Published in Edged Energy

Edged secures permission for second data center at Irving campus, Tex

Jan 17, 2026 | Posted by Abdul-Rahman Oladimeji

Data center operator Edged this week announced plans to add a second data center to its Edged Dallas campus in Irving, Dallas County. The news follows Irving City Council voting unanimously to approve the expansion, which will be located on North Wildwood Drive in the industrial area east of Highway 12 and south of Highway 183.

A 24MW facility, the data center will be equipped with a closed-loop waterless cooling system from Edged’s sister company, ThermalWorks. The modular system reportedly supports rack densities exceeding 120kW with air-cooling and 400kW with plug-and-play liquid cooling.

“As demand for AI infrastructure accelerates, efficiency and speed of deployment matter more than ever,” said Bryant Farland, Edged US CEO. “This expansion allows us to deliver the high-density capacity our customers need but because it is Edged, the DFW community will gain this infrastructure without using water and operating at an energy efficiency that is best in class in the industry. We are grateful to the City of Irving and the Irving Economic Development Partnership for their leadership and collaboration, which have made Irving an ideal location to build sustainable, future-ready infrastructure.”

Local variables: publishable - The model instance (Post) with status: draft/published publish_path - The route path for the publish action %>

Ready to Level up Your
Data Center Strategy?