STACK Fort Worth Alliance

Latest Podcast AllianceTexas
Withdrawn
Project cancelled before construction
Operated by:

STACK Fort Worth Alliance

Short Code: DFW01
Year Built: 2022

In January 2019 STACK Infrastructure, Hillwood and IPI Partners announced a joint venture to develop a hyperscale data center campus at AllianceTexas, Hillwood's master-planned development in north Fort Worth. They set aside more than 400 acres for data centers and marketed ten pad sites of 11 to 228 acres, served by Brazos Electric and Oncor. STACK stopped marketing the campus between 2022 and 2023, and no data center was built.

Site History

  • 2022-23: STACK drops the AllianceTexas campus from its website.
  • July 2020: STACK markets ten pad sites in a campus brochure.
  • January 17, 2019: STACK, Hillwood and IPI Partners announce the partnership.

Map and Nearby Locations

AllianceTexas
STACK INFRASTRUCTURE Sites
Nearby Facilities

STACK Fort Worth Alliance Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of STACK Fort Worth Alliance

Distance Site About
0.07 miles Tierpoint Fort Worth
TierPoint's Dallas-Fort Worth data center occupies the former Alliance Gateway / AIG facility on Independence Parkway in north Fort Worth. The site is built for high-density AI and HPC workloads, with direct-to-chip liquid cooling in production alongside air and chilled-water cooling. TierPoint is expanding the utility supply to the site and has room for further phases along the existing building line.
0.40 miles Valley TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.59 miles QTS: FTW1-DC2
FTW1-DC2 is the second building on QTS's Fort Worth campus near AllianceTexas, a two-story, $220 million data center completed in 2026.
0.65 miles QTS: FTW1-DC1
FTW1-DC1 is the original building on QTS's Fort Worth campus near AllianceTexas, a former Health Care Service Corporation data center that QTS bought in 2017.
0.69 miles QTS: FTW1 Expansion
QTS is adding a two-story, $300 million data hall expansion to FTW1-DC1 on its Fort Worth campus near AllianceTexas.
0.77 miles PowerHouse: Circle T Campus
PowerHouse Data Centers plans a four-building data center campus on about 88 acres of Hillwood's Circle T Ranch in Westlake, north of Fort Worth.
1.84 miles Citigroup Fort Worth
Citigroup's South West Data Center is one of the bank's main US enterprise data centers, on Litsey Road in the AllianceTexas corridor north of Fort Worth.
2.87 miles Colovore: Fort Worth DFW02
Colovore's second Dallas-market facility, a purpose-built liquid-cooled colocation building on Heritage Parkway in north Fort Worth. Four-hall design following Colovore's standard high-density spec-build template, with service dates running late 2027 through 2028.
5.62 miles Verizon: Southlake NEC Data Center
Verizon runs a network and data center campus on West Dove Road in Southlake, north of DFW Airport, where a 2022-approved data hall expansion has not been built.
8.81 miles D.R. Horton: Fort Worth Data Center
D.R. Horton runs a company data center in its division office campus on North Freeway in north Fort Worth.
9.27 miles BNSF: Fort Worth Data Center
BNSF Railway runs a company data center on its headquarters campus in north Fort Worth.
9.27 miles Rackspace Grapevine DFW1
Rackspace ran its DFW1 data center in a Grapevine industrial building until late 2018, when it moved customers to its Richardson DFW3 facility.
9.36 miles Coravel: Hicks Field Expansion
Coravel's Hicks Field Expansion covers the last two of five planned buildings on its hyperscale campus on Hicks Field Road in far north Fort Worth.
9.47 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.48 miles Ridge ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.50 miles Coravel: Hicks Field DFW12
Coravel's Hicks Field DFW12 is a planned two-story data center on its hyperscale campus on Hicks Field Road in far north Fort Worth.
9.57 miles CyrusOne: Fort Worth Expansion
Later phases of CyrusOne's Fort Worth campus on Asphalt Drive, planned with energy developer Eolian beyond the DFW7 and DFW8 buildings.
9.69 miles ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.70 miles CyrusOne: DFW7
DFW7 is the first building on CyrusOne's Fort Worth campus on Asphalt Drive, on land bought from energy developer Eolian beside its Chisholm Grid battery plant.
9.72 miles Tower TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.74 miles Coravel: Hicks Field DFW13
Coravel's Hicks Field DFW13 is a planned two-story data center on its hyperscale campus on Hicks Field Road in far north Fort Worth.
9.77 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.79 miles Coravel: Hicks Field DFW11
Coravel's Hicks Field DFW11 is the first building of its hyperscale data center campus on Hicks Field Road in far north Fort Worth, under construction for a hyperscale tenant.
9.79 miles CyrusOne: DFW8
DFW8 is the second building under way on CyrusOne's Fort Worth campus on Asphalt Drive, beside DFW7.
13.88 miles Verizon: Euless Switching Center
Verizon Wireless's Euless switching center is a windowless network building on Bear Creek Parkway near DFW Airport, opened in 2021, that also hosts Amazon Web Services equipment.
14.26 miles UT System: Arlington Regional Data Center
The University of Texas System runs its Arlington Regional Data Center on East Loop 820 in east Fort Worth as a shared colocation facility for its campuses.
14.44 miles Digital Realty: DFW44
DFW44 is a single-story Digital Realty data center at 2501 Edmonds Lane in Lewisville, Texas, built to suit for a financial-services tenant and owned in a joint venture with Mitsubishi Corporation.
14.45 miles Wells Fargo: Lewisville (Digital Realty DFW44)
Wells Fargo occupies Digital Realty's DFW44 data center in Lewisville, Texas, a building owned by a Digital Realty and Mitsubishi joint venture.
14.71 miles Digital Realty: DFW26
Digital Realty's DFW26 is the Convergence campus in Lewisville, Texas, a former Texas Instruments plant converted into ten connected buildings for data center, office and lab tenants.
14.88 miles Lightedge: Dallas (Lewisville)
LightEdge leases a suite in CyrusOne's Lewisville DFW2 data center north of Dallas.
14.89 miles CyrusOne: Lewisville DFW2
Two independent power grids Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
15.06 miles DTCC: Coppell
DTCC runs a data center complex in a former PSINet technical building on Crestside Drive in Coppell, north of Dallas.
15.16 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.98 miles Centersquare: Fort Worth DFW1
Csquare's Fort Worth DFW1 is a colocation campus in the CentrePort business park near DFW Airport, built by Exodus around 2000 and owned by Csquare since 2025.
15.99 miles Voltage Park: Fort Worth (Csquare DFW1)
Voltage Park runs a GPU cloud deployment inside Csquare's DFW1 colocation campus at CentrePort in Fort Worth.
16.07 miles Lumen Fort Worth 2
Lumen Fort Worth 2 is a Lumen network building at 1101 East 9th Street in Fort Worth, built in 1998 for IXC Communications.
16.21 miles Plaza ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.27 miles QumulusAI: Denton, TX
QumulusAI plans a modular data center of up to eight pods on city-leased land beside Denton's RD Wells substation, with operations expected in 2028.
16.33 miles Lumen For Worth 3
Lumen Fort Worth 3 is a Lumen network site in a 1925 office tower at 515 Houston Street in downtown Fort Worth.
16.36 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.49 miles LOGIX Fort Worth
LOGIX Fiber Networks ran a small colocation suite in the Oil & Gas Building on West 7th Street in downtown Fort Worth, which it stopped marketing in 2024.
16.53 miles Core Scientific: Denton, TX
Core Scientific's Denton campus has been converted from bitcoin mining to a high-performance computing campus leased to CoreWeave.
16.55 miles CoreWeave: Denton (Core Scientific)
CoreWeave is the high-performance computing tenant of Core Scientific's converted Denton campus beside the Denton Energy Center.
16.56 miles AT&T: Fort Worth Edison
AT&T's Edison building on Houston Street is the main telephone exchange in downtown Fort Worth, a multi-story Southwestern Bell building from 1971 that also hosts AT&T cloud equipment.
16.57 miles Lumen Fort Worth 1
Lumen Fort Worth 1 is a Lumen network colocation site at 1601 Jones Street in downtown Fort Worth.
16.61 miles Cloudnium: Irving
Cloudnium is converting a 1981 technical building on West Campus Circle Drive in Las Colinas, Irving, into a colocation data center and its headquarters.
16.66 miles QTS Irving DC1
QTS's first Dallas-area data center occupies the former Maxim semiconductor plant in Irving, Texas, and holds the campus's DC1 and DC2 data halls.
16.71 miles Cogent: Fort Worth
Cogent's Fort Worth data center is a former Sprint long-distance switching center on East Presidio Street, which Cogent offers for sale or wholesale lease.
16.79 miles Metro StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.80 miles QTS Irving DC3
DC3 is a multi-story data center on QTS's Irving campus in Las Colinas, occupied by Microsoft, with an on-site substation and diverse campus fiber entrances.
16.80 miles QTS: Irving DC6
DC6 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in late 2025 and fitted out for Microsoft in 2026.
16.82 miles Core HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.84 miles Prime TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.85 miles QTS: Irving DC4
DC4 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in 2024 and fitted out for Microsoft in 2025.
16.88 miles QTS: Irving DC5
DC5 is a two-story, $180 million data center on QTS's Irving campus in Las Colinas, completed in 2025 and occupied by Microsoft.
16.89 miles Point UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.86 miles D.R. Horton: Arlington Data Center
D.R. Horton built its own data center next to its headquarters area in Arlington, Texas, completed in 2022.
18.65 miles DataCanopy: Carrollton, TX
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
18.68 miles CyrusOne Carrollton
CyrusOne's DFW1 in Carrollton is one of the largest data centers in Texas, a building CyrusOne bought in 2012 and converted to data center use in phases.
19.18 miles PowerHouse: Irving Bldg-C
Building C is the third of three powered-shell data centers PowerHouse Data Centers and Harrison Street plan on a 50-acre former distribution site in Las Colinas, Irving.
19.26 miles PowerHouse: Irving Bldg-B
Building B is the second of three powered-shell data centers PowerHouse Data Centers and Harrison Street plan on a 50-acre former distribution site in Las Colinas, Irving.
19.32 miles PowerHouse: Irving Bldg-A
PowerHouse is developing its first Irving data center campus at 111 Customer Way, Irving, Texas, on a 50-acre site in the Las Colinas area. The project is a multi-phase, three-building development totaling 946,000 sq ft, with construction underway and the first building structurally completed in March 2026.
19.54 miles Verizon: Arlington Data Center
Verizon Business runs a network data center in the former MCI WorldCom building on 113th Street in Arlington's Great Southwest Industrial District.

STACK Fort Worth Alliance Data Center Photos See all

Aerial Photo of the Alliance Campus
Source: STACK
416 MWs?!
STACK Dallas Masterplan
Source: STACK

416 MWs?!

Operating Company

Operated by:

STACK Infrastructure is a privately held platform sponsored by IPI Partners that focuses on large scale wholesale capacity and campus development for hyperscale and enterprise customers.

The company was launched in 2019 when IPI combined the remaining Infomart Data Centers assets with selected T5 Data Centers facilities, and industry coverage at launch cited eight data centers across six U.S. markets totaling about 100 MW. In March 2022, IPI unified DigiPlex in the Nordics and SUPERNAP Italia in Milan under the STACK brand to form STACK EMEA, expanding the platform across Europe. STACK has since added international sites, including the first phase of a 56 MW campus in Toronto and its first Australian data center in Melbourne. Core services referenced by the company and trade press include wholesale colocation, build to suit, and powered shell solutions.

STACK Infrastructure History:

  • 2025: Sold its European enterprise colocation business (seven data centers in Stockholm, Oslo, Copenhagen, Milan and Geneva) to Apollo-managed funds; it now operates as Vaultica. STACK EMEA kept its hyperscale campuses.
  • 2023: Opened the first Australian data center in Melbourne on a multi-building campus.
  • 2023: Delivered the first 8 MW phase of a planned 56 MW campus in Toronto.
  • 2022: Rebranded DigiPlex (Nordics) and SUPERNAP Italia (Milan) as STACK EMEA.
  • 2019: IPI Partners launched STACK Infrastructure by combining the three Infomart Data Centers sites with selected T5 Data Centers assets. The company was rebranded as STACK INFRASTRUCTURE
  • 2018: ASB Real Estate Investments sold the three remaining Infomart Data Centers facilities in San Jose, Hillsboro, and Ashburn to IPI Partners; the Dallas Infomart carrier hotel was sold separately to Equinix earlier that year.
  • 2014: Acquired a facility in Ashburn that had been owned by AOL.
  • 2014: ASB Real Estate Fund, a subsidiary of DCI Technology Holdings, merged Infomart with Fortune Data Centers. The combined company was renamed to Infomart Data Centers.
  • 2012: Expanded to Oregon with a building in Hillsboro
  • 2007: John Sheputis purchased first Fortune Data Center in San Jose, CA, backed by ASB Real Estate
  • 2006: ASB Real Estate purchased Infomart Dallas building
  • 2006: Fortune Founded as Fortune Data Centers
0
Facilities
0
Markets

News See all

Read Equinix Affiliate Files for $500M DA13 Data Center in Dallas
An affiliate of [Equinix](https://baxtel.com/data-centers/equinix) has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The applicati...

Equinix Affiliate Files for $500M DA13 Data Center in Dallas

November 16, 2026 Equinix

An affiliate of Equinix has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The application puts a four-story, 372,445-square-foot building at 1520 West Mockingbird Lane, in an industrial area near Love Field, as Data Center...

Read more
Read Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico
Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, [New Mexico](https://baxtel.com/regions/new-mexico). ...

Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico

October 27, 2026 STACK INFRASTRUCTURE

Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, New Mexico. The contractors placed the final structural beam atop the building, completing its primary structural framework, Clayco announced on October...

Read more
Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.