0.00 miles
|
Provision Data Services
|
The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.
|
|
0.24 miles
|
LOGIX Dallas (2323 Bryan)
|
LOGIX Fiber Networks' colocation suite in the 2323 Bryan Street carrier hotel in downtown Dallas, which LOGIX took over when it bought Alpheus Communications in 2018.
|
|
0.24 miles
|
Earthlink Dallas
|
Former EarthLink colocation suite at 2323 Bryan Street in downtown Dallas, opened in 2013. EarthLink sold its IT services and data center business to Synoptek in 2016.
|
|
0.24 miles
|
Digital Realty: DFW10
|
Digital Realty's DFW10 at 2323 Bryan Street is one of downtown Dallas's two main carrier hotels, a 26-story tower with more than 60 carriers and the building meet-me room.
|
|
0.25 miles
|
Equinix Dallas DA4
|
Equinix DA4 is a colocation suite at 2323 Bryan Street in downtown Dallas that LayerOne opened in 2000 and Equinix acquired with Switch and Data in 2010.
|
|
0.34 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
0.39 miles
|
DataCanopy Dallas
|
|
|
0.43 miles
|
Opus Interactive Dallas
|
In 2014, Opus Interactive expanded its data center footprint in Dallas, Texas, with additional colocation and cloud hosting infrastructure.
|
|
0.43 miles
|
Cogent: 400 S Akard
|
Former Cogent Communications data center in Suite 700 of 400 South Akard Street in downtown Dallas. Cogent closed the 8,000 sq ft site in 2025.
|
|
0.44 miles
|
DataBank Downtown Dallas DFW1
|
DataBank's DFW1 fills 400 South Akard, the 1921 former Federal Reserve Bank of Dallas and one of downtown Dallas's main carrier hotels. DataBank bought the building back from Digital Realty in 2023.
|
|
0.44 miles
|
Sprocket DAL2
|
Former Sprocket Networks hosting site at 400 South Akard Street in downtown Dallas. Sprocket left the hosting business around 2020 and now sells dark fiber.
|
|
0.44 miles
|
Lumen Dallas 4
|
Lumen Dallas 4 is a Lumen network colocation suite on the fifth floor of 400 South Akard, DataBank's carrier hotel in downtown Dallas.
|
|
0.49 miles
|
Lumen Dallas 3
|
Lumen Dallas 3 is a small Lumen network point of presence in One Main Place, a 33-story office tower at 1201 Main Street in downtown Dallas.
|
|
1.85 miles
|
Lumen Dallas 2
|
Lumen Dallas 2 is a Lumen network colocation suite in the Dallas Infomart, the city's main interconnection hub at 1950 North Stemmons Freeway.
|
|
1.85 miles
|
Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy
|
The Infomart at 1950 North Stemmons Freeway is the main interconnection hub of Dallas and the South Central US. Equinix owns the 1.5 million sq ft building and runs its DA1, DA2, DA3 and DA6 data centers inside it, beside several other colocation providers.
|
|
1.85 miles
|
Flexential Dallas Infomart I-V
|
|
|
1.86 miles
|
Cologix: DAL1
|
Cologix DAL1 & DAL2 and DAL 3 are located in the carrier dense Infomart.
|
|
1.87 miles
|
DataBank DFW5
|
DataBank's DFW5 is a colocation suite inside the Dallas Infomart, the city's main interconnection hub, run before DataBank by CoreXchange and Zayo's zColo.
|
|
1.89 miles
|
Cologix: DAL2
|
DAL2 is a 12,000-square-foot facility located in the Infomart building at 1950 North Stemmons Freeway. Cologix opened its second site at the Dallas Infomart in 2013.
|
|
1.90 miles
|
Cologix: DAL3
|
DAL3 is a 13.2K SQFT facility located in the renowned Infomart building at 1950 North Stemmons Freeway.
|
|
1.97 miles
|
Equinix Dallas DA11
|
DA11 is Equinix's expansion next to the Infomart.
|
|
2.85 miles
|
CleanArc: Dallas Campus
|
CleanArc Data Centers and Crow Holdings are partnering to develop a turnkey data center campus in central Dallas, Texas.
|
|
4.00 miles
|
QuadraNet Dallas
|
|
|
4.00 miles
|
Contegix Dallas
|
|
|
4.01 miles
|
HostPapa DFW1
|
|
|
4.03 miles
|
TierPoint Dallas (Colo4)
|
The site was formerly operated by Colo4 before being acquired by TierPoint in 2010
|
|
4.53 miles
|
Equinix: Dallas DA12
|
Equinix DA12 is a four-story data center under construction at the former Taylor Publishing site in West Dallas, part of an $836 million investment.
|
|
4.59 miles
|
Lumen Dallas 1
|
Lumen Dallas 1 is Lumen's main colocation gateway in Dallas, a multi-tenant data center at 3180 Irving Boulevard that Level 3 bought in 1998.
|
|
4.85 miles
|
Verizon: 1300 W Mockingbird
|
Former XO facility
|
|
5.12 miles
|
CoreSpace Dallas
|
|
|
5.31 miles
|
DataBank DFW4 Empire Central
|
DataBank's DFW4 is a single-story, purpose-built data center in the Stemmons corridor west of Dallas Love Field, run by Stream and then Zayo before DataBank.
|
|
5.50 miles
|
Digital Realty: DFW36
|
Digital Realty's DFW36 is a colocation floor in the First American Center tower on North Stemmons Freeway in Dallas, first opened by Telx in 2008.
|
|
5.58 miles
|
DataBank DFW6 Love Field
|
DataBank's DFW6 is a colocation suite in a large multi-tenant data center building on Harry Hines Boulevard near Dallas Love Field.
|
|
6.04 miles
|
Lumen Dallas 6
|
|
|
6.13 miles
|
Fiberhub DFW1
|
Fiberhub's DFW1 is a retail colocation offering inside Prime Data Centers' DFW01-01 building on Round Table Drive in Dallas, opened in October 2018.
|
|
6.14 miles
|
Prime: DFW01-01
|
Prime Data Centers' DFW01-01 is a 1968 building on Round Table Drive in northwest Dallas that Carrier-1 converted to a data center in 2014.
|
|
6.17 miles
|
Evocative DA4
|
This site (DA4) was sold to Evocative in 2022 by Carrier-1.
|
|
6.20 miles
|
Prime: DFW01-02
|
Prime Data Centers' DFW01-02 is a three-story data center next to DFW01-01 on Round Table Drive in northwest Dallas, with its first data hall under construction.
|
|
7.28 miles
|
CoreSite: Irving DA1
|
CoreSite DA1 is CoreSite's first Texas data center, planned on the former Exela Technologies site at 2701 East Grauwyler Road in Irving.
|
|
7.51 miles
|
Edged Energy: DFW01-1
|
In January 2025, Edged Energy launched its data center in Irving, Texas..
|
|
7.58 miles
|
Equinix Dallas DA9
|
Equinix acquired DA9 in Irving as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DFW1.
|
|
7.67 miles
|
Edged Energy: DFW01-2
|
This facility will be a part of Edged Energy's Dallas Campus in Texas.
|
|
9.20 miles
|
CentralInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.57 miles
|
H5 Colo
|
|
|
9.63 miles
|
DataBank DFW7 LBJ
|
DataBank's DFW7 is a colocation suite in a multi-tenant office building on the LBJ Freeway in North Dallas.
|
|
9.90 miles
|
Centersquare: Dallas DFW3
|
The Centersquare Dallas portfolio consists of three data centers located in Fort Worth, Allen and Dallas providing close proximity to business hubs in downtown Dallas, Plano and Fort Worth.
|
|
9.93 miles
|
Provident: Dallas-Fort Worth Metroplex
|
Northampton Capital Partners and Provident Data Centers have formed a joint venture to develop a data center within the North Dallas Corridor of the Dallas-Fort Worth Metroplex.
|
|
10.56 miles
|
Aphorio Carter: Farmers Branch, TX
|
A Farmers Branch, Texas data center, formerly Digital Realty DFW14, owned by Aphorio Carter and leased in full to a Singapore-based consumer internet company.
|
|
10.99 miles
|
PowerHouse: Irving Bldg-A
|
PowerHouse is developing its first Irving data center campus at 111 Customer Way, Irving, Texas, on a 50-acre site in the Las Colinas area. The project is a multi-phase, three-building development totaling 946,000 sq ft, with construction underway and the first building structurally completed in March 2026.
|
|
11.09 miles
|
PowerHouse: Irving Bldg-B
|
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
|
11.14 miles
|
PowerHouse: Irving Bldg-C
|
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
|
11.53 miles
|
TRG Datacenters: Dallas DFW1
|
TRG Data Centers' DFW1 facility is a 160,000 gross-square-foot data center situated in Farmers Branch, Texas, within the strategic Addison Fiber Hub just 12 miles from the Dallas Infomart.
|
|
11.63 miles
|
East StationInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.73 miles
|
Mobius: Farmers Branch
|
|
|
12.82 miles
|
900 N Dorothy
|
|
|
12.83 miles
|
Verizon Dallas (Richardson)
|
|
|
12.96 miles
|
Colovore: Mesquite DFW01
|
Colovore's first Dallas-market facility, a purpose-built liquid-cooled colocation building in Mesquite, TX. Four-hall design following Colovore's standard high-density spec-build template, with service dates running 2028 into 2029.
|
|
13.12 miles
|
QTS: Greene Road DC1
|
DC1 is the first building pad on QTS's Greene Road tract in Lancaster, one of five two-story data centers of about 240,600 sq ft each on the Project Labrador zoning plan.
|
|
13.16 miles
|
Digital Realty: DFW42
|
Digital Realty's DFW42 is a planned data center at 1122 Alma Road on the Digital Dallas campus in Richardson, Texas. The 17-acre site holds an existing office building and adjoining lots.
|
|
13.22 miles
|
QTS: Irving DC4
|
DC4 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in 2024 and fitted out for a tenant in 2025.
|
|
13.23 miles
|
QTS: Irving DC5
|
DC5 is a two-story, $180 million data center on QTS's Irving campus in Las Colinas, completed in 2025.
|
|
13.25 miles
|
Digital Realty: 1201 N Bowser
|
Digital Realty's 1201 N Bowser site is a planned data center expansion on the Digital Dallas campus in Richardson, Texas. The 6.7-acre lot holds a former engineering office building.
|
|
13.30 miles
|
QTS Irving DC3
|
DC3 is a multi-story data center on QTS's Irving campus in Las Colinas, with an on-site substation and diverse campus fiber entrances.
|
|
13.32 miles
|
Digital Realty: DFW25
|
Located in the epicenter of North Dallas' high-technology corridor on the 69-acre Digital Dallas campus, this facility offers over 100,000 square feet of space and connectivity to more than 60 network service providers.
|
|
13.33 miles
|
Rackspace Richardson DFW3
|
In 2012, US hosting company Rackspace signed a long-term lease for more than 58,000 sq ft of raised floor space at Digital Realty Trust's data center campus in Richardson, Texas (Dallas metro).
|
|
13.34 miles
|
QTS: Irving DC6
|
DC6 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in late 2025 and fitted out for a tenant in 2026.
|
|
13.41 miles
|
Digital Realty: DFW16
|
This facility is a part of Digital Dallas Campus in Richardson.
|
|
13.42 miles
|
Digital Realty: DFW18
|
This facility is a part of Digital Dallas Campus in Richardson
|
|
13.42 miles
|
Equinix Dallas DA10
|
Former Terremark NAP of Dallas facility in Richardson that Equinix acquired from Verizon in 2017. Equinix closed DA10 in Q1 2021.
|
|
13.45 miles
|
Digital Realty: DFW35
|
This facility is a part of Digital Dallas Campus in Richardson.
|
|
13.45 miles
|
QTS Irving DC1
|
QTS's first Dallas-area data center occupies the former Maxim semiconductor plant in Irving, Texas, and holds the campus's DC1 and DC2 data halls.
|
|
13.47 miles
|
Digital Realty: DFW17
|
This facility is a part of Digital Dallas Campus in Richardson
|
|
13.49 miles
|
DataBank North Dallas DFW2
|
The facility is located in Northern Dallas in the Technology Business Corridor
|
|
13.52 miles
|
Digital Realty: DFW21
|
Digital Realty's DFW21 at 904 Quality Way is a powered base building on the Digital Dallas campus in Richardson, Texas. DataBank leases the building and runs it as its DFW2 data center.
|
|
13.54 miles
|
Digital Realty: DFW28
|
This facility is a part of Digital Dallas Campus in Richardson
|
|
13.55 miles
|
Digital Realty: DFW20
|
|
|
13.58 miles
|
QTS: Greene Road Expansion
|
Buildings B to E on QTS's Greene Road tract in Lancaster, Texas, from the five-building Project Labrador zoning plan.
|
|
13.59 miles
|
Digital Realty: DFW29
|
This facility is a part of Digital Dallas Campus in Richardson.
|
|
13.67 miles
|
Yondr: Lancaster Expansion
|
|
|
13.71 miles
|
AT&T Switching Station (Richardson)
|
A fire in October 2018 at this AT&T switching site caused a widespread outage of AT&T Internet and U-Verse TV services across North Texas.
|
|
13.83 miles
|
QTS: DFW3-DC1
|
DC1 is the first of two data centers QTS plans on its 98.6-acre DFW3 tract on East Belt Line Road in Lancaster, Texas: a building of about 502,750 sq ft on the west side of the site. Construction has not started.
|
|
13.85 miles
|
QTS: DFW3-DC2
|
DC2 is the second of two data centers QTS plans on its DFW3 tract on East Belt Line Road in Lancaster, Texas: a building of about 502,750 sq ft east of DC1, beside the site's planned substation. Construction has not started.
|
|
13.92 miles
|
Yondr: Lancaster 1
|
First planned building at Yondr's Lancaster campus, on the 29-acre west tract at 801 E. Belt Line Road. Yondr's concept plan shows a two-hall building of about 300,000 sq ft. Construction has not started.
|
|
13.99 miles
|
Digital Realty: DFW12
|
Digital Realty's DFW12 is a data center at 2440 Marsh Lane in Carrollton, Texas, with six suites served by dual 12.47 kV utility feeds.
|
|
14.00 miles
|
VAZATA Horizon Dallas (DAL II)
|
VAZATA’s Dallas Data Center DAB (Dal II) Features 12,500 of move-in-ready Tier III (with Tier IV attributes) data center space.
|
|
14.12 miles
|
Stack: DFW02D
|
STACK Infrastructure's DFW02D is building 4 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
|
|
14.20 miles
|
Stack: DFW02A
|
STACK Infrastructure's DFW02A is building 1 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
|
|
14.22 miles
|
NTT: Lancaster TX10 Expansion
|
Six later buildings (TX12 to TX17) on NTT's Lancaster campus at Sunrise Road and Belt Line Road, from the seven-building test fit for the 108.7-acre tract.
|
|
14.23 miles
|
365 Richardson, TX
|
|
|
14.25 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.28 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.32 miles
|
Stack: DFW02E
|
STACK Infrastructure's DFW02E is building 5 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
|
|
14.37 miles
|
Stack: DFW02B
|
STACK Infrastructure's DFW02B is building 2 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
|
|
14.42 miles
|
NTT: TX11
|
TX11 is the first planned building on NTT's Lancaster campus at Sunrise Road and Belt Line Road, a data center of about 225,000 sq ft on the 108.7-acre tract NTT bought in December 2025.
|
|
14.42 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.47 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.50 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.52 miles
|
Prime: DFW02-02
|
Prime Data Centers' DFW02-02 is building 2 of three planned data centers on its Garland campus at Arapaho Road and Holford Road.
|
|
14.52 miles
|
Stack: DFW02 Expansion
|
Expansion land on STACK Infrastructure's DFW02 campus in Lancaster, held for buildings beyond the five in STACK's 2026 plan.
|
|
14.56 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.56 miles
|
Stack: DFW02F
|
DFW02F was the sixth building in STACK Infrastructure's original 2024 plan for its DFW02 campus in Lancaster. STACK's 2026 plan has five larger buildings and no DFW02F.
|
|
14.58 miles
|
Stack: DFW02C
|
STACK Infrastructure's DFW02C is building 3 of five on its DFW02 campus on East Belt Line Road in Lancaster, south of Dallas.
|
|
14.61 miles
|
Prime: DFW02-03
|
Prime Data Centers' DFW02-03 is building 3 of three planned data centers on its Garland campus at Arapaho Road and Holford Road.
|
|
14.63 miles
|
Prime: DFW02-01
|
Prime Data Centers' DFW02-01 is building 1 of three planned data centers on its Garland campus at Arapaho Road and Holford Road.
|
|
14.66 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.71 miles
|
Centersquare: Fort Worth DFW1
|
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.
|
|
14.77 miles
|
QTS: DFW2-DC1
|
DC1 is the first building on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, a two-story, 413,726 sq ft data center with office and shell data hall space.
|
|
14.77 miles
|
Flexential Dallas (Synergy Park)
|
|
|
14.82 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.85 miles
|
QTS: DFW2-DC2
|
DC2 is a two-story, 470,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
|
|
14.91 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.92 miles
|
QTS: DFW2-DC3
|
DC3 is a two-story, 560,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
|
|
14.93 miles
|
Skybox: PowerCampus Dallas
|
The Skybox PowerCampus is Located at Oncor’s deregulated power territory, Lancaster, TX. PowerCampus™ Dallas will strategically address emerging high-density compute needs in the Dallas area providing up to 300 MWs of power
|
|
14.94 miles
|
DigiCo: Dallas DAL1
|
In January 2025, the newly established DigiCo Infrastructure REIT acquired State Farm’s Richardson data center from JDM III AZ LLC. The 129,170 sq ft facility, which was originally built by the insurance provider in 2015.
|
|
15.00 miles
|
CyrusOne: Dallas DFW6
|
CyrusOne invested $79.8 million to retrofit an existing building in Richardson, Texas, transforming it into their new DFW6 data center.
|
|
15.01 miles
|
QTS: DFW2-DC4
|
QTS is developing a 413,726-square-foot, two-story data center with office and shell data hall space on its South Dallas DFW2 campus near Wilmer, in southern Dallas County.
|
|
15.08 miles
|
QTS: Dallas III
|
Dallas III is a planned QTS data center of about 336,500 sq ft on 53.8 acres east of Mason Road at Belt Line Road in Wilmer, Texas, on the DFW2 plat. QTS has not filed it with the state.
|
|
15.18 miles
|
QTS: DFW2 Expansion
|
DFW2 Expansion holds the fourth planned building on QTS's 113.5-acre Dallas II tract between Sunrise Road and Mason Road in Wilmer and Lancaster, Texas. QTS has not filed it with the state.
|
|
15.23 miles
|
QTS: DFW2-DC7
|
QTS is expanding its South Dallas campus with DC7, a new two-story data center building planned near Wilmer in southern Dallas County.
|
|
15.24 miles
|
QTS: DFW2-DC5
|
DC5 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
|
|
15.27 miles
|
QTS: DFW2-DC6
|
DC6 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
|
|
15.60 miles
|
Lincoln: Plano DFW5
|
Lincoln Property Company is developing a two-story build-to-suit data center at 660 Data Drive in Plano, Texas, on a 10-acre parcel it acquired in May 2026, with delivery targeted for the fourth quarter of 2029.
|
|
15.62 miles
|
Digital Realty: DFW39
|
DFW39 is a single-story, 181,200 sq ft data center at 805 Holford Road on Digital Realty's Digital Garland campus in Garland, Texas, built to suit for a financial-services tenant.
|
|
15.68 miles
|
NTT: TX4
|
TX4 is the fourth building on NTT Global Data Centers' Garland campus, a liquid-cooling-ready data center that NTT scheduled to open in mid-2026.
|
|
15.73 miles
|
NTT: TX3
|
TX3 is the third building on NTT Global Data Centers' Garland campus, a two-story data center completed in 2024.
|
|
15.74 miles
|
Digital Realty: DFW45
|
DFW45 is a planned 672,000 sq ft data center at 1602 Ferris Road on Digital Realty's Digital Garland campus in Garland, Texas, with ten data hall suites.
|
|
15.74 miles
|
Digital Realty: DFW37
|
DFW37 is a two-story, 410,000 sq ft data center at 1502 Ferris Road on Digital Realty's Digital Garland campus in Garland, Texas, with six data hall suites and tenant office space.
|
|
15.76 miles
|
NTT TX2
|
TX2 is the second building on NTT Global Data Centers' Garland campus, a two-story data center completed in 2024.
|
|
15.79 miles
|
NTT 2300 W Plano
|
In January 2019, GI Partners bought the more than 1 million-square-foot office and tech complex at 2300 W. Plano Parkway near Bush Turnpike.
|
|
15.83 miles
|
NTT: TX1
|
TX1 is the first building on NTT Global Data Centers' Garland campus, opened by RagingWire in 2017.
|
|
15.84 miles
|
Digital Realty: DFW40
|
DFW40 is a data center under construction at 1512 Ferris Road on Digital Realty's Digital Garland campus in Garland, Texas. It holds six DR800 data hall suites plus office, loading and storage space.
|
|
15.95 miles
|
QTS: Dallas VI
|
Dallas VI is QTS's tract of about 75 acres at 401 Lavender Road in Wilmer, Texas, planned for three data center buildings of 285,000 to 378,100 sq ft. QTS has not filed any of them with the state.
|
|
15.98 miles
|
QTS: Dallas IV
|
Dallas IV is QTS's 131-acre tract at 501 Lavender Road in Wilmer, Texas, planned for five data center buildings of about 378,100 sq ft each. QTS has not filed any of them with the state.
|
|
16.01 miles
|
Stream: DFWA1
|
Stream Data Centers' DFWA1 is a two-phase hyperscale data center on Lookout Drive in Garland, northeast of Dallas, fully leased to a major cloud customer.
|
|
16.05 miles
|
Charles Schwab: Richardson DC5
|
Charles Schwab's DC5 is a data center on East Renner Road in Richardson, Texas, built by Stream Data Centers in 2012 and sold to a TD Ameritrade affiliate in 2014.
|
|
16.08 miles
|
CoreWeave Plano
|
CoreWeave launched a new $1.6 billion data center in Plano, Texas, which became operational at the end of 2023.
|
|
16.10 miles
|
Lincoln Rackhouse: 1000 Coit
|
|
|
16.10 miles
|
Mapletree: 1221 Coit
|
|
|
16.10 miles
|
Evocative: Dallas DAL6
|
Evocative acquired the DAL6 data center in Dallas, Texas in 2022. Spanning an impressive 111,000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
|
|
16.12 miles
|
EdgeCore Dallas
|
|
|
16.38 miles
|
Cisco Richardson TXDC1
|
|
|
16.41 miles
|
CyrusOne Carrollton
|
CyrusOne's DFW1 in Carrollton is one of the largest data centers in Texas, a building CyrusOne bought in 2012 and converted to data center use in phases.
|
|
16.45 miles
|
Compass: Red Oak X
|
Compass Datacenters' Red Oak X is building 10 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
|
|
16.46 miles
|
Compass: Red Oak V
|
Compass Datacenters' Red Oak V is building 5 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
|
|
16.48 miles
|
Compass: Red Oak VIII
|
Compass Datacenters' Red Oak VIII is building 8 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
|
|
16.48 miles
|
DataCanopy: Carrollton, TX
|
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
|
|
16.51 miles
|
Fortinet Plano
|
Fortinet-owned enterprise data center in Plano, bought from Ascent in April 2023. Tornado-hardened to F5, 2.7 MW critical load. Not offered as colocation.
|
|
16.56 miles
|
Compass: Red Oak IV
|
Compass Datacenters' Red Oak IV is building 4 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
|
|
16.56 miles
|
Compass: Red Oak IX
|
Compass Datacenters' Red Oak IX is building 9 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
|
|
16.57 miles
|
Compass: Red Oak VII
|
Compass Datacenters' Red Oak VII is building 7 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
|
|
16.64 miles
|
Compass: Red Oak III
|
Compass Datacenters' Red Oak III is building 3 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
|
|
16.66 miles
|
Compass: Red Oak VI
|
Compass Datacenters' Red Oak VI is building 6 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
|
|
16.67 miles
|
QTS: Dallas V
|
Dallas V is QTS's tract of about 101 acres at 420 Lavender Road and South Millers Ferry Road in Wilmer, Texas, held for future data centers. QTS has published no building plan for it.
|
|
16.70 miles
|
VAZATA Dallas (DAL I & III)
|
VAZATA's DAL I and DAL III data centers occupy space in Digital Realty's DFW11 building at 4025 Midway Road in Carrollton, Texas.
|
|
16.71 miles
|
Digital Realty: DFW11
|
Digital Realty's DFW11 is a single-story data center at 4025 Midway Road in Carrollton, Texas, built in 2000 and renovated in 2008. VAZATA is its largest tenant.
|
|
16.73 miles
|
Compass: Red Oak II
|
Compass Datacenters' Red Oak II is building 2 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
|
|
16.82 miles
|
Compass: Red Oak I
|
Compass Datacenters' Red Oak I is building 1 of ten hyperscale data centers on its DFW III campus in Red Oak, Ellis County, south of Dallas.
|
|
16.83 miles
|
Mapletree: 3300 Essex
|
Mapletree's 3300 Essex Drive is a single-story data center in Richardson, Texas, that Stream Data Centers developed in 2010-11 and leased to a major healthcare provider.
|
|
16.85 miles
|
West CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.86 miles
|
Lincoln: Red Oak DFW2
|
Planned data center building DFW2 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. It is the campus's lead building, with an initial phase targeted for the first quarter of 2028.
|
|
16.94 miles
|
Compass: Red Oak DFW III-I
|
Compass Datacenters' DFW III-I is the first and smallest data center on its DFW III campus in Red Oak, south of Dallas, completed in 2020.
|
|
17.03 miles
|
Evocative: DAL1
|
|
|
17.03 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.06 miles
|
Aligned: DFW-02
|
Aligned DFW-02 is the second building of Aligned's Plano Data center campus. DFW-02 is part of a 19-acre campus offering 36 megawatts of critical capacity across 220,000 sq. ft.
|
|
17.07 miles
|
Global IP Networks - Plano
|
|
|
17.08 miles
|
DataBank: DFW16
|
DFW16 is the last of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
17.11 miles
|
Lincoln: Red Oak DFW3
|
Planned data center building DFW3 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. Timing follows the lead building and utility power confirmation.
|
|
17.11 miles
|
Metro TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.18 miles
|
DataBank: DFW15
|
DFW15 is the seventh of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
17.22 miles
|
DataBank: DFW12
|
DFW12 is the fourth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
17.22 miles
|
AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.25 miles
|
DataBank: DFW14
|
DFW14 is the sixth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
17.26 miles
|
Flexential Dallas (Plano)
|
Flexential's Plano site in Dallas is former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017.
|
|
17.32 miles
|
DataBank: DFW13
|
DFW13 is the fifth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
17.34 miles
|
DataBank: DFW11
|
DFW11 is the third of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
17.34 miles
|
Campus ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.38 miles
|
Lincoln: Red Oak DFW4
|
Planned data center building DFW4 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. Timing follows the lead building and utility power confirmation.
|
|
17.40 miles
|
DataBank: DFW10
|
DFW10 is the second of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
17.40 miles
|
TwoInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.51 miles
|
DataBank: DFW9
|
DFW9 is the first of eight planned buildings on DataBank's 292-acre Red Oak campus in Ellis County, south of Dallas.
|
|
17.51 miles
|
Campus UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.20 miles
|
Cawley Partners: South Creek Ranch
|
The initial plans for this expansive property designate 2,000 acres in the northern section specifically for digital commerce parks, which will include data centers.
|
|
19.02 miles
|
CyrusOne: Lewisville DFW2
|
Two independent power grids
Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
|
|
19.03 miles
|
Lightedge: Dallas (Lewisville)
|
LightEdge leases a suite in CyrusOne's Lewisville DFW2 data center north of Dallas.
|
|
19.07 miles
|
Digital Realty: DFW26
|
Digital Realty's DFW26 is the Convergence campus in Lewisville, Texas, a former Texas Instruments plant converted into ten connected buildings for data center, office and lab tenants.
|
|
19.13 miles
|
Compass: Red Oak Goodloe Lane Campus
|
Compass Datacenters' planned second data center campus in Red Oak, Texas, on about 830 acres the city rezoned for eight two-story buildings in 2026.
|
|
19.42 miles
|
Digital Realty: DFW44
|
DFW44 is a single-story Digital Realty data center at 2501 Edmonds Lane in Lewisville, Texas, built to suit for a financial-services tenant and owned in a joint venture with Mitsubishi Corporation.
|
|
19.43 miles
|
Stack: DFW01A
|
Former Stream Data Centers powered shell at 6653 Pinecrest Drive in Plano's Legacy Business Park, converted by T5 Data Centers from 2011 and enlarged in 2013 into four independent data centers, one of them Equinix DA7.
|
|
19.45 miles
|
Equinix Dallas DA7
|
Equinix DA7 occupies one of the four data centers in STACK's DFW01A building in Plano's Legacy Business Park, leased in 2015.
|
|
19.52 miles
|
Stack: DFW01C
|
STACK Infrastructure's DFW01C is a planned build-to-suit data center on the former Spring Creek Golf Center site, the third building on its DFW01 campus in Plano.
|
|
19.58 miles
|
Stack: DFW01B
|
STACK Infrastructure's DFW01B is the second building on its DFW01 campus in Plano's Legacy Business Park, a five-hall data center built in 2016 as T5@Dallas II.
|
|
19.84 miles
|
Resilience DFW
|
The Skybox campus can be expanded to 350,000 square foot capacity to host servers and provide 60 megawatts of power in later phases.
|