Digital Realty: DFW44

Latest Podcast 2501 Edmonds Ln
Under ConstructionOperationalPlanned
Operational facility with ongoing expansion and future phases planned
Operated by:

Digital Realty: DFW44

Short Code: DFW44
Site was first built in 2024 and has expansions through 2028
Utility Provider: TNMP
Lot Size: 25 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power

DFW44, first filed as Project Gold Lewisville, is a single-story data center beside Digital Realty's Convergence campus in Lewisville. It is the twin of DFW39 in Garland. Both buildings are 100% pre-leased to an S&P 100 investment-grade financial-services company. In March 2024 Digital Realty sold a 65% stake in the pair to Mitsubishi Corporation and kept 35%. The first two data halls opened in 2024. Digital Realty is now expanding two suites, fitting out a third data hall for the tenant and adding a shell for a fourth through 2027.

Site History

  • 2027: A shell addition for data hall 4 is scheduled.
  • 2026-2027: Fit-out of data hall 3 for the tenant.
  • 2025-2026: Expansion of two data center suites.
  • March 2024: Mitsubishi Corporation buys a 65% stake in DFW44 and DFW39.
  • 2024: The first two data halls open.
  • November 2022: Construction of the shell starts.

Map and Nearby Locations

2501 Edmonds Ln
Digital Realty Trust Sites
Nearby Facilities

Digital Realty: DFW44 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Digital Realty: DFW44

Distance Site About
0.37 miles Digital Realty: DFW26
Digital Realty's DFW26 is the Convergence campus in Lewisville, Texas, a former Texas Instruments plant converted into ten connected buildings for data center, office and lab tenants.
0.48 miles Lightedge: Dallas (Lewisville)
LightEdge leases a suite in CyrusOne's Lewisville DFW2 data center north of Dallas.
0.49 miles CyrusOne: Lewisville DFW2
Two independent power grids Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
4.32 miles DataCanopy: Carrollton, TX
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
4.37 miles CyrusOne Carrollton
CyrusOne's DFW1 in Carrollton is one of the largest data centers in Texas, a building CyrusOne bought in 2012 and converted to data center use in phases.
7.39 miles QTS Irving DC1
QTS's first Dallas-area data center occupies the former Maxim semiconductor plant in Irving, Texas, and holds the campus's DC1 and DC2 data halls.
7.40 miles QTS: Irving DC6
DC6 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in late 2025 and fitted out for a tenant in 2026.
7.53 miles QTS Irving DC3
DC3 is a multi-story data center on QTS's Irving campus in Las Colinas, with an on-site substation and diverse campus fiber entrances.
7.54 miles QTS: Irving DC5
DC5 is a two-story, $180 million data center on QTS's Irving campus in Las Colinas, completed in 2025.
7.64 miles QTS: Irving DC4
DC4 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in 2024 and fitted out for a tenant in 2025.
7.68 miles Rackspace Grapevine DFW1
8.72 miles PowerHouse: Irving Bldg-C
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
8.75 miles PowerHouse: Irving Bldg-B
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
8.84 miles PowerHouse: Irving Bldg-A
PowerHouse is developing its first Irving data center campus at 111 Customer Way, Irving, Texas, on a 50-acre site in the Las Colinas area. The project is a multi-phase, three-building development totaling 946,000 sq ft, with construction underway and the first building structurally completed in March 2026.
8.88 miles VAZATA Horizon Dallas (DAL II)
VAZATA’s Dallas Data Center DAB (Dal II) Features 12,500 of move-in-ready Tier III (with Tier IV attributes) data center space.
8.90 miles Digital Realty: DFW12
Digital Realty's DFW12 is a data center at 2440 Marsh Lane in Carrollton, Texas, with six suites served by dual 12.47 kV utility feeds.
9.35 miles Digital Realty: DFW11
Digital Realty's DFW11 is a single-story data center at 4025 Midway Road in Carrollton, Texas, built in 2000 and renovated in 2008. VAZATA is its largest tenant.
9.36 miles VAZATA Dallas (DAL I & III)
VAZATA's DAL I and DAL III data centers occupy space in Digital Realty's DFW11 building at 4025 Midway Road in Carrollton, Texas.
9.97 miles Centersquare: Dallas DFW3
The Centersquare Dallas portfolio consists of three data centers located in Fort Worth, Allen and Dallas providing close proximity to business hubs in downtown Dallas, Plano and Fort Worth.
10.36 miles Mobius: Farmers Branch
10.70 miles TRG Datacenters: Dallas DFW1
TRG Data Centers' DFW1 facility is a 160,000 gross-square-foot data center situated in Farmers Branch, Texas, within the strategic Addison Fiber Hub just 12 miles from the Dallas Infomart.
10.92 miles Resilience DFW
The Skybox campus can be expanded to 350,000 square foot capacity to host servers and provide 60 megawatts of power in later phases.
11.28 miles Aphorio Carter: Farmers Branch, TX
A Farmers Branch, Texas data center, formerly Digital Realty DFW14, owned by Aphorio Carter and leased in full to a Singapore-based consumer internet company.
11.91 miles Stack: DFW01C
STACK Infrastructure's DFW01C is a planned build-to-suit data center on the former Spring Creek Golf Center site, the third building on its DFW01 campus in Plano.
11.93 miles Provident: Dallas-Fort Worth Metroplex
Northampton Capital Partners and Provident Data Centers have formed a joint venture to develop a data center within the North Dallas Corridor of the Dallas-Fort Worth Metroplex.
11.95 miles Centersquare: Fort Worth DFW1
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.
12.02 miles Equinix Dallas DA7
Equinix DA7 occupies one of the four data centers in STACK's DFW01A building in Plano's Legacy Business Park, leased in 2015.
12.02 miles Stack: DFW01A
Former Stream Data Centers powered shell at 6653 Pinecrest Drive in Plano's Legacy Business Park, converted by T5 Data Centers from 2011 and enlarged in 2013 into four independent data centers, one of them Equinix DA7.
12.08 miles Stack: DFW01B
STACK Infrastructure's DFW01B is the second building on its DFW01 campus in Plano's Legacy Business Park, a five-hall data center built in 2016 as T5@Dallas II.
12.35 miles DataBank: DFW8
Databank expanded its Plano data center campus (DFW3) with a $280 million, 265,000sqft three-story building.
12.45 miles DataBank: DFW3
DataBank's DFW3 is the first building on its Plano campus near Legacy Park, an Uptime-certified Tier III data center that opened in 2018.
13.03 miles CoreSite: Irving DA1
CoreSite DA1 is CoreSite's first Texas data center, planned on the former Exela Technologies site at 2701 East Grauwyler Road in Irving.
13.03 miles Equinix Dallas DA9
Equinix acquired DA9 in Irving as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DFW1.
13.42 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.48 miles Prime: DFW01-02
Prime Data Centers' DFW01-02 is a three-story data center next to DFW01-01 on Round Table Drive in northwest Dallas, with its first data hall under construction.
13.50 miles Evocative DA4
This site (DA4) was sold to Evocative in 2022 by Carrier-1.
13.52 miles Prime: DFW01-01
Prime Data Centers' DFW01-01 is a 1968 building on Round Table Drive in northwest Dallas that Carrier-1 converted to a data center in 2014.
13.53 miles DataBank DFW7 LBJ
DataBank's DFW7 is a colocation suite in a multi-tenant office building on the LBJ Freeway in North Dallas.
13.53 miles Fiberhub DFW1
Fiberhub's DFW1 is a retail colocation offering inside Prime Data Centers' DFW01-01 building on Round Table Drive in Dallas, opened in October 2018.
13.69 miles Edged Energy: DFW01-2
This facility will be a part of Edged Energy's Dallas Campus in Texas.
13.69 miles Mapletree: 1221 Coit
13.72 miles Evocative: Dallas DAL6
Evocative acquired the DAL6 data center in Dallas, Texas in 2022. Spanning an impressive 111,000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
13.72 miles Edged Energy: DFW01-1
In January 2025, Edged Energy launched its data center in Irving, Texas..
13.89 miles PowerHouse: Circle T Campus
PowerHouse Data Centers is expanding its Texas footprint with plans for the Circle T Data Center, a campus spanning nearly 88 acres in Westlake, just north of Fort Worth.
13.90 miles Lincoln Rackhouse: 1000 Coit
13.92 miles DataBank DFW6 Love Field
DataBank's DFW6 is a colocation suite in a large multi-tenant data center building on Harry Hines Boulevard near Dallas Love Field.
13.93 miles Citigroup Fort Worth
13.93 miles Lumen Dallas 6
13.94 miles CoreWeave Plano
CoreWeave launched a new $1.6 billion data center in Plano, Texas, which became operational at the end of 2023.
14.28 miles Digital Realty: DFW36
Digital Realty's DFW36 is a colocation floor in the First American Center tower on North Stemmons Freeway in Dallas, first opened by Telx in 2008.
14.38 miles H5 Colo
14.42 miles Lincoln: Plano DFW5
Lincoln Property Company is developing a two-story build-to-suit data center at 660 Data Drive in Plano, Texas, on a 10-acre parcel it acquired in May 2026, with delivery targeted for the fourth quarter of 2029.
14.44 miles STACK Fort Worth Alliance
STACK Infrastructure, Hillwood and IPI Partners announced a hyperscale data center campus at AllianceTexas in north Fort Worth in 2019, but STACK dropped it without building.
14.44 miles Tierpoint Fort Worth
TierPoint's Dallas-Fort Worth data center occupies the former Alliance Gateway / AIG facility on Independence Parkway in north Fort Worth. The site is built for high-density AI and HPC workloads, with direct-to-chip liquid cooling in production alongside air and chilled-water cooling. TierPoint is expanding the utility supply to the site and has room for further phases along the existing building line.
14.60 miles DataBank DFW4 Empire Central
DataBank's DFW4 is a single-story, purpose-built data center in the Stemmons corridor west of Dallas Love Field, run by Stream and then Zayo before DataBank.
14.61 miles Flexential Dallas (Synergy Park)
14.74 miles QTS: FTW1-DC1
FTW1-DC1 is the original building on QTS's Fort Worth campus near AllianceTexas, a former Health Care Service Corporation data center that QTS bought in 2017.
14.76 miles QTS: FTW1-DC2
FTW1-DC2 is the second building on QTS's Fort Worth campus near AllianceTexas, a two-story, $220 million data center completed in 2026.
14.76 miles Prime HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.88 miles CoreSpace Dallas
14.93 miles QTS: FTW1 Expansion
QTS is expanding its Fort Worth data center campus for the third time with a $300 million, 147,946-square-foot addition at 14100 Park Vista Boulevard.
14.93 miles Verizon: 1300 W Mockingbird
Former XO facility
15.13 miles Equinix: Dallas DA12
Equinix DA12 is a four-story data center under construction at the former Taylor Publishing site in West Dallas, part of an $836 million investment.
15.48 miles NTT 2300 W Plano
In January 2019, GI Partners bought the more than 1 million-square-foot office and tech complex at 2300 W. Plano Parkway near Bush Turnpike.
15.65 miles Lumen Dallas 1
Lumen Dallas 1 is Lumen's main colocation gateway in Dallas, a multi-tenant data center at 3180 Irving Boulevard that Level 3 bought in 1998.
15.92 miles TierPoint Dallas (Colo4)
The site was formerly operated by Colo4 before being acquired by TierPoint in 2010
15.93 miles Contegix Dallas
15.93 miles QuadraNet Dallas
15.93 miles HostPapa DFW1
16.67 miles 900 N Dorothy
16.76 miles CleanArc: Dallas Campus
CleanArc Data Centers and Crow Holdings are partnering to develop a turnkey data center campus in central Dallas, Texas.
16.92 miles Digital Realty: DFW16
This facility is a part of Digital Dallas Campus in Richardson.
16.93 miles Equinix Dallas DA10
Former Terremark NAP of Dallas facility in Richardson that Equinix acquired from Verizon in 2017. Equinix closed DA10 in Q1 2021.
16.94 miles Digital Realty: DFW25
Located in the epicenter of North Dallas' high-technology corridor on the 69-acre Digital Dallas campus, this facility offers over 100,000 square feet of space and connectivity to more than 60 network service providers.
16.94 miles Colovore: Fort Worth DFW02
Colovore's second Dallas-market facility, a purpose-built liquid-cooled colocation building on Heritage Parkway in north Fort Worth. Four-hall design following Colovore's standard high-density spec-build template, with service dates running late 2027 through 2028.
16.94 miles Digital Realty: DFW42
Digital Realty's DFW42 is a planned data center at 1122 Alma Road on the Digital Dallas campus in Richardson, Texas. The 17-acre site holds an existing office building and adjoining lots.
16.95 miles Rackspace Richardson DFW3
In 2012, US hosting company Rackspace signed a long-term lease for more than 58,000 sq ft of raised floor space at Digital Realty Trust's data center campus in Richardson, Texas (Dallas metro).
17.03 miles Digital Realty: 1201 N Bowser
Digital Realty's 1201 N Bowser site is a planned data center expansion on the Digital Dallas campus in Richardson, Texas. The 6.7-acre lot holds a former engineering office building.
17.06 miles Digital Realty: DFW28
This facility is a part of Digital Dallas Campus in Richardson
17.07 miles Digital Realty: DFW17
This facility is a part of Digital Dallas Campus in Richardson
17.12 miles Digital Realty: DFW18
This facility is a part of Digital Dallas Campus in Richardson
17.16 miles AT&T Switching Station (Richardson)
A fire in October 2018 at this AT&T switching site caused a widespread outage of AT&T Internet and U-Verse TV services across North Texas.
17.17 miles DataBank North Dallas DFW2
The facility is located in Northern Dallas in the Technology Business Corridor
17.18 miles Digital Realty: DFW21
Digital Realty's DFW21 at 904 Quality Way is a powered base building on the Digital Dallas campus in Richardson, Texas. DataBank leases the building and runs it as its DFW2 data center.
17.23 miles Digital Realty: DFW29
This facility is a part of Digital Dallas Campus in Richardson.
17.25 miles Digital Realty: DFW35
This facility is a part of Digital Dallas Campus in Richardson.
17.27 miles Digital Realty: DFW20
17.32 miles 365 Richardson, TX
17.49 miles Equinix Dallas DA11
DA11 is Equinix's expansion next to the Infomart.
17.49 miles QumulusAI: Denton, TX
Located on four acres near Western Boulevard and Jim Christal Road, the facility will house eight prefabricated "pods" designed for AI and cryptomining.
17.55 miles Verizon Dallas (Richardson)
17.56 miles Cologix: DAL3
DAL3 is a 13.2K SQFT facility located in the renowned Infomart building at 1950 North Stemmons Freeway.
17.57 miles Cologix: DAL2
DAL2 is a 12,000-square-foot facility located in the Infomart building at 1950 North Stemmons Freeway. Cologix opened its second site at the Dallas Infomart in 2013.
17.60 miles DataBank DFW5
DataBank's DFW5 is a colocation suite inside the Dallas Infomart, the city's main interconnection hub, run before DataBank by CoreXchange and Zayo's zColo.
17.60 miles Cologix: DAL1
Cologix DAL1 & DAL2 and DAL 3 are located in the carrier dense Infomart.
17.60 miles Flexential Dallas Infomart I-V
17.61 miles Lumen Dallas 2
Lumen Dallas 2 is a Lumen network colocation suite in the Dallas Infomart, the city's main interconnection hub at 1950 North Stemmons Freeway.
17.62 miles Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy
The Infomart at 1950 North Stemmons Freeway is the main interconnection hub of Dallas and the South Central US. Equinix owns the 1.5 million sq ft building and runs its DA1, DA2, DA3 and DA6 data centers inside it, beside several other colocation providers.
17.80 miles DigiCo: Dallas DAL1
In January 2025, the newly established DigiCo Infrastructure REIT acquired State Farm’s Richardson data center from JDM III AZ LLC. The 129,170 sq ft facility, which was originally built by the insurance provider in 2015.
17.89 miles CyrusOne: Dallas DFW6
CyrusOne invested $79.8 million to retrofit an existing building in Richardson, Texas, transforming it into their new DFW6 data center.
18.13 miles Fortinet Plano
Fortinet-owned enterprise data center in Plano, bought from Ascent in April 2023. Tornado-hardened to F5, 2.7 MW critical load. Not offered as colocation.
18.38 miles Charles Schwab: Richardson DC5
Charles Schwab's DC5 is a data center on East Renner Road in Richardson, Texas, built by Stream Data Centers in 2012 and sold to a TD Ameritrade affiliate in 2014.
18.64 miles Global IP Networks - Plano
18.88 miles Cisco Richardson TXDC1
19.02 miles Evocative: DAL1
19.02 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.04 miles Core Scientific: Denton, TX
Core Scientific plans to spend as much as $6.1 billion to refurbish its data center in Denton, Texas, turning it from a crypto facility into an AI site.
19.06 miles DataCanopy Dallas
19.10 miles Aligned: DFW-02
Aligned DFW-02 is the second building of Aligned's Plano Data center campus. DFW-02 is part of a 19-acre campus offering 36 megawatts of critical capacity across 220,000 sq. ft.
19.24 miles Digital Realty: DFW10
Digital Realty's DFW10 at 2323 Bryan Street is one of downtown Dallas's two main carrier hotels, a 26-story tower with more than 60 carriers and the building meet-me room.
19.24 miles Equinix Dallas DA4
Equinix DA4 is a colocation suite at 2323 Bryan Street in downtown Dallas that LayerOne opened in 2000 and Equinix acquired with Switch and Data in 2010.
19.24 miles LOGIX Dallas (2323 Bryan)
LOGIX Fiber Networks' colocation suite in the 2323 Bryan Street carrier hotel in downtown Dallas, which LOGIX took over when it bought Alpheus Communications in 2018.
19.25 miles Earthlink Dallas
Former EarthLink colocation suite at 2323 Bryan Street in downtown Dallas, opened in 2013. EarthLink sold its IT services and data center business to Synoptek in 2016.
19.32 miles Lumen Dallas 3
Lumen Dallas 3 is a small Lumen network point of presence in One Main Place, a 33-story office tower at 1201 Main Street in downtown Dallas.
19.36 miles Carrier-Neutral Data CenterInterested in this information?Contact us
19.41 miles Provision Data Services
The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.
19.42 miles Sprocket DAL1
19.57 miles Cogent: 400 S Akard
Former Cogent Communications data center in Suite 700 of 400 South Akard Street in downtown Dallas. Cogent closed the 8,000 sq ft site in 2025.
19.57 miles Lumen Dallas 4
Lumen Dallas 4 is a Lumen network colocation suite on the fifth floor of 400 South Akard, DataBank's carrier hotel in downtown Dallas.
19.57 miles DataBank Downtown Dallas DFW1
DataBank's DFW1 fills 400 South Akard, the 1921 former Federal Reserve Bank of Dallas and one of downtown Dallas's main carrier hotels. DataBank bought the building back from Digital Realty in 2023.
19.57 miles Opus Interactive Dallas
In 2014, Opus Interactive expanded its data center footprint in Dallas, Texas, with additional colocation and cloud hosting infrastructure.
19.58 miles Sprocket DAL2
Former Sprocket Networks hosting site at 400 South Akard Street in downtown Dallas. Sprocket left the hosting business around 2020 and now sells dark fiber.
19.63 miles Flexential Dallas (Plano)
Flexential's Plano site in Dallas is former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017.
19.68 miles Centersquare: Allen DFW2
The single-story Centersquare data center in Allen is part of Millennium high technology park in Allen, TX.
19.74 miles EdgeCore Dallas
19.87 miles Mapletree: 3300 Essex
Mapletree's 3300 Essex Drive is a single-story data center in Richardson, Texas, that Stream Data Centers developed in 2010-11 and leased to a major healthcare provider.

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake
[Goodman Group](https://baxtel.com/data-centers/goodman-group) and [Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) moved to buy up to 9.9% of Australian operator [NEXTDC](htt...

Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake

November 05, 2026 NEXTDC

Goodman Group and Digital Realty moved to buy up to 9.9% of Australian operator NEXTDC at a 45.5% premium to the previous close. The buyers offered A$9.50 a share through an aftermarket bookbuild, a purchase Reuters valued at about A$715 million (US$501 million) after reviewing the term sheet....

Read more
Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) wants to build its first [Indiana](https://baxtel.com/regions/indiana) data centers in Kokomo, proposing a three-building camp...

Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana

October 17, 2026 Digital Realty Trust

Digital Realty wants to build its first Indiana data centers in Kokomo, proposing a three-building campus with roughly 1GW of IT capacity on 476 acres of greenfield land. The global REIT published a project page for the development after city officials confirmed its interest earlier this month,...

Read more
Read Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site...

Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

October 16, 2026 Digital Realty Trust

Digital Realty is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site plan that calls for roughly 1GW of IT capacity and completion in 2033. The company published the details on its Kokomo project page, and Kokomo Mayor Tyler...

Read more
Read Digital Realty Completes Structural Topping-Out of Second Seoul Data Center
Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027.

“The topping out isn't just a constr...

Digital Realty Completes Structural Topping-Out of Second Seoul Data Center

October 15, 2026 Digital Realty Trust

Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027. “The topping out isn't just a construction milestone; it's a powerful symbol of what happens when incredible teams come together to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.