|
0.07 miles
|
Tierpoint Fort Worth
|
The property came to market in 2023 and was acquired by Tierpoint.
|
|
0.43 miles
|
Hyperscale Data Center
Request Dataset
|
When completed, the Fort Worth site will be Facebook’s largest data center to date, four buildings connected to form two “H” shapes, plus one standalone center, for a total of 20 data hall
|
|
0.59 miles
|
QTS: FTW1-DC2
|
QTS Data Centers is building a second data center adjacent to its first one near the Alliance Texas development. The two-story building is set to span 471,875 sq ft (43,840 sqm) and see $220 million invested in the project.
|
|
0.65 miles
|
QTS Dallas Fort Worth
|
QTS's Forth Worth site is the company's second data center in Dallas Market.
|
|
1.84 miles
|
Citigroup Fort Worth
|
|
|
4.57 miles
|
Hyperscale Data Center
Request Dataset
|
Google has officially backed out of its plans for the Northlake Logistics Park in Denton County, marking a strategic shift away from the previously leased 1-million-square-foot facility.
|
|
4.68 miles
|
Hyperscale Data Center
Request Dataset
|
Google has officially backed out of its plans for the Northlake Logistics Park in Denton County, marking a strategic shift away from the previously leased 1-million-square-foot facility.
|
|
9.27 miles
|
Rackspace Grapevine DFW1
|
|
|
9.53 miles
|
ACS: Fort Worth Expansion
|
|
|
9.68 miles
|
ACS: Fort Worth, Texas
|
The proposed development, located on a 107-acre site near Hicks Field Road, will feature five buildings and an associated substation.
|
|
9.85 miles
|
CyrusOne: DFW7
|
Dubbed DFW7, the project will encompass 1.9 million square feet and feature multiple buildings.
|
|
14.44 miles
|
Digital Realty: Project Gold Lewisville
|
Digital Realty's Project Gold is located on Edmonds Lane in Lewisville. The project consists of a single-story shell data center with space for three data halls on a 182,969 sq ft (17,000 sqm) site.
|
|
14.71 miles
|
Digital Realty: DFW26
|
In 2012, Digital Realty Trust acquired the Convergence Business Park, an 831,400 square-foot data center and office campus in the Dallas suburb of Lewisville, Texas.
|
|
14.88 miles
|
Lightedge: Dallas (Lewisville)
|
LightEdge leases space from CyrusOne Lewisville DFW2.
|
|
14.89 miles
|
CyrusOne: Lewisville DFW2
|
Two independent power grids
Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
|
|
15.98 miles
|
Centersquare: Fort Worth DFW1
|
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.
|
|
16.07 miles
|
Lumen Fort Worth 2
|
|
|
16.27 miles
|
QumulusAI: Denton, TX
|
Located on four acres near Western Boulevard and Jim Christal Road, the facility will house eight prefabricated "pods" designed for AI and cryptomining.
|
|
16.33 miles
|
Lumen For Worth 3
|
|
|
16.36 miles
|
Carrier-Neutral Data Center
Request Dataset
|
H5 Data Centers is launching a new multi-phase development in the Dallas-Fort Worth metroplex, with Phase 1 officially greenlit for pre-leasing.
|
|
16.39 miles
|
QTS: DFW2-DC4
|
QTS is developing a 413,726-square-foot data center in a two-story building, featuring office and shell data hall space, in Fort Worth.
|
|
16.44 miles
|
Core Scientific: Denton, TX
|
Core Scientific plans to spend as much as $6.1 billion to refurbish its data center in Denton, Texas, turning it from a crypto facility into an AI site.
|
|
16.49 miles
|
LOGIX Fort Worth
|
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
|
|
16.57 miles
|
Lumen Fort Worth 1
|
|
|
16.66 miles
|
QTS Irving
|
In 2013 QTS acquired the former Maxim semiconductor plant. It was QTS's first data center in the Dallas market
|
|
16.80 miles
|
QTS Irving DC3
|
The QTS Irving 1 DC3 facility will provide our customers with an on-site substation and diverse campus fiber entrances with a redundant campus conduit system.
|
|
16.80 miles
|
QTS: Irving DC6
|
QTS Irving DC6 is located in the Irving area of Dallas, Texas.
|
|
16.83 miles
|
QTS: Irving DC5
|
QTS Irving DC5 is located in the Irving area of Dallas, Texas.
|
|
16.85 miles
|
QTS: Irving DC4
|
QTS Data Centers is building the Irving DC4 facility at 3 Longhorn Drive, Irving, TX.
|
|
18.65 miles
|
DataCanopy: Carrollton, TX
|
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
|
|
18.68 miles
|
CyrusOne Carrollton
|
60,000 SqFt of Office Space
Power Density: 150–200+ watts/SqFt
|
|
19.16 miles
|
PowerHouse: Irving, TX
|
PowerHouse is developing its first Irving data center campus at 111 Customer Way, Irving, Texas, on a 50-acre site in the Las Colinas area. The project is a multi-phase, three-building development totaling 946,000 sq ft, with construction underway and the first building structurally completed in March 2026.
|
|
19.27 miles
|
PowerHouse: Irving DC2
|
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
|
19.37 miles
|
PowerHouse: Irving DC3
|
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
|
19.44 miles
|
Hyperscale Data Center
Request Dataset
|
|