QumulusAI: Denton, TX

Latest Podcast Western Blvd
Planned
Future facility in planning stage
Operated by:

QumulusAI: Denton, TX

Year Planned: 2028
Utility Provider: Denton Municipal Electric
Lot Size: 4 acres

QumulusAI plans a modular data center of up to eight prefabricated pods on about four acres of city-leased land near Western Boulevard in Denton, beside Denton Municipal Electric's RD Wells substation. The Denton City Council approved the lease and a power agreement in August 2024, and the specific use permit in January 2026. The project is funded through a $500 million facility arranged in late 2025, and operations are expected to begin in 2028.

Site History

  • January 2026: Denton approves the specific use permit.
  • August 2024: Denton approves the land lease and power agreement.

Map and Nearby Locations

Western Blvd
QumulusAI Sites
Nearby Facilities

QumulusAI: Denton, TX Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of QumulusAI: Denton, TX

Distance Site About
1.78 miles CoreWeave: Denton (Core Scientific)
CoreWeave is the high-performance computing tenant of Core Scientific's converted Denton campus beside the Denton Energy Center.
1.79 miles Core Scientific: Denton, TX
Core Scientific's Denton campus has been converted from bitcoin mining to a high-performance computing campus leased to CoreWeave.
14.43 miles Citigroup Fort Worth
Citigroup's South West Data Center is one of the bank's main US enterprise data centers, on Litsey Road in the AllianceTexas corridor north of Fort Worth.
15.83 miles QTS: FTW1-DC1
FTW1-DC1 is the original building on QTS's Fort Worth campus near AllianceTexas, a former Health Care Service Corporation data center that QTS bought in 2017.
15.91 miles QTS: FTW1-DC2
FTW1-DC2 is the second building on QTS's Fort Worth campus near AllianceTexas, a two-story, $220 million data center completed in 2026.
15.96 miles Colovore: Fort Worth DFW02
Colovore's second Dallas-market facility, a purpose-built liquid-cooled colocation building on Heritage Parkway in north Fort Worth. Four-hall design following Colovore's standard high-density spec-build template, with service dates running late 2027 through 2028.
15.99 miles QTS: FTW1 Expansion
QTS is adding a two-story, $300 million data hall expansion to FTW1-DC1 on its Fort Worth campus near AllianceTexas.
16.21 miles Central RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.27 miles STACK Fort Worth Alliance
STACK Infrastructure, Hillwood and IPI Partners announced a hyperscale data center campus at AllianceTexas in north Fort Worth in 2019, but STACK dropped it without building.
16.33 miles Tierpoint Fort Worth
TierPoint's Dallas-Fort Worth data center occupies the former Alliance Gateway / AIG facility on Independence Parkway in north Fort Worth. The site is built for high-density AI and HPC workloads, with direct-to-chip liquid cooling in production alongside air and chilled-water cooling. TierPoint is expanding the utility supply to the site and has room for further phases along the existing building line.
16.35 miles Verizon: Southlake NEC Data Center
Verizon runs a network and data center campus on West Dove Road in Southlake, north of DFW Airport, where a 2022-approved data hall expansion has not been built.
16.57 miles PowerHouse: Circle T Campus
PowerHouse Data Centers plans a four-building data center campus on about 88 acres of Hillwood's Circle T Ranch in Westlake, north of Fort Worth.
17.49 miles Digital Realty: DFW44
DFW44 is a single-story Digital Realty data center at 2501 Edmonds Lane in Lewisville, Texas, built to suit for a financial-services tenant and owned in a joint venture with Mitsubishi Corporation.
17.50 miles Wells Fargo: Lewisville (Digital Realty DFW44)
Wells Fargo occupies Digital Realty's DFW44 data center in Lewisville, Texas, a building owned by a Digital Realty and Mitsubishi joint venture.
17.84 miles Digital Realty: DFW26
Digital Realty's DFW26 is the Convergence campus in Lewisville, Texas, a former Texas Instruments plant converted into ten connected buildings for data center, office and lab tenants.
17.87 miles Lightedge: Dallas (Lewisville)
LightEdge leases a suite in CyrusOne's Lewisville DFW2 data center north of Dallas.
17.88 miles CyrusOne: Lewisville DFW2
Two independent power grids Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
19.76 miles Rackspace Grapevine DFW1
Rackspace ran its DFW1 data center in a Grapevine industrial building until late 2018, when it moved customers to its Richardson DFW3 facility.

QumulusAI: Denton, TX Data Center Photos See all

Site for QumulusAI's data center in Denton, TX
Source: Baxtel

Operating Company

Operated by:

QumulusAI operates as a fully integrated AI infrastructure solution, managing the complete technology stack from high-performance computing clouds to both on- and off-grid data centers. These facilities utilize natural gas generation to provide power. The company provides scalable, energy-efficient solutions designed to remove computational bottlenecks in AI development, offering enterprises and innovators consistent access to necessary compute resources.

By utilizing QumulusAI, development teams can accelerate model training, optimize deployment strategies, and expand the current boundaries of AI innovation.

0
Facilities
0
Markets

News See all

Read Equinix Affiliate Files for $500M DA13 Data Center in Dallas
An affiliate of [Equinix](https://baxtel.com/data-centers/equinix) has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The applicati...

Equinix Affiliate Files for $500M DA13 Data Center in Dallas

November 16, 2026 Equinix

An affiliate of Equinix has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The application puts a four-story, 372,445-square-foot building at 1520 West Mockingbird Lane, in an industrial area near Love Field, as Data Center...

Read more
Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read DataBank Raises $2bn for Dallas Data Center Buildout
DataBank Raises $2bn for Dallas Data Center Buildout

DataBank Raises $2bn for Dallas Data Center Buildout

April 22, 2026 Dallas

US data center firm DataBank has secured new financing to support the build-out of three data centers in Dallas, Texas. The company this week announced it has obtained a $2 billion loan to fund construction of the first three facilities at its new Red Oak campus. DataBank said the deal represents...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.