.87 million ($24.6 million).
|
| 1.77 miles | Hyperscale Data Center Request Dataset |
Microsoft is further expanding its data center footprint in Malaysia by acquiring another plot of land in Johor.
|
| 1.77 miles | Edgnex: Johor |
Crescendo Corporation, a Malaysian property developer, has sold 74,360 sqm (800,400 sq ft) of land in the Nusa Cemerlang Industrial Park to Data Cloud Innovation Sdn Bhd for RM120 million ($27.1m).
|
| 1.77 miles | STT Johor Campus |
The new STT Johor data centre campus will be constructed on over 22 acres of land, offering a development potential of IT power supplied by diverse substations located nearby.
|
| 1.80 miles | Epoch Digital: Johor |
Epoch Digital was established by Investment firm Actis in November 2022 with a defined go-to-market strategy. Its second project is a huge data center campus located in Johor, Malaysia.
|
| 2.31 miles | IPDC 2 |
Telekom Malaysia expanded its Iskandar Puteri Core Data Centre (IPDC) Campus with a second building.
|
| 2.35 miles | Iskandar Puteri Core Data Centre (IPDC) |
Launched in 2017, IPDC has around 90,000 sq ft (8,300 sqm) of white space.
|
| 2.40 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 2.42 miles | Carrier-Neutral Data Center Request Dataset |
GDS Nusajaya Tech Park Data Center Campus, also known as GDS NTP Data Center Campus, is the first data center that GDS has launched in Southeast Asia.
|
| 2.45 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 2.47 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 2.47 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 2.67 miles | Equinix Johor JH1 |
The JH1 IBX data center is located in the Nusajaya Technology Park (NTP) within Iskandar, Johor, just 15 km away from Singapore's Tuas Checkpoint.
|
| 2.76 miles | Equinix: JH2 |
Equinix's JH2 data center in Johor is officially topped out and on track for a 2027 debut.
|
| 2.93 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 2.96 miles | Nxera: Johor |
Singtel's data center subsidiary, Nxera , and Telekom Malaysia (TM) have commenced construction on a new data center facility in Iskandar Puteri, Johor.
|
| 2.97 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 2.98 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 2.98 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 3.04 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 3.05 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 3.08 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 3.12 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 3.16 miles | Carrier-Neutral Data Center Request Dataset |
This data center building is part of DayOne's Nusajaya Tech Park Campus in Johor, Malaysia.
|
| 4.07 miles | ESR-Logos: Johor |
The plan for a 350MW data center campus in Johor, Malaysia, by Logos and UEM Sunrise has been officially cancelled.
|
| 5.41 miles | Equalbase: Johor |
Malaysian real estate firm Equalbase has acquired 64 acres in Johor's Sunway City Iskandar Puteri from Sunway Group for RM380 million ($80.4M).
|
| 5.83 miles | Hyperscale Data Center Request Dataset |
|
| 10.24 miles | Princeton PDG: JH2 |
PDG's JH2 data center is strategically positioned in Johor's Eco Business Park at Mukim Senai, just 30 km from the company's existing JH1 campus in Sedenak Tech Park.
|
| 10.81 miles | DayOne: Kempas Tech Park |
Data center operator GDS is building another data center in Kempas Lama, Johor.
|
| 11.06 miles | Singtel TUAS CLS |
|
| 11.11 miles | Nxera: DC Tuas |
|
| 11.33 miles | Hyperscale Data Center Request Dataset |
|
| 11.36 miles | Hyperscale Data Center Request Dataset | |
| 11.36 miles | Hyperscale Data Center Request Dataset | |
| 11.42 miles | EC33 Johor |
|
| 11.53 miles | YTL: JDC2 |
This facility is a part of YTL's Johor campus in Malaysia.
|
| 11.53 miles | YTL: JDC6 |
This facility is a part of YTL's Johor campus in Malaysia.
|
| 11.53 miles | Open DC JB2 | |
| 11.56 miles | YTL Johor |
YTL Green Data Center Park, the region's first solar-powered data center park spanning 275 acres, is located in Johor, Malaysia.
|
| 11.56 miles | YTL: JDC3 |
This facility is a part of YTL's Johor campus in Malaysia.
|
| 11.95 miles | Hyperscale Data Center Request Dataset | |
| 12.05 miles | ST Engineering: Jalan Boon Lay |
Singaporean multinational technology and engineering group, ST Engineering, is developing its fourth data center in Singapore's Jalan Boon Lay area.
|
| 12.15 miles | CSF: Johor CX3 |
Located in Johor, Malaysia, the CX3 data center offers 2,000 square feet of net data center space within a commercial office building.
|
| 12.15 miles | Open DC JB1 | |
| 12.19 miles | Hyperscale Data Center Request Dataset | |
| 12.33 miles | Equinix Singapore SG2 |
SG2 facility at Pioneer Walk is home to Equinix's Asia-Pacific Network Operation Centre with Internet exchange points access to one of the world's three GRX peering points.
|
| 12.34 miles | Hyperscale Data Center Request Dataset | |
| 12.62 miles | Keppel DC Singapore 5 (Kingsland) |
Kingsland Data Center was completed in Singapore in Q3 2015. The 208,000ft2, 5-storey purpose-built data center facility has 30MVA of redundant power supported by two diverse sub-stations.
|
| 12.83 miles | Equinix Singapore SG5 |
SG5 is a nine-story facility located at the Tanjong Kling data center park. At full buildout, it will offer 5,000 cabinets, with a total colocation space of close to 129,000 square feet (12,000 square meters).
|
| 12.83 miles | Hyperscale Data Center Request Dataset | |
| 12.84 miles | NeutraDC: Telin-3 |
Telin-3, a purposed built 5-storey multi-tier data centre and telecommunication hub is strategically located in the Singapore Data Centre Park (Tanjong Kling).
|
| 12.85 miles | Hyperscale Data Center Request Dataset | |
| 12.85 miles | 1-Net North Data Centre |
Constructed in 2016, the 1-Net North Data Center is a 5 story datacenter. It is located in Marsiling in northern Singapore. Situated in a low risk environment. It is specifically designed and constructed to meet the strict security guidelines of Uptime Institute and Monetary Authority of Singapore (MAS).
|
| 12.87 miles | Hyperscale Data Center Request Dataset | |
| 12.87 miles | Hyperscale Data Center Request Dataset |
Mapletree Sunview 1 is a six-storey build-to-suit (“BTS”) data centre with a gross floor area of about 242,000 square feet.
|
| 12.90 miles | Mapletree: Sunview 1 |
Mapletree Sunview 1 is a purpose-built data center completed on July 13, 2018. The six-story facility offers approximately 242,000 square feet of gross floor area and was developed as a build-to-suit (BTS) project.
|
| 13.05 miles | DayOne: Jln Buroh, Singapore |
In 2024, Chinese data center firm GDS acquired this property at 21 Jalan Buroh in Singapore from CapitaLand, with plans to convert it into a data center.
|
| 13.25 miles | Nxera: DC West |
Singtel's DC West is located in Jurong Lake District, a commercial hub outside of the Central Business District. DC West is close to the Kingsland Data Center and Telin-3 in Singapore Data Center Park (DCP.)
|
| 14.10 miles | Hyperscale Data Center Request Dataset |
Microsoft has acquired 123 acres of land in Kulai, Johor, Malaysia for data center development. The plot, located in Eco Business Park VI in Senai, was purchased from EcoWorld's subsidiary for RM402.3 million ($85.2m).
|
| 14.10 miles | Hyperscale Data Center Request Dataset | |
| 14.26 miles | NTT: Jurong |
Jurong Data Center is a 40-minute drive from Singapore Changi Airport, and a 20-minute drive from central Singapore.
|
| 14.26 miles | Colt/KVH Singapore DC1 (SGDC1) |
|
| 14.26 miles | Digital Jurong: 29A International Business Park - Digital Realty |
Digital Realty’s 7 story data centre is located in the Jurong East area of Singapore, at 29A International Business Park.
|
| 14.26 miles | Cyxtera Singapore SG2 |
|
| 14.26 miles | CyrusOne Singapore |
CryusOne is located within Digital Realty's facility at 29A International Business Park
|
| 14.26 miles | STT Jurong | |
| 14.29 miles | Hyperscale Data Center Request Dataset | |
| 14.30 miles | Princeton PDG: SG3 |
In 2024, Princeton Digital Group acquired the Yahoo data centre in western Singapore as the Warburg Pincus-backed platform continues to expand aggressively in the city-state and neighbouring territories.
|
| 14.52 miles | Global Switch Singapore Woodlands |
|
| 14.53 miles | M1 Next-Gen Singapore |
|
| 15.29 miles | Carrier-Neutral Data Center Request Dataset |
Keppel DC is building a massive data center campus on a 50-acre plot of land in Kulai, Johor.
|
| 16.46 miles | Jurong Island DC Park |
An inter-agency statement from the Jurong Town Corporation (JTC) and Singapore’s Economic Development Bureau (EDB) details plans to develop the nation's largest low-carbon Data Center Park on Jurong Island.
|
| 16.76 miles | Nova Complex: IMS-GT Cluster |
Nova Complex, an infrastructure development firm based in Singapore, plans to establish IMS-GT Cluster (Indonesia-Malaysia-Singapore Growth Triangle) in Singapore.
|
| 16.80 miles | StarHub North Point Yishun | |
| 16.93 miles | Empyrion (DoDid) Singapore |
In 2021, Empyrion acquired the site and Dodid Pte Ltd.
|
| 16.96 miles | YTL: Singapore |
In 2021, YTL Power International Berhad ("YTL Power”), through its subsidiary YTL Data Center Holdings Pte. Ltd. (“YTL DC”), completed the acquisition of Dodid Pte. Ltd. ("Dodid”), owner of this Tier-3 data center in Singapore.
|
| 16.99 miles | NUS Computer Centre | |
| 17.75 miles | NUS Prince George's Park |
|
| 17.98 miles | Equinix Singapore SG3 |
Equinix SG3 is a 7 story, purpose-built facility is constructed in a flood- and earthquake-free zone and connects to the carrier dense SG1 facility via dark fiber. Together SG1 and SG3 form a virtual campus in One-North.
|
| 18.00 miles | Equinix Singapore SG1 |
|
| 18.00 miles | Internap Singapore: 20 Ayer Rajah Crescent | |
| 18.12 miles | Bridge: Johor MY07 |
Bridge Data Centres has reached a significant power agreement with Tenaga Nasional Berhad (TNB), securing 400 megawatts of electricity for its new hyperscale facility in Johor, Malaysia.
|
| 18.15 miles | ST Engineering Digital Hub |
The ST Engineering Digital Hub serves as the third secure data facility in Singapore for ST Engineering, a Singaporean multinational technology and engineering group.
|
| 18.20 miles | StarHub Cable Vision | |
| 18.22 miles | MSFusion Johor Campus |
The MSFusion Data Center, operated by Singapore-based cloud firm Megaspeed, is a massive hyperscale project located in the Bandar Cemerlang Industrial Park in Kota Tinggi, Johor.
|
| 18.23 miles | ST Engineering Hub |
The ST Engineering Hub serves as the second secure data facility in Singapore for ST Engineering, a Singaporean multinational technology and engineering group.
|
| 18.25 miles | Citigroup Singapore |
|
| 18.25 miles | CINTECH II (Singapore Science Park I) |
CINTECH II is a three-storey development ideal for companies in infocomm technology, product design & development, R&D engineering and back-end business operations.
|
| 18.27 miles | STT Singapore 4 |
STT MediaHub is close to Equinix's SG1 and has access to the dense network ecosystem at SG1.
|
| 18.76 miles | StarHub Ang Mo Kio | |
| 19.65 miles | Bridge: Plentong |
Bridge Data Centres has expanded its presence in Johor Bahru through two land acquisitions from Paragon Globe Bhd.
|
| 19.84 miles | Princeton PDG: JH1 Bldg-3 |
PDG successfully topped out the third building of its JH1 campus in late 2025.
|
| 19.84 miles | Princeton PDG: JH1 Bldg-4 |
PDG has started construction of the third building of its JH1 campus.
|
| 19.96 miles | Princeton PDG: JH1 Bldg-2 |
This facility is part of Princeton PDG's JH1 Campus in Johor.
|
| 19.97 miles | Princeton PDG: JH1 Campus |
Occupying 128,000 m² of land, JH1 is a carrier-neutral site featuring a design PUE of ≤1.4. The campus will consist of four buildings, the first of which successfully came online in July 2024.
https://princetondg.com/malaysia/jh1/
|
| 20.00 miles | 1AsiaCom New Tech Park |
1Asia Data Centre located in the telecom building in Singapore which is known as New Tech Park.
|
| 20.00 miles | Epsilon Singapore New Tech Park |
|
AirTrunk is an Australian hyperscale data centre specialist creating a platform for cloud, content and large enterprise customers across the Asia-Pacific region. The company develops and operates data centre campuses with industry-leading reliability, technology innovation and energy efficiency.
December 17, 2025
AirTrunk
August 01, 2023
AirTrunk
June 28, 2023
AirTrunk
March 15, 2023
AirTrunk
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas