Carrier-Neutral Data CenterInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Johor, Malaysia
Under ConstructionPlanned
Multi-phase construction project
Operated by: Carrier-Neutral OperatorInterested in this information?Contact us

Carrier-Neutral Data Center

Year Planned: 2026
PUE: 1.3
Lot Size: 25 acres

Keppel DC is expanding its data center footprint in Sedenak Tech Park, on 25 acres of land.

Map and Nearby Locations

This Facility ( No 21, Jalan Digital 7, Bukit Batu, 81000 Kulai )
Carrier-Neutral OperatorInterested in this information?Contact us Sites
Nearby Facilities

Carrier-Neutral Data CenterInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Carrier-Neutral Data CenterInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Keppel DC: Johor Sedenak 1
NN milesInterested in this information?Contact us Bridge DC: MY06-3
The third building on Bridge Data Centres' Sedenak MY06 campus, enlarged during construction for anchor tenant ByteDance.
NN milesInterested in this information?Contact us K2: Kulai JHR04
NN milesInterested in this information?Contact us Bridge DC: MY06 Expansion
Further buildings that Bridge Data Centres markets for its Sedenak MY06 campus, which Bridge describes as a 15-building campus.
NN milesInterested in this information?Contact us K2: Kulai JHR01-03
K2 Data Centres ("K2") is building a hyperscale data center campus at Sedenak Tech Park in Johor.
NN milesInterested in this information?Contact us Bridge DC: MY06-2
The second building on Bridge Data Centres' Sedenak MY06 campus and its first phase to use immersion cooling, serving anchor tenant ByteDance.
NN milesInterested in this information?Contact us K2: Kulai Expansion
NN milesInterested in this information?Contact us Bridge DC: MY06-1
The first building on Bridge Data Centres' Sedenak MY06 campus, assembled from close to 400 prefabricated modules made in China and leased to anchor tenant ByteDance.

Operating Company

Operated by: Carrier-Neutral OperatorInterested in this information?Contact us
This operator's profile is available on request. Full company details, market presence, portfolio scale, and operating history are available to subscribers with unblurred access. Contact us to unlock the complete operator profile for this facility and every other location in their footprint.Interested in this information?Contact us
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Malaysia Requires Data Centers To Source 30% Renewable Energy
Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan ...

Malaysia Requires Data Centers To Source 30% Renewable Energy

October 29, 2026 Malaysia

Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan Rakyat on October 27 that the rule applies to a data center's total capacity or its energy...

Read more
Read DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion
A seven-bank consortium has added RM15 billion, about US$3.67 billion, to [DayOne](https://baxtel.com/data-centers/dayone)'s Johor data center financing, lifting the Singapore-headquartered operato...

DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion

October 14, 2026 DayOne

A seven-bank consortium has added RM15 billion, about US$3.67 billion, to DayOne's Johor data center financing, lifting the Singapore-headquartered operator's debt platform in Malaysia's southern state to RM30 billion, or roughly US$7.3 billion. The lenders set out the upsizing in a joint...

Read more
Read Keppel Plans 60MW Data Center in Seoul as It Expands Into South Korea
Singapore-based real estate investor Keppel will develop a 60MW greenfield data center in Ansan, near Seoul, marking its entry into South Korea’s data center market. The project will be developed t...

Keppel Plans 60MW Data Center in Seoul as It Expands Into South Korea

June 09, 2026 Keppel Data Center REIT

Singapore-based real estate investor Keppel will develop a 60MW greenfield data center in Ansan, near Seoul, marking its entry into South Korea’s data center market. The project will be developed through Keppel Data Centre Fund III (KDCF III), which has acquired a majority stake in the vehicle...

Read more
Read Keppel secures rights to 720MW data center campus outside Melbourne, Australia
Keppel secures rights to 720MW data center campus outside Melbourne, Australia

Keppel secures rights to 720MW data center campus outside Melbourne, Australia

January 16, 2026 Keppel Data Center REIT

Keppel this week said its Connectivity Division has secured the rights to lease a 123-hectare contiguous site near Morwell, Victoria, with a gross power capacity of up to 720MW, from Australian energy and infrastructure landowner Lightwood Group.Manjot Singh Mann, CEO of Connectivity, Keppel,...

Read more
Read Keppel Secures 10-year Land Lease Extension for Singapore
Keppel Secures 10-year Land Lease Extension for Singapore

Keppel Secures 10-year Land Lease Extension for Singapore

January 08, 2026 Keppel Data Center REIT

Keppel has secured a land lease extension for a data center campus in Singapore. The company last year announced that the relevant authorities had granted conditional approval for a 10-year land tenure lease extension for the Keppel Data Centre Campus at Genting Lane in Singapore.Keppel said the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?