Centersquare: Allen DFW2

Latest Podcast
900 Guardians Way
Operational
Fully operational facility
Operated by:

Centersquare: Allen DFW2

Year Built: 2000
░░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

The Centersquare Dallas portfolio consists of three data centers located in Fort Worth, Allen and Dallas providing close proximity to business hubs in downtown Dallas, Plano and Fort Worth.

  • This facility was previously operated by Evoque Data Center Solutions. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024, established a formidable entity in 17 markets, primarily across North America.

Building:


  • This facility is part of Millennium high technology park in Allen, TX.
  • Single story tilt-wall concrete structure with structural steel columns and roof joists
  • Building is 575’ x 220’ in plan.
  • Building was constructed in 1999.
  • Floors designed for live load of 175 psf, typical.
  • Battery Rooms are designed for a live load of 300psf.

Power:


  • There are eight (8) Caterpillar diesel generators providing standby power to the Internet Data Center. This represents an N+2 configuration. Five (5) underground fuel tanks store 70,000 gallons of diesel on-site.
  • Uninterruptible Power Supply: There are six (6) Liebert UPS systems, each with four (4)- 600kW/750kVA modules. Power is supplied to the UPS systems through commercial power feeders and standby generators. The UPS system is designed to support the full load for 15 minutes via its internal battery plant. This represents a 2N configuration.

Telecom Info:


CLLI Code: ALLNTXGM
POP: DLLSTXTL
NPA/NXX: 972/390

Compliance:


SOC 1 Type II
SOC 2 Type II
SOC 3
ISAE 3402
PCI-DSS

Map and Nearby Locations:

900 Guardians Way
Csquare Sites
Nearby Facilities

Sites within 15 miles of Centersquare: Allen DFW2

Distance Site About
3.11 miles Cisco Allen
3.28 miles DataCanopy: Allen, TX
3.31 miles CyrusOne Allen DFW3
The project will have three phases. The first phase of CyrusOne's planned Allen data center would be 350,950 square feet. Two additional phases would add a 619,100 square foot and a 412,800 sqft building.
3.35 miles Compass Allen I
3.37 miles Compass: Allen II
3.37 miles Tierpoint Dallas-Allen
3.43 miles CyrusOne Allen DFW4
The DFW4 shell & uplift project involves the company investing $31.5 million in a new single-story data center with a two-story office component. The facility measures 126,000 sq ft (11,700 sqm).
5.70 miles Global IP Networks - Plano
5.93 miles Aligned Plano
Aligned's DFW-01 data center is located on a 19-acre campus at 2800 Summit Avenue in Plano. The facility offers 375000 gross square feet of space and 60 megawatts of power.
5.93 miles Evocative: DAL1
5.93 miles Aligned: DFW-02
Aligned DFW-02 is the second building of Aligned's Plano Data center campus. DFW-02 is part of a 19-acre campus offering 36 megawatts of critical capacity across 220,000 sq. ft.
6.02 miles Flexential Dallas (Plano)
Flexential's Plano site in Dallas is former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017.
6.13 miles Ascent Dallas DAL1
6.57 miles Cisco Richardson TXDC1
6.66 miles Mapletree: 3300 Essex
In 2010, Stream Data Centers purchased a 20,000 SF warehouse in Richardson and began development of a 10,000 SF data hall.
6.67 miles Stream DFW IV
In 2010, Stream Data Centers purchased a 20,000 SF warehouse in Richardson and began development of a 10,000 SF data hall.
6.71 miles Stream: DFW V
In 2015, Texas-based Stream Data Centers sold a 73,320 sqft data center to a local financial services company and was then immediately hired to run it.
6.83 miles NTT 2300 W Plano
In January 2019, GI Partners bought the more than 1 million-square-foot office and tech complex at 2300 W. Plano Parkway near Bush Turnpike.
7.25 miles Hyperscale Data Center Request Dataset
CoreWeave launched a new $1.6 billion data center in Plano, Texas, which became operational at the end of 2023.
7.26 miles Lincoln Rackhouse: 1000 Coit
7.35 miles EdgeCore Dallas
7.37 miles Evocative: Dallas DAL6
Evocative acquired the DAL6 data center in Dallas, Texas in 2022. Spanning an impressive 111,000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
7.38 miles Mapletree: 1221 Coit
7.59 miles STACK DFW01B
STACK’s DFW01B data center boasts a substantial footprint of 156000 square feet area. This facility offers up to 11MW of critical capacity, with 2.2MW immediately available.
7.65 miles DataBank Plano DFW3
DataBank’s Plano DFW3 is the newest Uptime Certified TIER III Data Center, and the third in the Dallas area.
7.66 miles CyrusOne: Dallas DFW6
CyrusOne invested $79.8 million to retrofit an existing building in Richardson, Texas, transforming it into their new DFW6 data center.
7.67 miles STACK Dallas-Fort Worth DFW01
There are three data centers on the campus: #1 is a 317,800 sqft data center with 21 MW of critical power #2 up to 11 MW #3 is a LEED Silver certified, concurrently maintainable data center with 94,400 square feet of technical space and 10.75MW of available power from two local substations.
7.68 miles Equinix Dallas DA7
Equinix invested more than $20 million for the DA7 IBX data center, which currently includes 1,200 cabinets
7.70 miles DigiCo: Dallas DAL1
In January 2025, the newly established DigiCo Infrastructure REIT acquired State Farm’s Richardson data center from JDM III AZ LLC. The 129,170 sq ft facility, which was originally built by the insurance provider in 2015.
7.73 miles DataBank: DFW8
Databank expanded its Plano data center campus (DFW3) with a $280 million, 265,000sqft three-story building.
7.78 miles Stack: DFW01 Future Expansion
STACK Infrastructure's DFW01 Future Expansion offers a build-to-suit expansion opportunity with 50MW of accessible power, adjacent to DFW01A and DFW01B data centers.
7.85 miles Stream: DFWA-1
In January 2020, Stream commissioned phase I of a greenfield hyperscale data center development on a 23-acre site in Garland, next to northeast Dallas, Texas.
7.99 miles NTT: TX3
NTT TX3 is the third building of NTT's Garland campus. The datacenter building is approximately 229,500 square feet in size consisting of additional office space and adding equipment to data vaults.
8.00 miles NTT Dallas TX1
RagingWire’s Dallas TX1 Datacenter is a 16 megawatt facility with 230,000 square feet of data center space. TX1 is the first phase of a 42 acre campus that can expand capacity up to 80 megawatts and 1 million sqft spread across 5 interconnected buildings.
8.01 miles NTT TX2
NTT TX2 is the second building of NTT's Garland campus. The datacenter building is 229,500 square feet in size with two-story office and loading dock located on the ground floor.
8.02 miles Flexential Dallas (Synergy Park)
8.11 miles NTT: TX4
NTT is expanding in Garland, adding another building to its existing campus. The project will consist of a new 235,910 sq ft (21,915 sqm) data center.
8.36 miles Digital Garland
8.51 miles Digital Realty: DFW37
Digital Realty has filed to expand its planned data center campus in the Garland area of Dallas, Texas. The company is planning to construct a 410,000 sq ft (38090 sqm) data center building comprised of a tenant office and six data halls.
8.61 miles Digital Realty: 1505 Ferris
DRT's 181,200 square foot (16,800 sqm) core & shell data center is located on Ferris Road in Garland, TX.
8.82 miles AT&T Switching Station (Richardson)
A fire in October 2018 at this AT&T switching site caused a widespread outage of AT&T Internet and U-Verse TV services across North Texas.
8.88 miles Resilience DFW
The Skybox campus can be expanded to 350,000 square foot capacity to host servers and provide 60 megawatts of power in later phases.
8.96 miles Digital Realty: DFW29
This facility is a part of Digital Dallas Campus in Richardson.
8.98 miles Digital Realty: DFW28
This facility is a part of Digital Dallas Campus in Richardson
9.01 miles Digital Dallas Campus in Richardson - Digital Realty
9.05 miles Digital Realty: DFW17
This facility is a part of Digital Dallas Campus in Richardson
9.06 miles DataBank North Dallas DFW2
The facility is located in Northern Dallas in the Technology Business Corridor
9.08 miles Equinix Dallas DA10
The site was previously was a Terremark NAP of Dallas
9.09 miles 365 Richardson, TX
9.09 miles Digital Realty: DFW16
This facility is a part of Digital Dallas Campus in Richardson.
9.11 miles Digital Realty: DFW35
This facility is a part of Digital Dallas Campus in Richardson.
9.12 miles Digital Realty: DFW18
This facility is a part of Digital Dallas Campus in Richardson
9.18 miles Rackspace Richardson DFW3
In 2012, US hosting company Rackspace signed a long-term lease for more than 58,000 sq ft of raised floor space at Digital Realty Trust's data center campus in Richardson, Texas (Dallas metro).
9.18 miles Digital Realty: DFW25
Located in the epicenter of North Dallas' high-technology corridor on the 69-acre Digital Dallas campus, this facility offers over 100,000 square feet of space and connectivity to more than 60 network service providers.
9.40 miles Prime: DFW02-03
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
9.41 miles Prime: DFW02-02
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
9.42 miles VAZATA: McKinney
VAZATA’s McKinney (McK) is located at 1720 Bray Central Drive McKinney, and is an ideal facility for companies seeking a colocation data center, business continuity and disaster recovery centers, and have access to a workspace area as well.
9.56 miles Prime: Garland, TX
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
9.66 miles 900 N Dorothy
9.82 miles Verizon Dallas (Richardson)
10.62 miles Digital Realty: DFW11
The Digital Realty 100,000sqft data center was built in 2000, renovated in 2008. The site is located near the George Bush Turnpike and North Dallas Tollway and provides an ideal data center location. VAZATA is the largest tenant.
10.62 miles VAZATA Dallas (DAL I & III)
The VAZATA site was previously known as: Horizon Dallas (DAL I)
10.95 miles Crypto Mining Data Center Request Dataset
In northern Texas, Project Fei is a data center project co-located with a 240 MW utility-scale solar farm.
12.66 miles Digital Realty: DFW12
The 69-acre Digital Dallas data campus is situated along primary fiber routes and has the unique distinction of having the privately owned, on-site 138kV substation fed from two independent utility substations.
12.66 miles VAZATA Horizon Dallas (DAL II)
VAZATA’s Dallas Data Center DAB (Dal II) Features 12,500 of move-in-ready Tier III (with Tier IV attributes) data center space.
13.15 miles H5 Colo
13.43 miles DataBank DFW7 LBJ
13.43 miles Mobius: Farmers Branch
13.93 miles Digital Realty: DFW14
15.98 miles CyrusOne Carrollton
60,000 SqFt of Office Space Power Density: 150–200+ watts/SqFt
15.99 miles DataCanopy: Carrollton, TX
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
16.67 miles Centersquare: Dallas DFW3
The Centersquare Dallas portfolio consists of three data centers located in Fort Worth, Allen and Dallas providing close proximity to business hubs in downtown Dallas, Plano and Fort Worth.
18.96 miles Lightedge: Dallas (Lewisville)
LightEdge leases space from CyrusOne Lewisville DFW2.
19.28 miles CyrusOne: Lewisville DFW2
Two independent power grids Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
19.47 miles Digital Realty: DFW26
In 2012, Digital Realty Trust acquired the Convergence Business Park, an 831,400 square-foot data center and office campus in the Dallas suburb of Lewisville, Texas.
19.68 miles Digital Realty: Project Gold Lewisville
Digital Realty's Project Gold is located on Edmonds Lane in Lewisville. The project consists of a single-story shell data center with space for three data halls on a 182,969 sq ft (17,000 sqm) site.

Centersquare: Allen DFW2 Data Center Photos (See all)

Operating Company

Operated by:

Csquare is a preeminent colocation provider with a proven track record of providing highly reliable data center services. Prioritizing security, reliability and superior customer service, Csquare offers flexible data center solutions backed by a 100% uptime guarantee.

With 80 data center locations in 30 critical markets and a host of on-prem, hybrid and on-demand solutions, Csquare is a trusted expert for thousands of diverse organizations across all industries.

Centersquare is a colocation and interconnection provider formed in 2024 when Brookfield Infrastructure combined Evoque Data Center Solutions and the acquired assets of Cyxtera Technologies.

Centersquare History:

  • April 2024: Rebranded from Evoque and Cyxtera to Centersquare.
  • January 2024: Founded as Centersquare when Evoque closed the acquisition of Cyxtera’s data center portfolio to create a combined platform.

Evoque Data Center Solutions History:

Evoque Data Center Solutions is a data center operator created in 2019 after Brookfield Infrastructure Partners acquired AT&T’s colocation assets.

  • April 2024: Rebranded from Evoque Data Center Solutions and Cyxtera to Centersquare.
  • 2024: Closed acquisition of Cyxtera’s data center portfolio.
  • 2022: Exited international data centers to concentrate on U.S. sites.
  • 2019: Launched following Brookfield Infrastructure Partners’ acquisition of AT&T’s colocation assets.

Cyxtera:

Cyxtera Technologies was a data center operator formed in 2017 when funds advised by BC Partners and Medina Capital acquired CenturyLink’s data centers and colocation business and combined it with Medina Capital’s security and analytics portfolio.

Cyxtera Technologies History:

  • April 2024: Rebranded from Cyxtera Technologies to Centersquare together with Evoque.
  • November 2023: Entered an asset purchase agreement for Brookfield affiliates to acquire substantially all assets, including related real estate transactions.
  • June 2023: Filed for Chapter 11 to implement a restructuring support agreement and obtain debtor-in-possession financing.
  • February 2021: Agreed to merge with Starboard Value Acquisition Corp. to become a publicly traded company.
  • May 2017: Launched following the sale of CenturyLink’s data centers and colocation business to a consortium led by BC Partners and Medina Capital, combined with Medina Capital’s security and analytics portfolio.
56
Facilities
18
Markets
437MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?