QumulusAI: Denton, TX

Latest Podcast Jim Christal Road
Under ConstructionPlanned
Multi-phase construction project
Operated by:

QumulusAI: Denton, TX

Site planned for 2027 and has expansions through 2028
PUE: 1.1
Lot Size: 4 acres

In January 2026, QumulusAI received approval for a modular data center in Denton, Texas. Located on four acres near Western Boulevard and Jim Christal Road, the facility will house eight prefabricated "pods" designed for AI and cryptomining. To ensure efficiency, the site will use a water-free, closed-loop fluid cooling system and aim for a PUE of 1.1. The project is funded by a $500 million blockchain-backed facility secured by the company in late 2025.

Map and Nearby Locations

Jim Christal Road
QumulusAI Sites
Nearby Facilities

QumulusAI: Denton, TX Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of QumulusAI: Denton, TX

Distance Site About
1.91 miles Core Scientific: Denton, TX
Core Scientific plans to spend as much as $6.1 billion to refurbish its data center in Denton, Texas, turning it from a crypto facility into an AI site.
11.97 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.07 miles South ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.43 miles Citigroup Fort Worth
15.83 miles QTS: FTW1-DC1
QTS's Forth Worth site is the company's second data center in Dallas Market.
15.91 miles QTS: FTW1-DC2
QTS Data Centers is building a second data center adjacent to its first one near the Alliance Texas development. The two-story building is set to span 471,875 sq ft (43,840 sqm) and see $220 million invested in the project.
15.96 miles Colovore: Fort Worth DFW02
Colovore's second Dallas-market facility, a purpose-built liquid-cooled colocation building on Heritage Parkway in north Fort Worth. Four-hall design following Colovore's standard high-density spec-build template, with service dates running late 2027 through 2028.
15.99 miles QTS: FTW1 Expansion
QTS is expanding its Fort Worth data center campus for the third time with a $300 million, 147,946-square-foot addition at 14100 Park Vista Boulevard.
16.11 miles EdgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.27 miles STACK Fort Worth Alliance
STACK's expansion Alliance campus in Fort Worth
16.33 miles Tierpoint Fort Worth
TierPoint's Dallas-Fort Worth data center occupies the former Alliance Gateway / AIG facility on Independence Parkway in north Fort Worth. The site is built for high-density AI and HPC workloads, with direct-to-chip liquid cooling in production alongside air and chilled-water cooling. TierPoint is expanding the utility supply to the site and has room for further phases along the existing building line.
16.57 miles PowerHouse: Circle T Campus
PowerHouse Data Centers is expanding its Texas footprint with plans for the Circle T Data Center, a campus spanning nearly 88 acres in Westlake, just north of Fort Worth.
16.98 miles South TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.08 miles Ridge ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.08 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.09 miles Core StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.09 miles Valley ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.12 miles Center UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.14 miles North RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.17 miles West StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.36 miles TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.49 miles Digital Realty: Project Gold Lewisville
Digital Realty's Project Gold is located on Edmonds Lane in Lewisville. The project consists of a single-story shell data center with space for three data halls on a 182,969 sq ft (17,000 sqm) site.
17.84 miles Digital Realty: DFW26
In 2012, Digital Realty Trust acquired the Convergence Business Park, an 831,400 square-foot data center and office campus in the Dallas suburb of Lewisville, Texas.
17.87 miles Lightedge: Dallas (Lewisville)
LightEdge leases space from CyrusOne Lewisville DFW2.
17.88 miles CyrusOne: Lewisville DFW2
Two independent power grids Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
19.76 miles Rackspace Grapevine DFW1

QumulusAI: Denton, TX Data Center Photos See all

Site for QumulusAI's data center in Denton, TX
Source: Baxtel

Operating Company

Operated by:

QumulusAI operates as a fully integrated AI infrastructure solution, managing the complete technology stack from high-performance computing clouds to both on- and off-grid data centers. These facilities utilize natural gas generation to provide power. The company provides scalable, energy-efficient solutions designed to remove computational bottlenecks in AI development, offering enterprises and innovators consistent access to necessary compute resources.

By utilizing QumulusAI, development teams can accelerate model training, optimize deployment strategies, and expand the current boundaries of AI innovation.

0
Facilities
0
Markets

News See all

Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management node...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read DataBank Raises $2bn for Dallas Data Center Buildout
DataBank Raises $2bn for Dallas Data Center Buildout

DataBank Raises $2bn for Dallas Data Center Buildout

April 22, 2026 Dallas

US data center firm DataBank has secured new financing to support the build-out of three data centers in Dallas, Texas. The company this week announced it has obtained a $2 billion loan to fund construction of the first three facilities at its new Red Oak campus. DataBank said the deal represents...

Read more
Read Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park
Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park

Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park

June 18, 2025 Dallas

Cawley Partners has acquired 5,200 acres south of Dallas to potentially develop a large data center park outside Dallas. The acquired South Creek Ranch in the City of Ferris is set to see a mix of uses, including data centers, logistics, manufacturing, and residential. “This particular piece of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?