CoreWeave: Denton (Core Scientific)

Latest Podcast 8171 Jim Christal Rd
Operational
Fully operational facility
Operated by:

CoreWeave: Denton (Core Scientific)

Year Built: 2025
Utility Provider: Denton Municipal Electric
Ownership: CoreWeave does not own the building.
This site is leased from Core Scientific in the Core Scientific: Denton, TX building
░░░░░ Request Dataset MW
Operational Power

CoreWeave leases the data halls of Core Scientific's Denton campus, a former bitcoin mining site beside the Denton Energy Center that Core Scientific converted for high-performance computing in 2024-26. Denton North went fully live in early 2026, and the Denton South halls followed during 2026. CoreWeave agreed to buy Core Scientific in 2025, but Core Scientific's shareholders voted the deal down in October 2025.

Site History

  • 2026: The Denton South halls come online.
  • Early 2026: Denton North is fully live.
  • October 2025: Shareholders reject the CoreWeave merger.

Map and Nearby Locations

8171 Jim Christal Rd
CoreWeave Sites
Nearby Facilities

CoreWeave: Denton (Core Scientific) Power Growth Over Time

+191% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of CoreWeave: Denton (Core Scientific)

Distance Site About
0.02 miles Core Scientific: Denton, TX
Core Scientific's Denton campus has been converted from bitcoin mining to a high-performance computing campus leased to CoreWeave.
1.78 miles QumulusAI: Denton, TX
QumulusAI plans a modular data center of up to eight pods on city-leased land beside Denton's RD Wells substation, with operations expected in 2028.
14.72 miles Citigroup Fort Worth
Citigroup's South West Data Center is one of the bank's main US enterprise data centers, on Litsey Road in the AllianceTexas corridor north of Fort Worth.
15.94 miles Colovore: Fort Worth DFW02
Colovore's second Dallas-market facility, a purpose-built liquid-cooled colocation building on Heritage Parkway in north Fort Worth. Four-hall design following Colovore's standard high-density spec-build template, with service dates running late 2027 through 2028.
16.06 miles QTS: FTW1-DC1
FTW1-DC1 is the original building on QTS's Fort Worth campus near AllianceTexas, a former Health Care Service Corporation data center that QTS bought in 2017.
16.15 miles QTS: FTW1-DC2
FTW1-DC2 is the second building on QTS's Fort Worth campus near AllianceTexas, a two-story, $220 million data center completed in 2026.
16.20 miles QTS: FTW1 Expansion
QTS is expanding its Fort Worth data center campus for the third time with a $300 million, 147,946-square-foot addition at 14100 Park Vista Boulevard.
16.45 miles Center UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.55 miles STACK Fort Worth Alliance
STACK Infrastructure, Hillwood and IPI Partners announced a hyperscale data center campus at AllianceTexas in north Fort Worth in 2019, but STACK dropped it without building.
16.62 miles Tierpoint Fort Worth
TierPoint's Dallas-Fort Worth data center occupies the former Alliance Gateway / AIG facility on Independence Parkway in north Fort Worth. The site is built for high-density AI and HPC workloads, with direct-to-chip liquid cooling in production alongside air and chilled-water cooling. TierPoint is expanding the utility supply to the site and has room for further phases along the existing building line.
16.93 miles PowerHouse: Circle T Campus
PowerHouse Data Centers plans a four-building data center campus on about 88 acres of Hillwood's Circle T Ranch in Westlake, north of Fort Worth.
17.20 miles Verizon: Southlake NEC Data Center
Verizon runs a network and data center campus on West Dove Road in Southlake, north of DFW Airport, where a 2022-approved data hall expansion has not been built.
19.00 miles Digital Realty: DFW44
DFW44 is a single-story Digital Realty data center at 2501 Edmonds Lane in Lewisville, Texas, built to suit for a financial-services tenant and owned in a joint venture with Mitsubishi Corporation.
19.35 miles Digital Realty: DFW26
Digital Realty's DFW26 is the Convergence campus in Lewisville, Texas, a former Texas Instruments plant converted into ten connected buildings for data center, office and lab tenants.
19.39 miles Lightedge: Dallas (Lewisville)
LightEdge leases a suite in CyrusOne's Lewisville DFW2 data center north of Dallas.
19.40 miles CyrusOne: Lewisville DFW2
Two independent power grids Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)

Operating Company

Operated by:

CoreWeave is a specialized cloud provider, delivering a massive scale of GPU compute resources.

An NVIDIA Elite Cloud Solutions Provider for Compute and Visualization, CoreWeave builds cloud solutions for compute intensive use cases - VFX and Rendering, Machine Learning and AI, Batch Processing, and Pixel Streaming.

0
Facilities
0
Markets

News See all

Read CoreWeave Brings 22.5MW Online at atNorth's Copenhagen Data Center
CoreWeave has brought most of its planned 22.5MW of IT capacity online at [atNorth](https://baxtel.com/data-centers/atnorth)'s [DEN01](https://baxtel.com/data-center/atnorth-den01) data center in t...

CoreWeave Brings 22.5MW Online at atNorth's Copenhagen Data Center

October 27, 2026 CoreWeave

CoreWeave has brought most of its planned 22.5MW of IT capacity online at atNorth's DEN01 data center in the Copenhagen metro, its first deployment in Denmark. The company announced the activation from London on October 27. atNorth owns and operates DEN01, a colocation site in Ballerup,...

Read more
Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read CoreWeave Enters India With 240MW AdaniConneX Lease In Navi Mumbai
CoreWeave will lease 240MW of data center capacity in Navi Mumbai from AdaniConneX, marking the AI cloud provider's first deployment in India. The companies [announced the plan](https://www.corewea...

CoreWeave Enters India With 240MW AdaniConneX Lease In Navi Mumbai

October 08, 2026 CoreWeave

CoreWeave will lease 240MW of data center capacity in Navi Mumbai from AdaniConneX, marking the AI cloud provider's first deployment in India. The companies announced the plan on October 6, with the first phase due online in the middle of 2028. CoreWeave (Nasdaq: CRWV) takes the whole of...

Read more
Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.