Bridge DC: MY06-C2

Latest Podcast Persiaran Digital Perdana, Sedenak Tech Park
Under ConstructionOperational
Fully operational with expansion in progress
Operated by:

Bridge DC: MY06-C2

Short Code: MY06-C2
Site was first built in 2025 and has expansions through 2027
PUE: 1.19
Utility Provider: Tenaga Nasional Berhad
░░░░░ Request Dataset MW
Operational Power

MY06-C2 is the second built cluster on Bridge Data Centres' MY06 campus in Sedenak Tech Park, Kulai, about 900 metres south-east of the first four buildings. It holds six data center buildings and its own substation on Persiaran Digital Perdana. CSCEC Installation was a main contractor.

Site History

  • June 2025: Buildings B5 and B6 pass government acceptance, which completes the contractor's work on the campus.

Map and Nearby Locations

Persiaran Digital Perdana, Sedenak Tech Park
Bridge Data Centres Sites
Nearby Facilities

Bridge DC: MY06-C2 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Bridge DC: MY06-C2

Distance Site About
0.36 miles Princeton PDG: JH1 Bldg-4
PDG has started construction of the third building of its JH1 campus.
0.43 miles Princeton PDG: JH1 Bldg-2
This facility is part of Princeton PDG's JH1 Campus in Johor.
0.44 miles Princeton PDG: JH1 Bldg-3
PDG successfully topped out the third building of its JH1 campus in late 2025.
0.51 miles Princeton PDG: JH1 Bldg-1
Occupying 128,000 m² of land, JH1 is a carrier-neutral site featuring a design PUE of ≤1.4. The campus will consist of four buildings, the first of which successfully came online in July 2024. https://princetondg.com/malaysia/jh1/
0.54 miles Bridge DC: MY06-2
The second building on Bridge Data Centres' Sedenak MY06 campus and its first phase to use immersion cooling, serving anchor tenant ByteDance.
0.56 miles Bridge DC: MY06-3
The third building on Bridge Data Centres' Sedenak MY06 campus, enlarged during construction for anchor tenant ByteDance.
0.58 miles Bridge DC: MY06-1
The first building on Bridge Data Centres' Sedenak MY06 campus, assembled from close to 400 prefabricated modules made in China and leased to anchor tenant ByteDance.
0.61 miles Bridge DC: MY06 Expansion
Further buildings that Bridge Data Centres plans for its Sedenak MY06 campus beyond the two built clusters.
0.63 miles Vantage: JHB13
JHB13 is the third planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
0.66 miles Bridge DC: MY06-4
A smaller expansion project on Bridge Data Centres' Sedenak MY06 campus, built for anchor tenant ByteDance.
0.69 miles Keppel DC: Johor Sedenak 1
0.73 miles Vantage: JHB12
JHB12 is the second data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor, now under construction.
0.73 miles Valley MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.74 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.81 miles Vantage: JHB11
JHB11 is the first data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
0.92 miles K2: Kulai JHR04
0.92 miles K2: Kulai JHR01-03
K2 Data Centres ("K2") is building a hyperscale data center campus at Sedenak Tech Park in Johor.
0.94 miles K2: Kulai Expansion
1.07 miles BrightRay: MY-03
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
1.10 miles BrightRay: Johor MY-01
In 2025, Malaysian pre-fab data center specialist BrightRay officially opened its first facility in Johor.
1.13 miles BrightRay: MY-02
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
1.48 miles GDC SDN: Johor SDK1
Global Data Centre Sdn. Bhd. (GDC) has officially broken ground on GDC-SDK1, a high density AI data center located in Johor’s Sedenak Tech Park.
8.05 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.74 miles YTL: JDC3
This facility is a part of YTL's Johor campus in Malaysia.
8.77 miles YTL: JDC6
This facility is a part of YTL's Johor campus in Malaysia.
8.77 miles YTL: JDC1
YTL Green Data Center Park, the region's first solar-powered data center park spanning 275 acres, is located in Johor, Malaysia.
8.80 miles YTL: JDC2
This facility is a part of YTL's Johor campus in Malaysia.
10.13 miles Princeton PDG: JH2
PDG's JH2 data center is strategically positioned in Johor's Eco Business Park at Mukim Senai, just 30 km from the company's existing JH1 campus in Sedenak Tech Park.
10.39 miles Hub PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.12 miles Global Switch: Johor
Global Switch plans to build a data center campus in Johor, Malaysia.
17.12 miles CURRENC: Johor
Fintech holding company CURRENC Group is venturing into data center development with a new facility in Johor, Malaysia.
17.12 miles EdgeConneX: Johor
EdgeConneX is building a huge data center campus in Johor, Malaysia.
18.59 miles ZData: Johor
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
19.18 miles NTT: Gelang Patah
NTT Data aims to develop a six buildings campus on a 68.5-acre parcel of land in Gelang Patah, Johor Bahru.
19.32 miles Stack: JHB01A
JHB01A is the first of two buildings on STACK's JHB01 campus in Iskandar Puteri, Johor: a two-storey data center with a multi-level external electrical yard, beside the campus's on-site TNB 275 kV substation. Construction began in 2025.
19.37 miles Stack: JHB01B
JHB01B is the second building planned on STACK's JHB01 campus in Iskandar Puteri, Johor, on the east side of the lot beside JHB01A and served by the campus's on-site TNB 275 kV substation.
19.75 miles AirTrunk Johor Bahru JHB1
AirTrunk officially commenced operations at its JHB1 data center campus in Johor in 2024.
19.92 miles AirTrunk: Johor JHB2
AirTrunk plans to develop its second cloud and AI-ready data centre in Malaysia, named AirTrunk JHB2 located in Iskandar Puteri, Johor region

Operating Company

Operated by:

Bain Capital merged ChinData with Bridge Data Centres in 2019; the combined company operates as ChinData within China and Bridge across the rest of Asia.

Bridge History

Bridge Data Centres Malaysia Sdn Bhd (formerly known as CSF CX Sdn Bhd) was incorporated on 27 September 2007. Bridge Data Centres Malaysia Sdn Bhd was acquired by Bridge Data Centres Malaysia Holdings Sdn Bhd in November 2017, which in turn is a wholly owned subsidiary of BDC (Malaysia) Holdco Pte. Ltd, Bridge Data Centres is founded by Michael Foust and Kris Kumar who collectively have more than 50 years experience investing in, conceptualizing, designing, building and operating high quality data centre facilities, with best-in-class operating and maintenance procedures to ensure the highest level of uptime and reliability. (Source: Bridge Data Centres About Us)

0
Facilities
0
Markets

News See all

Read Malaysia Requires Data Centers To Source 30% Renewable Energy
Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan ...

Malaysia Requires Data Centers To Source 30% Renewable Energy

October 29, 2026 Malaysia

Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan Rakyat on October 27 that the rule applies to a data center's total capacity or its energy...

Read more
Read DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion
A seven-bank consortium has added RM15 billion, about US$3.67 billion, to [DayOne](https://baxtel.com/data-centers/dayone)'s Johor data center financing, lifting the Singapore-headquartered operato...

DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion

October 14, 2026 DayOne

A seven-bank consortium has added RM15 billion, about US$3.67 billion, to DayOne's Johor data center financing, lifting the Singapore-headquartered operator's debt platform in Malaysia's southern state to RM30 billion, or roughly US$7.3 billion. The lenders set out the upsizing in a...

Read more
Read Bridge Data Centres in Discussions Over $6bn Loan
 Bridge Data Centres in Discussions Over $6bn Loan

Bridge Data Centres in Discussions Over $6bn Loan

March 23, 2026 Bridge Data Centres

Bridge Data Centres, owned by Bain Capital, is reportedly pursuing a loan of up to $6 billion. Bloomberg, citing people familiar with the matter, said the company is in discussions with lenders to finance its planned expansion in Thailand.The company’s QHI01 data center in Bangkok broke ground in...

Read more
Read Bridge Data Centres Plans $2.3B–$4B Investment in Singapore’s Digital Infrastructure
Bridge Data Centres Plans $2.3B–$4B Investment in Singapore’s Digital Infrastructure

Bridge Data Centres Plans $2.3B–$4B Investment in Singapore’s Digital Infrastructure

March 13, 2026 Bridge Data Centres

Bridge Data Centres plans to invest S$3–5 billion ($2.3–4 billion) in Singapore’s next-generation digital infrastructure.In an announcement, the company said it is “uniquely positioned to support hyperscaler customers and global technology companies seeking high-performance, sustainable and...

Read more
Read Bridge DC Secures 'Sustainable' Water Supply for Upcoming Thailand Facility
Bridge DC Secures 'Sustainable' Water Supply for Upcoming Thailand Facility

Bridge DC Secures 'Sustainable' Water Supply for Upcoming Thailand Facility

October 17, 2025 Bridge Data Centres

APAC data center developer Bridge Data Centres (BDC) has signed an industrial water purchase agreement with Thai utility Eastwater Stecon Utilities Co (EWS) for ‘sustainable’ water supply for its under-construction hyperscale data center campus in Chonburi Province, Thailand.Eric Fan, CEO, Bridge...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.