0.12 miles
|
CyrusOne: Broadlands Boulevard 1
|
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
|
|
1.02 miles
|
Compass Loudoun County
|
|
|
1.54 miles
|
Luck Stone: Ashburn Expansion
|
|
|
1.62 miles
|
Edge CampusInterested in this information?Contact us
|
|
|
1.65 miles
|
Luck Stone: Ashburn 1
|
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
|
|
1.80 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
1.86 miles
|
Farkas Family: Leesburg, VA
|
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
|
|
1.86 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
1.89 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
2.01 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
2.09 miles
|
Valley UltraInterested in this information?Contact us
|
The campus consists of five buildings, with a total of 1.9 million-square-feet.
|
|
2.16 miles
|
JK Land: Greenlin Park 1
|
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
|
|
2.31 miles
|
JK Land: Greenlin Expansion
|
|
|
2.40 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
|
2.52 miles
|
DataBank Ashburn IAD4
|
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
|
|
2.52 miles
|
DataBank Ashburn IAD3
|
|
|
2.57 miles
|
JK Land: Cross Mill Center
|
A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved.
|
|
2.59 miles
|
Regency DC Campus Ashburn
|
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
|
|
2.59 miles
|
FastServ Ashburn
|
|
|
2.60 miles
|
DataBank Ashburn IAD1
|
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
|
|
2.60 miles
|
DataCanopy: Ashburn 1
|
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
|
|
2.72 miles
|
Sabey Intergate: Ashburn Bldg-B
|
|
|
2.76 miles
|
Sabey Intergate: Ashburn Bldg-C
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
|
2.78 miles
|
NTT: VA8
|
|
|
2.79 miles
|
SDC Capital: Twin Creeks
|
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
|
|
2.80 miles
|
Hub PlusInterested in this information?Contact us
|
Amazon plans to build another data center in Loudoun County.
|
|
2.82 miles
|
South ValleyInterested in this information?Contact us
|
|
|
2.85 miles
|
43790 Devin Shafron (Bldg E)
|
|
|
2.86 miles
|
Sabey Intergate: Ashburn Bldg-A
|
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
|
|
2.87 miles
|
GlobalInterested in this information?Contact us
|
|
|
2.87 miles
|
43791 Devin Shafron (Bldg D)
|
|
|
2.88 miles
|
NTT: VA9
|
|
|
2.90 miles
|
Active Infra: Spring Valley Expansion
|
|
|
2.92 miles
|
Belmont Innovation Campus
|
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
|
|
2.93 miles
|
43830 Devin Shafron (Bldg F)
|
|
|
2.93 miles
|
Deft: DRT-IAD1
|
|
|
2.93 miles
|
North ValleyInterested in this information?Contact us
|
|
|
2.93 miles
|
NTT VA4
|
|
|
2.94 miles
|
NTT VA5
|
|
|
2.96 miles
|
NTT: VA6
|
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
|
|
2.97 miles
|
43831 Devin Shafron (Bldg C)
|
|
|
3.00 miles
|
Equinix DC13
|
|
|
3.02 miles
|
CloudHQ: LC5
|
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
|
|
3.04 miles
|
CloudHQ: LC11
|
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
3.07 miles
|
43881 Devin Shafron (Bldg B)
|
|
|
3.07 miles
|
Aligned: IAD-02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
|
3.08 miles
|
NTT: VA7
|
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
|
|
3.08 miles
|
CloudHQ: LC12
|
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
3.10 miles
|
43915 Devin Shafron (Bldg A)
|
|
|
3.11 miles
|
CloudHQ: LC14
|
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
3.12 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
|
3.13 miles
|
Tuscarora Crossing Campus
|
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
|
|
3.15 miles
|
CloudHQ: LC13
|
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
3.16 miles
|
Active Infra: Spring Valley 1
|
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
|
|
3.16 miles
|
South PointInterested in this information?Contact us
|
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
|
3.16 miles
|
Aligned: IAD-01
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
|
3.20 miles
|
ProInterested in this information?Contact us
|
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
|
3.23 miles
|
Quantum Connect: Ashburn, VA
|
A data center is under construction at the Quantum business park in Ashburn, Virginia.
|
|
3.24 miles
|
JK Land: Freedom Trail Rd
|
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
|
|
3.25 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
|
3.25 miles
|
Vantage: VA32
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.26 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
|
3.29 miles
|
Vantage: VA33
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.30 miles
|
ThreeInterested in this information?Contact us
|
|
|
3.34 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
|
3.35 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
|
3.38 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
|
3.38 miles
|
Rackspace Ashburn IAD3
|
|
|
3.38 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
3.39 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
|
3.39 miles
|
Vantage: VA31
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
|
3.39 miles
|
JK Land: Ashburn
|
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
|
|
3.42 miles
|
Vantage: VA35
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.42 miles
|
44521 Hastings (ACC5) Digital Realty
|
|
|
3.45 miles
|
44372 Round Table: Digital Realty
|
|
|
3.45 miles
|
CloudHQ: LC10
|
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
3.46 miles
|
Vantage: VA37
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.47 miles
|
Vantage: VA34
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.48 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
|
3.49 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
3.50 miles
|
44470 Chillum - Digital Realty
|
|
|
3.51 miles
|
44274 Round Table (Bldg L)
|
|
|
3.51 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
|
3.52 miles
|
CloudHQ: LC4
|
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
|
|
3.52 miles
|
West StationInterested in this information?Contact us
|
|
|
3.54 miles
|
Vantage: VA36
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
3.56 miles
|
Equinix Ashburn DC4
|
|
|
3.58 miles
|
CloudHQ: LC9
|
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
3.58 miles
|
QTS Ashburn-Shellhorn DC1
|
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
|
|
3.58 miles
|
44490 Chilum (ACC2): Digital Realty
|
|
|
3.59 miles
|
North TowerInterested in this information?Contact us
|
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
|
3.59 miles
|
WestInterested in this information?Contact us
|
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
|
3.59 miles
|
Hub UltraInterested in this information?Contact us
|
|
|
3.60 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
|
3.60 miles
|
Equinix Ashburn DC5
|
|
|
3.61 miles
|
QTS Ashburn-Shellhorn DC2
|
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
|
|
3.63 miles
|
CloudHQ: LC1A
|
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
|
|
3.63 miles
|
Tower BetaInterested in this information?Contact us
|
|
|
3.64 miles
|
Cologix: ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
|
3.65 miles
|
CloudHQ LC2
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
3.65 miles
|
NTT VA2
|
|
|
3.68 miles
|
Equinix Ashburn DC1
|
|
|
3.68 miles
|
Lumen Ashburn
|
|
|
3.69 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
|
3.71 miles
|
Cologix: ASH2
|
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
|
|
3.71 miles
|
Lightedge: Ashburn
|
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
|
|
3.72 miles
|
SDC: Import Plaza A
|
Building A is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2021 and leased to Amazon Web Services as IAD-161.
|
|
3.73 miles
|
Center ProInterested in this information?Contact us
|
IAD-161 is an Amazon Web Services data center in SDC Capital Partners' Import Plaza Building A at 44254 Import Plaza in Ashburn, Virginia.
|
|
3.73 miles
|
CloudHQ: LC1B
|
|
|
3.73 miles
|
CloudHQ: LC8
|
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
|
|
3.76 miles
|
CloudHQ: LC3
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
3.76 miles
|
Equinix Ashburn DC11
|
|
|
3.76 miles
|
Equinix Ashburn DC6
|
|
|
3.77 miles
|
Springfield East: Leesburg, VA
|
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
|
|
3.81 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
|
3.82 miles
|
DataCanopy: Ashburn 2
|
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
|
|
3.84 miles
|
SDC: Import Plaza B
|
Building B is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2022 and leased to Amazon Web Services as IAD-162.
|
|
3.84 miles
|
Central ValleyInterested in this information?Contact us
|
IAD-162 is an Amazon Web Services data center in SDC Capital Partners' Import Plaza Building B at 44305 Import Plaza in Ashburn, Virginia.
|
|
3.85 miles
|
Hub ProInterested in this information?Contact us
|
|
|
3.87 miles
|
Equinix: DC17
|
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
|
|
3.88 miles
|
Cologix: Ashburn Expansion (Beaumeade Circle)
|
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
|
|
3.89 miles
|
Equinix: DC18
|
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
|
|
3.89 miles
|
Digital Realty: IAD-56
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
|
3.89 miles
|
Park ThreeInterested in this information?Contact us
|
IAD-606 is an Amazon Web Services support building in SDC Capital Partners' Import Plaza Building C at 44351 Import Plaza in Ashburn, Virginia.
|
|
3.89 miles
|
SDC: Import Plaza C
|
Building C is a single-story, 14,160 sq ft support building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, leased to Amazon Web Services as IAD-606.
|
|
3.89 miles
|
Stack: NVA06B
|
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
|
3.91 miles
|
44751 Round Table (Bldg P)
|
|
|
3.91 miles
|
SDC: Import Plaza D
|
Building D is a planned 20,000 sq ft server storage building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, approved by Loudoun County in June 2026.
|
|
3.91 miles
|
Edge StationInterested in this information?Contact us
|
IAD-611 is a planned Amazon Web Services server storage building in SDC Capital Partners' Import Plaza Building D at 44360 Import Plaza in Ashburn, Virginia.
|
|
3.91 miles
|
Centersquare: Ashburn WDC1
|
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
|
|
3.93 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
3.94 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
3.94 miles
|
Equinix DC16
|
|
|
3.94 miles
|
Digital Realty: 21561 Beaumeade Cir
|
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
|
|
3.98 miles
|
Valley BetaInterested in this information?Contact us
|
|
|
4.00 miles
|
HubInterested in this information?Contact us
|
|
|
4.02 miles
|
Point UltraInterested in this information?Contact us
|
Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
|
|
4.02 miles
|
StationInterested in this information?Contact us
|
|
|
4.03 miles
|
Equinix: DC22
|
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
|
|
4.03 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
|
4.05 miles
|
CenterInterested in this information?Contact us
|
Amazon completed its $427.3 million acquisition of GWU’s 122-acre Ashburn campus to build the Bridgefield Tech Center, featuring four two-story data centers totaling 800,000 square feet alongside three parking structures.
|
|
4.05 miles
|
Stack: NVA06A
|
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
|
4.05 miles
|
Park AlphaInterested in this information?Contact us
|
IAD-299 is a planned Amazon Web Services data center in STACK Infrastructure's NVA04C building at 22295 Lockridge Road in Sterling, Virginia.
|
|
4.05 miles
|
Stack: NVA04C
|
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
|
|
4.05 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
4.06 miles
|
Equinix DC21
|
|
|
4.06 miles
|
Center PrimeInterested in this information?Contact us
|
This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
|
|
4.07 miles
|
Equinix DC15
|
|
|
4.08 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
|
4.08 miles
|
Central PlazaInterested in this information?Contact us
|
|
|
4.08 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
4.08 miles
|
PowerHouse ABX1
|
|
|
4.10 miles
|
Cyrusone: Beaumeade Circle
|
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
|
|
4.10 miles
|
Stack: NVA04B
|
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
|
|
4.10 miles
|
Point MaxInterested in this information?Contact us
|
IAD-286 is an Amazon Web Services data center in STACK Infrastructure's NVA04B building at 22285 Lockridge Road in Sterling, Virginia.
|
|
4.14 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
|
4.15 miles
|
Stack: NVA04A
|
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
|
|
4.15 miles
|
Central CampusInterested in this information?Contact us
|
IAD-285 is an Amazon Web Services data center in STACK Infrastructure's NVA04A building at 22275 Lockridge Road in Sterling, Virginia.
|
|
4.26 miles
|
SDC: Low Latency Lane 2
|
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
|
|
4.32 miles
|
SDC: Low Latency Lane 1
|
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
|
|
4.34 miles
|
Washington Commanders: Ashburn, VA
|
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
|
|
4.38 miles
|
SDC: Low Latency Lane Expansion
|
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.
|
|
4.42 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
|
4.42 miles
|
Digital Realty: IAD43
|
|
|
4.44 miles
|
Digital Realty: Broderick Drive
|
|
|
4.48 miles
|
QTS: ASH2 DC2
|
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
|
|
4.53 miles
|
QTS: ASH2 DC1
|
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
|
|
4.57 miles
|
PowerHouse: Pacific Bldg C
|
PowerHouse Pacific Building C is a three-story, 352,000 sq ft hyperscale data center shell under construction at 22279 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
|
|
4.57 miles
|
Dulles 28 Centre Motorplex
|
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
|
|
4.63 miles
|
PowerHouse: Pacific Bldg A
|
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.
|
|
4.64 miles
|
PowerHouse: Pacific Bldg B
|
PowerHouse Pacific Building B is a three-story, 354,000 sq ft hyperscale data center shell under construction at 22214 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
|
|
4.65 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
|
4.67 miles
|
Dulles 28 Technology Park
|
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
|
|
4.67 miles
|
Center MaxInterested in this information?Contact us
|
|
|
4.69 miles
|
21641 Charles View
|
|
|
4.71 miles
|
21710 Charles View
|
|
|
4.71 miles
|
Center TwoInterested in this information?Contact us
|
|
|
4.72 miles
|
GammaInterested in this information?Contact us
|
|
|
4.81 miles
|
Ridge UltraInterested in this information?Contact us
|
|
|
4.85 miles
|
DataCanopy: Sterling, VA
|
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
|
|
4.85 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
|
4.86 miles
|
Menlo: MD-DC2 (Sterling)
|
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
|
|
4.89 miles
|
CyrusOne: NVA7
|
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
|
|
4.89 miles
|
Tower ProInterested in this information?Contact us
|
|
|
4.90 miles
|
CyrusOne: NVA5
|
|
|
4.91 miles
|
Corscale: Kincora
|
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
|
|
4.91 miles
|
Center MaxInterested in this information?Contact us
|
Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
|
|
4.91 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
|
4.94 miles
|
Paragon Park Lot 3B
|
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
|
|
4.95 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
|
|
4.97 miles
|
Edge PlazaInterested in this information?Contact us
|
|
|
4.98 miles
|
Point MaxInterested in this information?Contact us
|
|
|
4.98 miles
|
Vantage VA13
|
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
|
|
4.99 miles
|
Campus UltraInterested in this information?Contact us
|
|
|
5.02 miles
|
Vantage VA15
|
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
|
|
5.03 miles
|
Stack: Loudoun 2
|
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
5.03 miles
|
Core CampusInterested in this information?Contact us
|
|
|
5.03 miles
|
ValleyInterested in this information?Contact us
|
|
|
5.03 miles
|
Vantage VA14
|
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
|
|
5.03 miles
|
Peterson: Leesburg Gateway Campus
|
Peterson Companies, through its affiliate Leesburg Gateway, LLC, is proposing a significant data center and industrial development on a 100-acre site in Leesburg, Virginia.
|
|
5.03 miles
|
Stack: Loudoun 1
|
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
5.06 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
|
5.07 miles
|
Vantage VA16
|
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
|
|
5.08 miles
|
Sentinel: Cloud Plaza, Sterling, VA
|
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
|
|
5.09 miles
|
Prologis: Sterling, VA
|
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
|
5.10 miles
|
Vantage VA12
|
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
|
|
5.10 miles
|
Point TwoInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
5.13 miles
|
Vantage VA11
|
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
|
|
5.13 miles
|
MaxInterested in this information?Contact us
|
|
|
5.15 miles
|
Valley ThreeInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
5.20 miles
|
CyrusOne: NVA9 Bldg-1B
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
5.20 miles
|
Digital Realty: IAD45
|
This facility is part of the Digital Dulles Campus in Sterling, VA.
|
|
5.22 miles
|
Ridge ProInterested in this information?Contact us
|
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
|
|
5.23 miles
|
ThreeInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
5.25 miles
|
CyrusOne: NVA9 Bldg-2
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
5.25 miles
|
PointOne: IAD2
|
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
|
|
5.27 miles
|
Digital Realty: IAD44
|
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
|
5.27 miles
|
CyrusOne: NVA9 Bldg-1A
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
5.30 miles
|
North CenterInterested in this information?Contact us
|
|
|
5.30 miles
|
Prologis: Executive Drive
|
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
|
|
5.31 miles
|
Tower UltraInterested in this information?Contact us
|
|
|
5.37 miles
|
West ValleyInterested in this information?Contact us
|
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
5.39 miles
|
Digital Realty Dulles Expansion
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
|
5.39 miles
|
Central ParkInterested in this information?Contact us
|
|
|
5.41 miles
|
JK Land: Tech Park 1 Expansion
|
|
|
5.42 miles
|
PointOne: Ashburn
|
The campus will have 2 buildings
|
|
5.43 miles
|
East TowerInterested in this information?Contact us
|
|
|
5.44 miles
|
TA Realty: Sterling, Virginia
|
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
|
|
5.45 miles
|
Station BetaInterested in this information?Contact us
|
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
5.45 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
|
5.48 miles
|
Metro CampusInterested in this information?Contact us
|
|
|
5.49 miles
|
Cloud TowerInterested in this information?Contact us
|
|
|
5.50 miles
|
JK Land: Technology Park 1
|
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
|
5.51 miles
|
Global CampusInterested in this information?Contact us
|
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
5.52 miles
|
GlobalInterested in this information?Contact us
|
|
|
5.54 miles
|
Core PointInterested in this information?Contact us
|
|
|
5.60 miles
|
Vantage: VA22
|
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
5.61 miles
|
Csquare: Dulles IAD3
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
|
5.61 miles
|
Digital Realty: IAD55
|
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
|
|
5.62 miles
|
Vantage: VA21
|
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
|
|
5.63 miles
|
HubInterested in this information?Contact us
|
|
|
5.63 miles
|
COPT: 45771 Maries Rd
|
|
|
5.65 miles
|
Prologis: Global Plaza Rd
|
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
|
|
5.68 miles
|
Tower OneInterested in this information?Contact us
|
|
|
5.68 miles
|
Vantage: VA23
|
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
5.71 miles
|
Center PrimeInterested in this information?Contact us
|
|
|
5.71 miles
|
COPT: 45761 Maries Rd
|
|
|
5.73 miles
|
Campus PrimeInterested in this information?Contact us
|
|
|
5.76 miles
|
West StationInterested in this information?Contact us
|
|
|
5.77 miles
|
East PlazaInterested in this information?Contact us
|
|
|
5.84 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
5.84 miles
|
ProInterested in this information?Contact us
|
|
|
5.84 miles
|
Hiddenwood Assemblage Campus
|
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
|
5.86 miles
|
WestInterested in this information?Contact us
|
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
|
|
5.86 miles
|
Cloud ParkInterested in this information?Contact us
|
|
|
5.89 miles
|
Yondr: Arcola Bldg 1
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
|
5.90 miles
|
JK Land: Technology Park 2
|
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
|
5.91 miles
|
Centersquare: Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
|
5.93 miles
|
Global HubInterested in this information?Contact us
|
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
|
|
5.93 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
|
5.95 miles
|
AlphaInterested in this information?Contact us
|
|
|
5.97 miles
|
Yondr: Arcola Bldg 2
|
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
|
5.99 miles
|
EdgeCore Ashburn
|
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
|
6.01 miles
|
Park UltraInterested in this information?Contact us
|
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
6.01 miles
|
JK Land: Technology Park 3
|
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
|
6.03 miles
|
Centersquare: Sterling DC2
|
|
|
6.03 miles
|
Yondr: Arcola Expansion
|
Yondr is planning to expand capacity on an adjacent parcel of land.
|
|
6.04 miles
|
CyrusOne Sterling VIII
|
|
|
6.04 miles
|
ProInterested in this information?Contact us
|
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
|
|
6.05 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
|
6.06 miles
|
Point OneInterested in this information?Contact us
|
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
|
|
6.09 miles
|
Centersquare: Sterling DC4
|
|
|
6.14 miles
|
EastInterested in this information?Contact us
|
|
|
6.14 miles
|
Global StationInterested in this information?Contact us
|
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
6.16 miles
|
Point ThreeInterested in this information?Contact us
|
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
|
|
6.16 miles
|
PowerHouse: Arcola Bldg B
|
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
6.17 miles
|
HubInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
6.20 miles
|
Park AlphaInterested in this information?Contact us
|
|
|
6.20 miles
|
PowerHouse: Arcola Bldg A
|
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
6.22 miles
|
Park OneInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
6.26 miles
|
Metro StationInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
6.27 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
|
6.28 miles
|
Campus BetaInterested in this information?Contact us
|
|
|
6.30 miles
|
UltraInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
|
|
6.32 miles
|
Prime PointInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
6.32 miles
|
CenterInterested in this information?Contact us
|
|
|
6.35 miles
|
Centersquare: IAD2-B
|
|
|
6.35 miles
|
Valley BetaInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
|
|
6.36 miles
|
CentralInterested in this information?Contact us
|
|
|
6.38 miles
|
Centersquare: IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
|
6.40 miles
|
Point TwoInterested in this information?Contact us
|
|
|
6.42 miles
|
Connect Data Centers: Sterling, VA
|
|
|
6.46 miles
|
Central RidgeInterested in this information?Contact us
|
|
|
6.57 miles
|
Dulles 2000 Campus
|
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
|
6.69 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
6.73 miles
|
SouthInterested in this information?Contact us
|
|
|
6.74 miles
|
Kyndryl: Sterling
|
|
|
6.76 miles
|
TwoInterested in this information?Contact us
|
|
|
6.77 miles
|
Campus ThreeInterested in this information?Contact us
|
|
|
6.80 miles
|
Global StationInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
6.84 miles
|
GammaInterested in this information?Contact us
|
|
|
6.84 miles
|
PlazaInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
6.91 miles
|
PrimeInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
7.90 miles
|
Metro PointInterested in this information?Contact us
|
|
|
7.97 miles
|
Central ValleyInterested in this information?Contact us
|
|
|
7.98 miles
|
Point GammaInterested in this information?Contact us
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
|
8.05 miles
|
Metro RidgeInterested in this information?Contact us
|
|
|
8.06 miles
|
ProInterested in this information?Contact us
|
|
|
8.08 miles
|
East ParkInterested in this information?Contact us
|
|
|
8.15 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
8.17 miles
|
Prime RidgeInterested in this information?Contact us
|
|
|
8.23 miles
|
North RidgeInterested in this information?Contact us
|
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
|
|
8.28 miles
|
Central PointInterested in this information?Contact us
|
|
|
8.29 miles
|
Metro CampusInterested in this information?Contact us
|
|
|
8.33 miles
|
Point ThreeInterested in this information?Contact us
|
|
|
8.38 miles
|
Central HubInterested in this information?Contact us
|
|
|
8.42 miles
|
CoreInterested in this information?Contact us
|
|
|
8.46 miles
|
Station MaxInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
8.53 miles
|
Plaza MaxInterested in this information?Contact us
|
|
|
8.57 miles
|
CampusInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
8.57 miles
|
ParkInterested in this information?Contact us
|
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
|
|
8.60 miles
|
Metro HubInterested in this information?Contact us
|
|
|
8.65 miles
|
Campus AlphaInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
8.69 miles
|
North CenterInterested in this information?Contact us
|
|
|
8.88 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
8.94 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
|
8.97 miles
|
Lumen Herndon 1
|
|
|
8.98 miles
|
Lumen Herndon 3
|
|
|
9.09 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
9.15 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
9.20 miles
|
Starwood: Stonecroft Blvd, Chantilly
|
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
|
|
9.20 miles
|
Tower BetaInterested in this information?Contact us
|
|
|
9.26 miles
|
South RidgeInterested in this information?Contact us
|
|
|
9.27 miles
|
OneInterested in this information?Contact us
|
|
|
9.30 miles
|
H5: Herndon
|
|
|
9.30 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
9.31 miles
|
Equinix Herndon DC97
|
|
|
9.34 miles
|
Valley OneInterested in this information?Contact us
|
|
|
9.42 miles
|
Penzance: Chantilly Premier
|
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
|
9.44 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
|
|
9.45 miles
|
East PlazaInterested in this information?Contact us
|
|
|
9.61 miles
|
PlazaInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
9.68 miles
|
Tower ThreeInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
9.97 miles
|
Central ParkInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
10.04 miles
|
Edge ValleyInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
10.07 miles
|
CoreSite: VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
10.07 miles
|
Ridge OneInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
10.29 miles
|
CoreSite: VA2
|
|
|
10.31 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
10.31 miles
|
CoreSite: VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
10.76 miles
|
Dulles South Innovation Center
|
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
|
|
11.47 miles
|
Parkstone Tech Park
|
|
|
11.82 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
12.00 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
12.10 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
12.99 miles
|
QTS: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
13.03 miles
|
Atmosphere: Dickerson, Maryland
|
|
|
14.32 miles
|
Compass: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
15.76 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
|
15.87 miles
|
Equinix Manassas DC14
|
|
|
16.16 miles
|
West StationInterested in this information?Contact us
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
|
16.17 miles
|
Central CampusInterested in this information?Contact us
|
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
|
|
16.18 miles
|
CorScale: Gainesville 5
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
16.18 miles
|
Aligned: Manassas, VA
|
In 2022, Aligned acquired this plot in Manassas, Virginia.
|
|
16.21 miles
|
Corscale: Gainesville 1
|
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
|
|
16.26 miles
|
CorScale: Gainesville 4
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
16.26 miles
|
East HubInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
16.38 miles
|
CorScale: Gainesville 2
|
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
|
|
16.41 miles
|
Plaza TwoInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
16.41 miles
|
ProInterested in this information?Contact us
|
|
|
16.41 miles
|
CorScale: Gainesville 3
|
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
|
|
16.43 miles
|
Station MaxInterested in this information?Contact us
|
|
|
16.48 miles
|
Edge CenterInterested in this information?Contact us
|
|
|
16.54 miles
|
PrimeInterested in this information?Contact us
|
|
|
16.55 miles
|
John Marshall Commons Tech Park
|
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
|
|
16.64 miles
|
NTT: VA13
|
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
16.65 miles
|
West ParkInterested in this information?Contact us
|
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
|
|
16.67 miles
|
MaxInterested in this information?Contact us
|
|
|
16.68 miles
|
NTT: VA12
|
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
16.70 miles
|
NTT: VA11
|
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
16.71 miles
|
UltraInterested in this information?Contact us
|
|
|
16.71 miles
|
Park UltraInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
16.73 miles
|
NTT: VA10
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
16.74 miles
|
Ridge UltraInterested in this information?Contact us
|
|
|
16.76 miles
|
South PointInterested in this information?Contact us
|
|
|
16.76 miles
|
Point PlusInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
16.77 miles
|
West HubInterested in this information?Contact us
|
|
|
16.77 miles
|
Campus GammaInterested in this information?Contact us
|
Second of two planned one-story Microsoft data center buildings on the Wellington MNZ07 campus near Gainesville, Virginia.
|
|
16.79 miles
|
Edge ValleyInterested in this information?Contact us
|
First of two planned one-story Microsoft data center buildings on the Wellington MNZ07 campus near Gainesville, Virginia, on the former Atlantic Research plant site.
|
|
16.79 miles
|
Metro PointInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
16.81 miles
|
MetroInterested in this information?Contact us
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
|
16.83 miles
|
PointInterested in this information?Contact us
|
|
|
16.84 miles
|
TowerInterested in this information?Contact us
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
|
16.86 miles
|
Tower OneInterested in this information?Contact us
|
The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
|
|
16.86 miles
|
Equinix Vienna DC8
|
|
|
16.86 miles
|
Station MaxInterested in this information?Contact us
|
|
|
16.87 miles
|
Center AlphaInterested in this information?Contact us
|
|
|
16.88 miles
|
Center MaxInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
16.90 miles
|
Tower PrimeInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
16.99 miles
|
CentralInterested in this information?Contact us
|
|
|
17.04 miles
|
Gardner Property Project
|
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
|
|
17.07 miles
|
EdgeInterested in this information?Contact us
|
|
|
17.10 miles
|
West PlazaInterested in this information?Contact us
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
|
17.11 miles
|
Tower PrimeInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
17.15 miles
|
Iron Mountain: Manassas Point
|
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
|
|
17.22 miles
|
SouthInterested in this information?Contact us
|
|
|
17.34 miles
|
North ValleyInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
17.37 miles
|
BlackChamber: Gainesville, VA
|
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
|
|
17.46 miles
|
West PointInterested in this information?Contact us
|
|
|
17.51 miles
|
GammaInterested in this information?Contact us
|
|
|
17.54 miles
|
Campus PlusInterested in this information?Contact us
|
|
|
17.57 miles
|
Hub MaxInterested in this information?Contact us
|
|
|
17.59 miles
|
PlazaInterested in this information?Contact us
|
Amazon Data Services has expanded its footprint in Northern Virginia’s hyper-competitive data center corridor with a $120 million acquisition of 44 contiguous acres in Manassas, Prince William County.
|
|
17.64 miles
|
Iron Mountain VA-1
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
|
17.67 miles
|
MetroInterested in this information?Contact us
|
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
|
|
17.69 miles
|
Point ThreeInterested in this information?Contact us
|
|
|
17.71 miles
|
Iron Mountain VA-2
|
|
|
17.73 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
|
|
17.73 miles
|
Edge TowerInterested in this information?Contact us
|
|
|
17.76 miles
|
ProInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
|
17.79 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
|
17.81 miles
|
Iron Mountain: VA-7
|
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
|
|
17.86 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
|
17.92 miles
|
Opus Interactive Manassas
|
|
|
17.97 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
|
17.99 miles
|
Cogent Vienna
|
|
|
17.99 miles
|
Yondr Bristow Campus
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
|
|
18.04 miles
|
8100 Boone - Digital Realty
|
|
|
18.05 miles
|
North CampusInterested in this information?Contact us
|
Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
|
|
18.12 miles
|
Iron Mountain: VA-8
|
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
|
|
18.14 miles
|
Prime PlazaInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
|
18.14 miles
|
Yondr: Bristow Bldg 2
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
|
|
18.16 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
|
18.33 miles
|
Iron Mountain: VA-6
|
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
|
|
18.46 miles
|
Equinix Vienna DC7
|
|
|
18.46 miles
|
DataBank McLean IAD2
|
In 2020, DataBank acquired the site from zColo.
|
|
18.50 miles
|
JK Land: Hunter Trust
|
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
|
|
18.50 miles
|
Element Critical VA1
|
|
|
18.51 miles
|
Stack: NVA05D
|
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
|
|
18.51 miles
|
Lumen McLean 1
|
|
|
18.52 miles
|
Global ValleyInterested in this information?Contact us
|
A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
|
|
18.63 miles
|
TPC: Manassas, VA
|
|
|
18.68 miles
|
BetaInterested in this information?Contact us
|
|
|
18.70 miles
|
Yondr: Manassas
|
Yondr and Cerberus have acquired land in Manassas for a new hyperscale data center campus targeted for service in 2029.
|
|
18.74 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
|
18.76 miles
|
Prime StationInterested in this information?Contact us
|
|
|
18.76 miles
|
Station BetaInterested in this information?Contact us
|
|
|
18.77 miles
|
Central PlazaInterested in this information?Contact us
|
Amazon Data Services acquired the 269-acre site of the planned Devlin Technology Park in Prince William County, Bristow, in late 2025.
|
|
18.79 miles
|
Stack: NVA05C
|
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
|
|
18.83 miles
|
North StationInterested in this information?Contact us
|
|
|
18.97 miles
|
Stack: NVA05A
|
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
|
19.22 miles
|
QTS Manassas 1 DC5
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
19.27 miles
|
JK Land: Comcast Center
|
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
|
|
19.33 miles
|
QTS: Manassas 1 DC3
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
19.36 miles
|
QTS: Manassas 1 DC1
|
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
|
19.37 miles
|
QTS: Manassas 1 DC2
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
19.47 miles
|
QTS: Manassas 1 DC4
|
|
|
19.54 miles
|
QTS Manassas 1 DC6
|
This facility is part of QTS Manassas 1 Campus in Virginia.
|
|
19.62 miles
|
West RidgeInterested in this information?Contact us
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
|
19.63 miles
|
Central PlazaInterested in this information?Contact us
|
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
|
|
19.68 miles
|
GlobalInterested in this information?Contact us
|
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
|
|
19.68 miles
|
Stack: NVA02G
|
NVA02G is a 185,803 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 9530 Hornbaker Road in Manassas, Virginia.
|
|
19.71 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
|
19.71 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
|
19.71 miles
|
Evoswitch USA WDC 1
|
|
|
19.71 miles
|
PlazaInterested in this information?Contact us
|
|
|
19.71 miles
|
Black Chamber: Nokesville
|
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
|
|
19.75 miles
|
North TowerInterested in this information?Contact us
|
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
|
|
19.76 miles
|
West CenterInterested in this information?Contact us
|
Amazon is building another data center in it's Innovation Drive campus.
|
|
19.77 miles
|
HubInterested in this information?Contact us
|
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
|
|
19.80 miles
|
Stack: NVA02D
|
NVA02D is a 281,000 sq ft data center building on STACK Infrastructure's NVA02 campus at 9590 Hornbaker Road in Manassas, Virginia.
|
|
19.83 miles
|
MetroInterested in this information?Contact us
|
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
|
|
19.89 miles
|
Stack: NVA02C
|
NVA02C, or Building C, is a 14,387 sq ft building on STACK Infrastructure's NVA02 campus at 9730 Hornbaker Road in Manassas, Virginia.
|
|
19.90 miles
|
Stack: NVA02E
|
NVA02E is a 259,200 sq ft data center building on STACK Infrastructure's NVA02 campus at 9570 Hornbaker Road in Manassas, Virginia.
|
|
19.95 miles
|
Plaza BetaInterested in this information?Contact us
|
IAD-109 is an Amazon Web Services data center in STACK Infrastructure's NVA02B building at 9740 Hornbaker Road in Manassas, Virginia.
|
|
19.95 miles
|
Stack: NVA02B
|
NVA02B is a 224,652 sq ft data center building on STACK Infrastructure's NVA02 campus at 9740 Hornbaker Road in Manassas, Virginia.
|
|
19.95 miles
|
Prime ParkInterested in this information?Contact us
|
|
|
19.96 miles
|
Stack: NVA02F
|
NVA02F is a data center building under construction on STACK Infrastructure's NVA02 campus at 9640 Hornbaker Road in Manassas, Virginia.
|
|
19.96 miles
|
Core ParkInterested in this information?Contact us
|
|