DataBank Raises $2bn for Dallas Data Center Buildout
April 22, 2026
Dallas
| Distance | Site | About |
|---|---|---|
| 7.40 miles | QTS Irving |
In 2013 QTS acquired the former Maxim semiconductor plant. It was QTS's first data center in the Dallas market
|
| 7.54 miles | QTS Irving DC3 |
The QTS Irving 1 DC3 facility will provide our customers with an on-site substation and diverse campus fiber entrances with a redundant campus conduit system.
|
| 7.55 miles | QTS: Irving DC6 |
QTS Irving DC6 is located in the Irving area of Dallas, Texas.
|
| 7.58 miles | QTS: Irving DC5 |
QTS Irving DC5 is located in the Irving area of Dallas, Texas.
|
| 7.59 miles | QTS: Irving DC4 |
QTS Data Centers is building the Irving DC4 facility at 3 Longhorn Drive, Irving, TX.
|
| 7.66 miles | Centersquare: Fort Worth DFW1 |
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.
|
| 7.68 miles | Digital Realty: Project Gold Lewisville |
Digital Realty's Project Gold is located on Edmonds Lane in Lewisville. The project consists of a single-story shell data center with space for three data halls on a 182,969 sq ft (17,000 sqm) site.
|
| 7.78 miles | Digital Realty: DFW26 |
In 2012, Digital Realty Trust acquired the Convergence Business Park, an 831,400 square-foot data center and office campus in the Dallas suburb of Lewisville, Texas.
|
| 7.96 miles | CyrusOne: Lewisville DFW2 |
Two independent power grids
Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
|
| 8.39 miles | Lightedge: Dallas (Lewisville) |
LightEdge leases space from CyrusOne Lewisville DFW2.
|
| 9.24 miles | Tierpoint Fort Worth |
The property came to market in 2023 and was acquired by Tierpoint.
|
| 9.27 miles | STACK Fort Worth Alliance |
STACK's expansion Alliance campus in Fort Worth
|
| 9.69 miles | Hyperscale Data Center Request Dataset |
When completed, the Fort Worth site will be Facebook’s largest data center to date, four buildings connected to form two “H” shapes, plus one standalone center, for a total of 20 data hall
|
| 9.72 miles | Citigroup Fort Worth | |
| 9.79 miles | QTS: FTW1-DC2 |
QTS Data Centers is building a second data center adjacent to its first one near the Alliance Texas development. The two-story building is set to span 471,875 sq ft (43,840 sqm) and see $220 million invested in the project.
|
| 9.81 miles | QTS Dallas Fort Worth |
QTS's Forth Worth site is the company's second data center in Dallas Market.
|
| 9.91 miles | PowerHouse: Irving, TX |
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
| 10.02 miles | PowerHouse: Irving DC2 |
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
| 10.12 miles | PowerHouse: Irving DC3 |
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
| 10.98 miles | DataCanopy: Carrollton, TX |
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
|
| 10.99 miles | CyrusOne Carrollton |
60,000 SqFt of Office Space
Power Density: 150–200+ watts/SqFt
|
| 12.06 miles | Hyperscale Data Center Request Dataset |
Microsoft plans to build four data centers, with Irving City Council approving separate tax incentives for each facility.
|
| 12.09 miles | Hyperscale Data Center Request Dataset |
Google has officially backed out of its plans for the Northlake Logistics Park in Denton County, marking a strategic shift away from the previously leased 1-million-square-foot facility.
|
| 12.15 miles | Hyperscale Data Center Request Dataset |
Google has officially backed out of its plans for the Northlake Logistics Park in Denton County, marking a strategic shift away from the previously leased 1-million-square-foot facility.
|
| 13.07 miles | Equinix Dallas DA9 |
Equinix acquired DA9 in Irving as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DFW1.
|
| 13.20 miles | Edged Energy: DFW01-2 |
This facility will be a part of Edged Energy's Dallas Campus in Texas.
|
| 13.33 miles | Edged Energy: Dallas, Tx |
In January 2025, Edged Energy launched its data center in Irving, Texas..
|
| 13.63 miles | Centersquare: Dallas DFW3 |
The Centersquare Dallas portfolio consists of three data centers located in Fort Worth, Allen and Dallas providing close proximity to business hubs in downtown Dallas, Plano and Fort Worth.
|
| 14.50 miles | Prime: DFW01-02 |
Prime Data Centers is planning to develop a three-story, 96,800 sq ft (8,995 sqm) data center at 1455 Round Table Drive in Dallas County.
|
| 14.54 miles | Evocative DA4 |
This site (DA4) was sold to Evocative in 2022 by Carrier-1.
|
| 14.57 miles | Prime: Dallas DFW01 |
In April 2023, Prime Data Centers discreetly added Dallas to its list of data center locations. The company now has a presence at 1515 Round Table Drive in Dallas, offering 6MW of capacity across a 106,865 square foot (9,930 square meter) facility.
|
| 14.57 miles | Fiberhub DFW1 |
|
| 14.58 miles | Lumen Dallas 6 |
|
| 14.96 miles | VAZATA Horizon Dallas (DAL II) |
VAZATA’s Dallas Data Center DAB (Dal II) Features 12,500 of move-in-ready Tier III (with Tier IV attributes) data center space.
|
| 14.98 miles | Digital Realty: DFW12 |
The 69-acre Digital Dallas data campus is situated along primary fiber routes and has the unique distinction of having the privately owned, on-site 138kV substation fed from two independent utility substations.
|
| 15.14 miles | 8435 Stemmons - Digital Realty |
|
| 15.25 miles | DataBank DFW6 Love Field |
|
| 15.32 miles | DataBank DFW4 Empire Central |
The site was acquired by Zayo in January 2016 from Stream Datacenters.
|
| 15.51 miles | CoreSpace Dallas |
|
| 15.56 miles | Mobius: Farmers Branch |
|
| 15.77 miles | Verizon: 1300 W Mockingbird |
Former XO facility
|
| 16.05 miles | Digital Realty: DFW14 | |
| 16.10 miles | Lumen Dallas 1 | |
| 16.12 miles | Equinix: Dallas DA12 |
Equinix is expanding its Texas footprint with the development of DA12, a massive $836 million data center campus located at the former Taylor Publishing site in West Dallas.
|
| 16.37 miles | Digital Realty: DFW11 |
The Digital Realty 100,000sqft data center was built in 2000, renovated in 2008. The site is located near the George Bush Turnpike and North Dallas Tollway and provides an ideal data center location. VAZATA is the largest tenant.
|
| 16.37 miles | VAZATA Dallas (DAL I & III) |
The VAZATA site was previously known as: Horizon Dallas (DAL I)
|
| 16.61 miles | TierPoint Dallas (Colo4) |
The site was formerly operated by Colo4 before being acquired by TierPoint in 2010
|
| 16.63 miles | HostPapa DFW1 |
|
| 16.64 miles | Contegix Dallas | |
| 16.64 miles | QuadraNet Dallas | |
| 16.73 miles | ACS: Fort Worth Expansion | |
| 16.89 miles | ACS: Fort Worth, Texas |
The proposed development, located on a 107-acre site near Hicks Field Road, will feature five buildings and an associated substation.
|
| 16.89 miles | CyrusOne: DFW7 |
Dubbed DFW7, the project will encompass 1.9 million square feet and feature multiple buildings.
|
| 17.41 miles | Lumen Fort Worth 2 | |
| 17.78 miles | CleanArc: Dallas Campus |
CleanArc Data Centers and Crow Holdings are partnering to develop a turnkey data center campus in central Dallas, Texas.
|
| 17.85 miles | Lumen Fort Worth 1 | |
| 17.91 miles | Lumen For Worth 3 | |
| 18.02 miles | LOGIX Fort Worth |
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
|
| 18.17 miles | DataBank DFW7 LBJ |
|
| 18.36 miles | Mapletree: 5000 South Bowen | |
| 18.43 miles | Resilience DFW |
The Skybox campus can be expanded to 350,000 square foot capacity to host servers and provide 60 megawatts of power in later phases.
|
| 18.59 miles | Crypto Mining Data Center Request Dataset |
In northern Texas, Project Fei is a data center project co-located with a 240 MW utility-scale solar farm.
|
| 18.68 miles | Equinix Dallas DA11 |
DA11 is Equinix's expansion next to the Infomart.
|
| 18.76 miles | Cologix: DAL3 |
DAL3 is a 13.2K SQFT facility located in the renowned Infomart building at 1950 North Stemmons Freeway.
|
| 18.77 miles | DataBank DFW5 |
|
| 18.77 miles | Cologix: DAL2 |
DAL2 is a 12,000-square-foot facility located in the Infomart building at 1950 North Stemmons Freeway. Cologix opened its second site at the Dallas Infomart in 2013.
|
| 18.78 miles | Verizon Dallas (Infomart) |
Verizon established a new Point of Presence (PoP) in the Infomart Dallas carrier-neutral Building Meet-Me Room (BMMR) in August 2017.
|
| 18.79 miles | Cologix: Dallas DAL1 |
Cologix DAL1 & DAL2 and DAL 3 are located in the carrier dense Infomart.
|
| 18.80 miles | Lumen Dallas 2 | |
| 18.80 miles | Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy |
The Infomart is the center of network Interconnection and Peering in Dallas. In fact, the Infomart is the nexus of the Interconnection marketplace for the entire South Central United States. The only other building with reasonable network density is Digital Realty's 2323 Bryant Street.
|
| 18.81 miles | Flexential Dallas Infomart I-V |
|
| 19.05 miles | H5 Colo |
|
| 19.37 miles | Stack: DFW01 Future Expansion |
STACK Infrastructure's DFW01 Future Expansion offers a build-to-suit expansion opportunity with 50MW of accessible power, adjacent to DFW01A and DFW01B data centers.
|
| 19.42 miles | Equinix Dallas DA7 |
Equinix invested more than $20 million for the DA7 IBX data center, which currently includes 1,200 cabinets
|
| 19.42 miles | STACK Dallas-Fort Worth DFW01 |
There are three data centers on the campus:
#1 is a 317,800 sqft data center with 21 MW of critical power
#2 up to 11 MW
#3 is a LEED Silver certified, concurrently maintainable data center with 94,400 square feet of technical space and 10.75MW of available power from two local substations.
|
| 19.53 miles | STACK DFW01B |
STACK’s DFW01B data center boasts a substantial footprint of 156000 square feet area. This facility offers up to 11MW of critical capacity, with 2.2MW immediately available.
|
| 19.76 miles | QumulusAI: Denton, TX |
Located on four acres near Western Boulevard and Jim Christal Road, the facility will house eight prefabricated "pods" designed for AI and cryptomining.
|
| 19.91 miles | DataBank: DFW8 |
Databank expanded its Plano data center campus (DFW3) with a $280 million, 265,000sqft three-story building.
|
April 22, 2026
Dallas
June 18, 2025
Dallas
December 12, 2024
Rackspace
June 06, 2023
Rackspace
May 31, 2023
Rackspace
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas