CyrusOne Mesa

Latest Podcast E Elliot Road & S 96th Street
Planned
Future facility in planning stage
Operated by:

CyrusOne Mesa

Year Planned: 2027
Lot Size: 270 acres

CyrusOne plans to develop a new campus on 62 acres on the corner of Elliot and Ellsworth Roads. The company aims to develop up to five two-story buildings, spanning 286,530 square feet (26,620 sqm) each, for a total of around 1.4 million sq ft (130,000 sqm). In August 2024, Planning officials have recommended the data center projects for approval in Mesa, Arizona.

CyrusOne acquired the land from Sunbelt Investment Holdings Inc. in 2018 for $19.3 million, according to Maricopa County records.

Map and Nearby Locations

E Elliot Road & S 96th Street
CyrusOne Sites
Nearby Facilities

CyrusOne Mesa Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of CyrusOne Mesa

Distance Site About
0.21 miles Ridge TwoInterested in this information?Contact us
This facility is a part of Meta's Mesa Campus in Arizona.
0.26 miles Plaza ThreeInterested in this information?Contact us
This facility is a part of Meta's Mesa Campus in Arizona.
0.29 miles Center MaxInterested in this information?Contact us
This facility is a part of Meta's Mesa Campus in Arizona.
0.33 miles CenterInterested in this information?Contact us
This facility is a part of Meta's Mesa Campus in Arizona.
0.39 miles EdgeCore: Mesa Expansion
EdgeCore Digital Infrastructure is significantly expanding its data center campus in Mesa, Arizona. The company plans to add an additional 43.87 acres to its existing 40-acre facility.
0.40 miles PrimeInterested in this information?Contact us
Meta's Mesa data center was first announced in August 2021, is a greenfield development of a five-building campus encompassing over 2.5 million square feet of data center and admin space.
0.46 miles EdgeCore: PH03
0.50 miles EdgeCore: PH02
0.60 miles EdgeCore: Mesa PH01
The 1.25 million sqft campus can include up to 7 buildings. The first of the seven data halls is complete and totals 200,880 sqft with an adjoining 20,000 sqft office and support space included.
0.66 miles Comarch Mesa
0.81 miles NTT PH3
0.83 miles NTT PH2
0.89 miles NTT Phoenix Campus
The first data center building encompasses 126,000 sqft of data floor space.
0.91 miles Novva: Mesa Campus
Covering 160 acres, Novva’s first Arizona Data Center campus is located in Mesa, AZ. The campus includes five data halls, 1.3 million sq ft of data hall space, and 200,000 square feet of office space built over 2 phases.
0.93 miles NTT PH6
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
0.94 miles CentralInterested in this information?Contact us
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa. The Elliot campus is a 42.9-acre property located off Elliot Road, adjacent to Apple's existing data center in Mesa.
0.96 miles NTT PH5
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
0.98 miles NTT PH4
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
0.99 miles Novva: Mesa 2
This facility is a part of Novva's Mesa campus in Arizona.
1.08 miles Novva: Mesa 3
This facility is a part of Novva's Mesa campus in Arizona.
1.14 miles Novva: Mesa 4
This facility is a part of Novva's Mesa campus in Arizona.
1.20 miles Novva: Mesa 5
This facility is a part of Novva's Mesa campus in Arizona.
1.27 miles Edged Energy: Phoenix PHX11
Edged Energy is planning a built-to-suit data center near its PHX01 facility.
1.32 miles Edgeconnex: Mesa
EdgeConneX is building a massive data center campus on a 93-acre land parcel it has owned since 2017 through Loop 202 & Elliot Road LLC.
1.34 miles Campus AlphaInterested in this information?Contact us
The site was a former a sapphire-glass factory that supplied glass to Apple. The glass maker filed for bankruptcy and vacated the building in 2014. Now the 1.3 million square foot building is one of Apple’s data centers
1.42 miles Edged Energy: Phoenix, Arizona
Edged Energy is building a 79,200 sq ft data center on a 14-acre site near the Loop 202 freeway and Warner Road.
1.42 miles Edged: Phoenix
Edged Energy’s PHX01-1 is a 36MW, two-story data center in Mesa, Arizona, spanning ~210,000 sq ft on a 12-acre site, launched in April 2026 with waterless cooling for high-density AI workloads.
2.67 miles South CampusInterested in this information?Contact us
Phase II is expected to see Google build 280,000 square feet more.
2.70 miles OneInterested in this information?Contact us
This facility will be a part of Google's Redhawk campus in Mesa, AZ.
2.95 miles Cloud CenterInterested in this information?Contact us
3.65 miles NTT: Pacific 4
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
3.76 miles NTT: Pacific 5
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
3.81 miles NTT: Pacific Proving Tech Park
NTT Data has acquired 173 acres at the northeast intersection of Pecos and Crismon roads, east of Mesa, for $300 million.
3.87 miles NTT: Pacific 6
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
3.91 miles NTT: Pacific 2
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
3.92 miles BetaInterested in this information?Contact us
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa.
3.96 miles NTT: Pacific 7
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
4.02 miles NTT: Pacific 3
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
11.53 miles US Signal Phoenix AZ01
14.25 miles Centersquare: PHX1
Centersquare's Phoenix Mesa is cloud-enabled data center located just 10 miles from Phoenix Sky Harbor Airport, with more than 154,000 sq. ft. of space.
15.34 miles Lincoln: Chandler, AZ
Real estate firm Lincoln Property Company reacquired its data center in Phoenix, Arizona, in 2025.
15.35 miles Lincoln: Chandler Bldg-2
Lincoln Property's three-story, 243,000 sq ft expansion building is part of a future development plan that was approved by the City of Chandler under the previous owner.
15.35 miles Internap Phoenix 2500 W Frye Rd
American cloud and colocation provider Internap (INAP) has taken a master lease in a 150,000 square foot data center in Chandler, near Phoenix, Arizona.
15.64 miles CyrusOne PHX10
15.66 miles CyrusOne PHX3
15.68 miles CyrusOne PHX1
15.71 miles CyrusOne Chandler Phoenix Campus
CyrusOne plans to build nearly 2 million square-feet data center campus. There are two buildings on the campus currently
15.72 miles 2055 E Technology - Digital Realty
Located in the Arizona State University Research Park and downtown Phoenix Central Business District, the facility was redeveloped in 2007. Digital Realty's 76,000 square foot data center at 2055 E. Technology Circle is approximately 15 miles away from downtown Phoenix. The building is SOC2 certified with 24/7 security and critical facilities management.
15.72 miles CyrusOne PHX2
15.73 miles CyrusOne PHX5
15.73 miles CyrusOne PHX9
15.76 miles H5 Phoenix
H5 acquired the site when it bought NextFort in January 2016H5 acquired the site when it bought NextFort in January 20
15.78 miles CyrusOne PHX4
15.79 miles CyrusOne PHX7
15.80 miles DataCanopy: Phoenix, AZ
15.82 miles 2010 East Centennial
Digital Realty sold the office & data center building in 2018 to an unnamed company. We believe Fox Sports is the tenant.
15.82 miles CyrusOne PHX6
15.90 miles 2121 S Price - Digital Realty
In 2010, DRT acquired this site from 365 Main portfolio.
15.90 miles CyrusOne PHX8
16.01 miles 1900 S Price - Digital Realty
The Building is 1 story Flood Zone: Zone X Seismic Zone: Zone 1
16.05 miles Aligned: PHX-04
Aligned Energy's PHX04 site is located at the NEC of Price Road and Innovation Street. The data center spans 396,343 sqft.
16.10 miles Aligned: PHX-06
PHX06 is a two-phase development that will total 456,946 SqFt
17.14 miles Ryan: Florence Tech Park
The 780-acre development, dubbed the Florence Tech Park, has been presented with varying plans. Initial conceptual documents show five data centers, two office buildings, and one general industrial building.
18.10 miles EdgeCore: Dobson Expansion
18.22 miles EdgeCore: Dobson Farms
Ryan Companies and EdgeCore are moving forward with plans to develop a massive new data center and industrial campus on over 780 acres located in the town of Florence, Pinal County.

CyrusOne Mesa Data Center Photos See all

Operating Company

Operated by:

CyrusOne is a data center owner, operator, and developer that manages more than 50 facilities, with its footprint concentrated in the U.S. and Europe. The company is based in Dallas and was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt.

Its portfolio centers on hyperscale and enterprise colocation across multi-building campuses. CyrusOne has also pursued international growth initiatives alongside its core North American and European markets.

CyrusOne History:

  • March 2022: Taken private by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt.
  • July 2015: Acquired Cervalis, adding four data centers and two disaster recovery sites in the New York metro.
  • July 2014: Acquired Cervalis
  • January 2013: Completed initial public offering on NASDAQ as a carve-out of Cincinnati Bell’s data center business.
  • June 2010: Cincinnati Bell acquired CyrusOne for approximately 525 million dollars.
  • 2000: Founded by David Ferdman.
117
Facilities
31
Markets

News See all

Read CyrusOne Files Plans for Three-Building, $1.5bn Data Center Campus in Fairfield, Texas
CyrusOne has filed plans for three buildings at a new data center campus in Fairfield, Texas, located adjacent to Calpine’s Freestone natural gas power plant. The project, on FM 488 in Freestone Co...

CyrusOne Files Plans for Three-Building, $1.5bn Data Center Campus in Fairfield, Texas

August 01, 2026 CyrusOne

CyrusOne has filed plans for three buildings at a new data center campus in Fairfield, Texas, located adjacent to Calpine’s Freestone natural gas power plant. The project, on FM 488 in Freestone County, about 90 miles (144.8km) south of Dallas, is part of a 760MW data center development being...

Read more
Read CyrusOne Begins Construction on 380MW Data Center in Texas
CyrusOne has begun construction on a new data center campus in Texas, breaking ground last week in Freestone County, about 90 miles (144 km) south of Dallas. Full details of the planned development...

CyrusOne Begins Construction on 380MW Data Center in Texas

June 08, 2026 CyrusOne

CyrusOne has begun construction on a new data center campus in Texas, breaking ground last week in Freestone County, about 90 miles (144 km) south of Dallas. Full details of the planned development have not yet been disclosed. CyrusOne has partnered with Constellation on a 380MW agreement to...

Read more
Read CyrusOne to Internalize US Data Center Operations
CyrusOne to Internalize US Data Center Operations

CyrusOne to Internalize US Data Center Operations

May 07, 2026 CyrusOne

US data center operator CyrusOne is bringing a significant portion of its on-site operations in-house, ending large sections of its existing outsourcing partnership with JLL. The KKR-owned company confirmed to DCD this week that it is restructuring its US operating model by internalizing on-site...

Read more
Read CyrusOne Wins Approval for Sangamon, Illinois Data Center
CyrusOne Wins Approval for Sangamon, Illinois Data Center

CyrusOne Wins Approval for Sangamon, Illinois Data Center

April 09, 2026 CyrusOne

CyrusOne has received approval to build a data center in Sangamon, Illinois. Members of the Sangamon County Board voted on Tuesday to allow construction of the $500 million project, which will span 280 acres and include four buildings at the 13000 block of Thayer Road in Waverly.CyrusOne has said...

Read more
Read CyrusOne Starts Construction on First Italy Data CenterI Outside Milan
CyrusOne Starts Construction on First Italy Data CenterI Outside Milan

CyrusOne Starts Construction on First Italy Data CenterI Outside Milan

March 28, 2026 CyrusOne

CyrusOne has broken ground on its first data center in Italy. The company this week announced it has officially broken ground on MIL1 in Milan. The three-story facility will deliver 27MW of IT capacity across 7,000 sqm (75,345 sq ft) of technical space, with the first phase expected to go live by...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?