QTS: FTW1-DC1

Latest Podcast 14100 Park Vista Boulevard
Operational
Fully operational facility
Operated by:

QTS: FTW1-DC1

Short Code: FTW1-DC1
Year Built: 2009
Utility Provider: Oncor
Ownership: QTS Data Centers owns the building.
Lot Size: 31 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

FTW1-DC1 is the first building on QTS's 52-acre Fort Worth campus in the AllianceTexas area. Health Care Service Corporation (HCSC) built it as a corporate data center and sold it to QTS in 2017, keeping space in the building under a lease. The campus has an owned, expandable on-site substation. QTS added a two-story tape-storage wing in 2019-2020. A two-story data hall addition, first filed in 2025 and refiled in 2026, is tracked as QTS: FTW1 Expansion.

Site History

  • 2026: QTS refiles a two-story expansion of the building.
  • 2019-2020: QTS adds a two-story tape-storage wing.
  • 2017: QTS buys the data center from HCSC for about $50 million.
  • 2009-2010: HCSC builds the data center.

Map and Nearby Locations

14100 Park Vista Boulevard
QTS Data Centers Sites
Nearby Facilities

QTS: FTW1-DC1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of QTS: FTW1-DC1

Distance Site About
0.09 miles QTS: FTW1-DC2
FTW1-DC2 is the second building on QTS's Fort Worth campus near AllianceTexas, a two-story, $220 million data center completed in 2026.
0.21 miles QTS: FTW1 Expansion
QTS is adding a two-story, $300 million data hall expansion to FTW1-DC1 on its Fort Worth campus near AllianceTexas.
0.39 miles Station UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.65 miles STACK Fort Worth Alliance
STACK Infrastructure, Hillwood and IPI Partners announced a hyperscale data center campus at AllianceTexas in north Fort Worth in 2019, but STACK dropped it without building.
0.72 miles Tierpoint Fort Worth
TierPoint's Dallas-Fort Worth data center occupies the former Alliance Gateway / AIG facility on Independence Parkway in north Fort Worth. The site is built for high-density AI and HPC workloads, with direct-to-chip liquid cooling in production alongside air and chilled-water cooling. TierPoint is expanding the utility supply to the site and has room for further phases along the existing building line.
1.40 miles PowerHouse: Circle T Campus
PowerHouse Data Centers plans a four-building data center campus on about 88 acres of Hillwood's Circle T Ranch in Westlake, north of Fort Worth.
1.46 miles Citigroup Fort Worth
Citigroup's South West Data Center is one of the bank's main US enterprise data centers, on Litsey Road in the AllianceTexas corridor north of Fort Worth.
2.34 miles Colovore: Fort Worth DFW02
Colovore's second Dallas-market facility, a purpose-built liquid-cooled colocation building on Heritage Parkway in north Fort Worth. Four-hall design following Colovore's standard high-density spec-build template, with service dates running late 2027 through 2028.
6.04 miles Verizon: Southlake NEC Data Center
Verizon runs a network and data center campus on West Dove Road in Southlake, north of DFW Airport, where a 2022-approved data hall expansion has not been built.
9.18 miles D.R. Horton: Fort Worth Data Center
D.R. Horton runs a company data center in its division office campus on North Freeway in north Fort Worth.
9.38 miles Coravel: Hicks Field Expansion
Coravel's Hicks Field Expansion covers the last two of five planned buildings on its hyperscale campus on Hicks Field Road in far north Fort Worth.
9.51 miles Cloud ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.52 miles Coravel: Hicks Field DFW12
Coravel's Hicks Field DFW12 is a planned two-story data center on its hyperscale campus on Hicks Field Road in far north Fort Worth.
9.60 miles BNSF: Fort Worth Data Center
BNSF Railway runs a company data center on its headquarters campus in north Fort Worth.
9.61 miles CyrusOne: Fort Worth Expansion
Later phases of CyrusOne's Fort Worth campus on Asphalt Drive, planned with energy developer Eolian beyond the DFW7 and DFW8 buildings.
9.73 miles Prime PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.75 miles Edge RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.75 miles Coravel: Hicks Field DFW13
Coravel's Hicks Field DFW13 is a planned two-story data center on its hyperscale campus on Hicks Field Road in far north Fort Worth.
9.76 miles CyrusOne: DFW7
DFW7 is the first building on CyrusOne's Fort Worth campus on Asphalt Drive, on land bought from energy developer Eolian beside its Chisholm Grid battery plant.
9.77 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.79 miles Coravel: Hicks Field DFW11
Coravel's Hicks Field DFW11 is the first building of its hyperscale data center campus on Hicks Field Road in far north Fort Worth, under construction for a hyperscale tenant.
9.81 miles Rackspace Grapevine DFW1
Rackspace ran its DFW1 data center in a Grapevine industrial building until late 2018, when it moved customers to its Richardson DFW3 facility.
9.84 miles CyrusOne: DFW8
DFW8 is the second building under way on CyrusOne's Fort Worth campus on Asphalt Drive, beside DFW7.
10.05 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.50 miles Verizon: Euless Switching Center
Verizon Wireless's Euless switching center is a windowless network building on Bear Creek Parkway near DFW Airport, opened in 2021, that also hosts Amazon Web Services equipment.
14.74 miles Digital Realty: DFW44
DFW44 is a single-story Digital Realty data center at 2501 Edmonds Lane in Lewisville, Texas, built to suit for a financial-services tenant and owned in a joint venture with Mitsubishi Corporation.
14.75 miles Wells Fargo: Lewisville (Digital Realty DFW44)
Wells Fargo occupies Digital Realty's DFW44 data center in Lewisville, Texas, a building owned by a Digital Realty and Mitsubishi joint venture.
14.87 miles UT System: Arlington Regional Data Center
The University of Texas System runs its Arlington Regional Data Center on East Loop 820 in east Fort Worth as a shared colocation facility for its campuses.
15.02 miles Digital Realty: DFW26
Digital Realty's DFW26 is the Convergence campus in Lewisville, Texas, a former Texas Instruments plant converted into ten connected buildings for data center, office and lab tenants.
15.19 miles Lightedge: Dallas (Lewisville)
LightEdge leases a suite in CyrusOne's Lewisville DFW2 data center north of Dallas.
15.20 miles CyrusOne: Lewisville DFW2
Two independent power grids Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
15.52 miles DTCC: Coppell
DTCC runs a data center complex in a former PSINet technical building on Crestside Drive in Coppell, north of Dallas.
15.61 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.83 miles QumulusAI: Denton, TX
QumulusAI plans a modular data center of up to eight pods on city-leased land beside Denton's RD Wells substation, with operations expected in 2028.
16.04 miles Core Scientific: Denton, TX
Core Scientific's Denton campus has been converted from bitcoin mining to a high-performance computing campus leased to CoreWeave.
16.06 miles CoreWeave: Denton (Core Scientific)
CoreWeave is the high-performance computing tenant of Core Scientific's converted Denton campus beside the Denton Energy Center.
16.53 miles Lumen Fort Worth 2
Lumen Fort Worth 2 is a Lumen network building at 1101 East 9th Street in Fort Worth, built in 1998 for IXC Communications.
16.61 miles Centersquare: Fort Worth DFW1
Csquare's Fort Worth DFW1 is a colocation campus in the CentrePort business park near DFW Airport, built by Exodus around 2000 and owned by Csquare since 2025.
16.61 miles Voltage Park: Fort Worth (Csquare DFW1)
Voltage Park runs a GPU cloud deployment inside Csquare's DFW1 colocation campus at CentrePort in Fort Worth.
16.65 miles Hub UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.77 miles Lumen For Worth 3
Lumen Fort Worth 3 is a Lumen network site in a 1925 office tower at 515 Houston Street in downtown Fort Worth.
16.80 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.93 miles LOGIX Fort Worth
LOGIX Fiber Networks ran a small colocation suite in the Oil & Gas Building on West 7th Street in downtown Fort Worth, which it stopped marketing in 2024.
17.01 miles AT&T: Fort Worth Edison
AT&T's Edison building on Houston Street is the main telephone exchange in downtown Fort Worth, a multi-story Southwestern Bell building from 1971 that also hosts AT&T cloud equipment.
17.03 miles Lumen Fort Worth 1
Lumen Fort Worth 1 is a Lumen network colocation site at 1601 Jones Street in downtown Fort Worth.
17.14 miles Cloudnium: Irving
Cloudnium is converting a 1981 technical building on West Campus Circle Drive in Las Colinas, Irving, into a colocation data center and its headquarters.
17.18 miles QTS Irving DC1
QTS's first Dallas-area data center occupies the former Maxim semiconductor plant in Irving, Texas, and holds the campus's DC1 and DC2 data halls.
17.19 miles Cogent: Fort Worth
Cogent's Fort Worth data center is a former Sprint long-distance switching center on East Presidio Street, which Cogent offers for sale or wholesale lease.
17.31 miles Tower PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.32 miles QTS: Irving DC6
DC6 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in late 2025 and fitted out for Microsoft in 2026.
17.32 miles QTS Irving DC3
DC3 is a multi-story data center on QTS's Irving campus in Las Colinas, occupied by Microsoft, with an on-site substation and diverse campus fiber entrances.
17.34 miles Ridge MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.37 miles Edge ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.38 miles QTS: Irving DC4
DC4 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in 2024 and fitted out for Microsoft in 2025.
17.40 miles QTS: Irving DC5
DC5 is a two-story, $180 million data center on QTS's Irving campus in Las Colinas, completed in 2025 and occupied by Microsoft.
17.42 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.51 miles D.R. Horton: Arlington Data Center
D.R. Horton built its own data center next to its headquarters area in Arlington, Texas, completed in 2022.
18.98 miles DataCanopy: Carrollton, TX
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
19.02 miles CyrusOne Carrollton
CyrusOne's DFW1 in Carrollton is one of the largest data centers in Texas, a building CyrusOne bought in 2012 and converted to data center use in phases.
19.69 miles PowerHouse: Irving Bldg-C
Building C is the third of three powered-shell data centers PowerHouse Data Centers and Harrison Street plan on a 50-acre former distribution site in Las Colinas, Irving.
19.77 miles PowerHouse: Irving Bldg-B
Building B is the second of three powered-shell data centers PowerHouse Data Centers and Harrison Street plan on a 50-acre former distribution site in Las Colinas, Irving.
19.84 miles PowerHouse: Irving Bldg-A
PowerHouse is developing its first Irving data center campus at 111 Customer Way, Irving, Texas, on a 50-acre site in the Las Colinas area. The project is a multi-phase, three-building development totaling 946,000 sq ft, with construction underway and the first building structurally completed in March 2026.

Operating Company

Operated by:

QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.

QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.

History:

  • On August 31, 2021 funds managed by Blackstone completed the acquisition of QTS Realty Trust.
  • April 30, 2019: Acquired two operating data centers in Groningen and Eemshaven, Netherlands, for approximately $44 million.
  • June 2015: QTS acquires Carpathis Hosting for $326 million. The transaction increases QTS's ability to serve IaaS and Government clients. Additionally the transaction provides a number of deployments within Equinix facilities.
  • July 8, 2014: Acquired the former Chicago Sun-Times printing plant for conversion to a data center.
  • June 30, 2014: Acquired the Princeton, New Jersey data center from McGraw Hill Financial.
  • 2013: Went public (IPO) and started trading under the symbol QTS on the NYSE.
  • 2010 Acquired their Richmond facility
  • 2005 QTS acquired Atlanta Suwanee data center
  • 2003: Company acquired its first data center in Overland Park, KS
  • 2003: QTS was founded by Chad Williams with its first data center in Overland Park in Kansas
0
Facilities
0
Markets

News See all

Read Equinix Affiliate Files for $500M DA13 Data Center in Dallas
An affiliate of [Equinix](https://baxtel.com/data-centers/equinix) has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The applicati...

Equinix Affiliate Files for $500M DA13 Data Center in Dallas

November 16, 2026 Equinix

An affiliate of Equinix has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The application puts a four-story, 372,445-square-foot building at 1520 West Mockingbird Lane, in an industrial area near Love Field, as Data Center...

Read more
Read Colorado Regulators Allege QTS Built Aurora Data Centers Without Air Permits
Colorado's Air Pollution Control Division (APCD) alleges [QTS Data Centers](https://baxtel.com/data-centers/qts-data-centers) built new data centers at its Aurora campus without the required state ...

Colorado Regulators Allege QTS Built Aurora Data Centers Without Air Permits

November 11, 2026 QTS Data Centers

Colorado's Air Pollution Control Division (APCD) alleges QTS Data Centers built new data centers at its Aurora campus without the required state air permits. The October notice of violation, reported by CPR News on Nov. 10, covers the two buildings QTS is adding at 1160 North Gun Club Road in...

Read more
Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.