Flexential Dallas (Plano)

Latest Podcast 3500 E Plano Pkwy
Operational
Fully operational facility
Operated by:

Flexential Dallas (Plano)

Year Built: 2016
PUE: 1.3
Utility Provider: Oncor
Ownership: Flexential does not own the real estate.
Lot Size: 15 acres

Sites leasing space from Flexential:

░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Flexential's Plano data center sits on East Plano Parkway in Plano. ViaWest opened it in 2016 as its largest Texas facility, and Flexential took over when Peak 10 and ViaWest combined in 2017. In August 2021 a joint venture of Legacy Investing and Invesco Real Estate bought the building in a sale-leaseback, and the proceeds funded a 146,000 sq ft addition completed at the end of 2021. CoreWeave runs a high-density deployment in the building, announced in April 2025. The facility uses a distributed-redundant UPS design.

Site History

  • April 2025: CoreWeave announces its deployment in the building.
  • December 2021: The 146,000 sq ft addition is completed.
  • August 2021: A Legacy Investing and Invesco venture buys the building and leases it back to Flexential.
  • January 2018: ViaWest rebrands as Flexential.
  • 2016: ViaWest opens the data center.

Map and Nearby Locations

3500 E Plano Pkwy
Flexential Sites
Nearby Facilities

Flexential Dallas (Plano) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Flexential Dallas (Plano)

Distance Site
0.02 miles CoreWeave: Plano (Flexential)
0.53 miles Mapletree: 3300 Essex
0.54 miles Aligned: DFW-04
0.54 miles Aligned: DFW-02
0.55 miles Lambda: Plano (Aligned DFW-04)
0.61 miles Aligned: DFW-01
0.61 miles Evocative: DAL1
0.88 miles Cisco Richardson TXDC1
1.04 miles Global IP Networks - Plano
1.25 miles EdgeCore Dallas
1.27 miles BoA: Richardson USTX02
1.38 miles Charles Schwab: Richardson DC5
1.42 miles BoA: Richardson USTX01
1.47 miles Fortinet Plano
1.50 miles Cogent: Plano Edge
1.73 miles Stream: DFWA1
1.84 miles NTT: TX3
1.86 miles NTT TX2
1.86 miles NTT: TX1
1.93 miles NTT: TX4
2.19 miles Digital Realty: DFW40
2.20 miles Digital Realty: DFW45
2.30 miles Digital Realty: DFW37
2.33 miles CoreWeave: Richardson (CyrusOne DFW6)
2.34 miles CyrusOne: Dallas DFW6
2.41 miles State Farm: Richardson (DigiCo DAL1)
2.43 miles DigiCo: Dallas DAL1
2.43 miles Digital Realty: DFW39
2.44 miles Wells Fargo: Garland (Digital Realty DFW39)
3.20 miles 365 Richardson, TX
3.24 miles Prime: DFW02-03
3.26 miles Prime: DFW02-02
3.28 miles Prime: DFW02-01
3.68 miles AT&T Switching Station (Richardson)
3.75 miles Digital Realty: DFW29
3.77 miles Digital Realty: DFW20
3.83 miles Digital Realty: DFW21
3.86 miles Digital Realty: DFW28
3.86 miles DataBank North Dallas DFW2
3.86 miles Digital Realty: DFW35
3.91 miles Digital Realty: DFW17
3.94 miles Digital Realty: DFW18
4.01 miles Equinix Dallas DA10
4.03 miles Digital Realty: DFW16
4.08 miles Rackspace Richardson DFW3
4.09 miles Digital Realty: DFW25
4.11 miles Digital Realty: 1201 N Bowser
4.16 miles Skybox: Atlantic Station
4.22 miles Digital Realty: DFW42
4.28 miles NTT 2300 W Plano
4.35 miles Verizon Dallas (Richardson)
4.62 miles OneSource Cloud: Richardson
5.08 miles Flexential Dallas (Synergy Park)
5.13 miles Lincoln: Plano DFW5
5.72 miles CoreWeave Plano
5.76 miles Lincoln Rackhouse: 1000 Coit
5.95 miles Evocative: Dallas DAL6
5.97 miles Mapletree: 1221 Coit
6.16 miles Centersquare: Allen DFW2
6.17 miles Voltage Park: Allen (Centersquare DFW2)
6.23 miles AT&T: Allen Data Center
7.41 miles Provident: Garland
8.70 miles H5 Colo
8.92 miles Cisco Allen
9.06 miles Tierpoint Dallas-Allen
9.06 miles Compass: Allen II
9.07 miles DataCanopy: Allen, TX
9.07 miles Compass Allen I
9.09 miles East PointInterested in this information?Contact us
9.11 miles CyrusOne Allen DFW3
9.23 miles CyrusOne Allen DFW4
9.25 miles CentralInterested in this information?Contact us
9.27 miles Stack: DFW01A
9.28 miles DXC: Plano Data Center
9.28 miles DataBank DFW7 LBJ
9.29 miles Equinix Dallas DA7
9.33 miles Stack: DFW01B
9.44 miles CyrusOne: Allen DFW5
9.44 miles Stack: DFW01C
10.27 miles DataBank: DFW3
10.28 miles DataBank: DFW8
10.39 miles VAZATA Dallas (DAL I & III)
10.40 miles Digital Realty: DFW11
10.45 miles TRG Datacenters: Dallas DFW1
10.59 miles Resilience DFW
10.64 miles Aphorio Carter: Farmers Branch, TX
10.67 miles Edge Node: Farmers Branch
10.80 miles M&A Technology: ServerPhase
11.00 miles M&A Technology: Alpha Data Center
11.00 miles JPMorgan Chase: Carrollton Data Center
11.01 miles Digital Realty: DFW12
11.02 miles VAZATA Horizon Dallas (DAL II)
11.90 miles Evocative: McKinney DA2
11.91 miles Experian: McKinney (Evocative DA2)
12.85 miles Atmos Energy: Dallas Data Center
13.48 miles AIB Data Centers: Collin County, TX
13.54 miles Centersquare: Dallas DFW3
13.66 miles SMU: Data Center
15.07 miles Teleperformance: McKinney Data Bunker
15.11 miles VAZATA: McKinney
15.34 miles CyrusOne Carrollton
15.37 miles DataCanopy: Carrollton, TX
15.77 miles Flō Networks: Dallas XCN (4316 Bryan)
15.82 miles AT&T: Dallas Tandem (4211 Bryan)
15.91 miles AT&T: Dallas Toll Building
16.17 miles Southwest Airlines: Dallas Data Center
16.39 miles DataBank DFW6 Love Field
16.76 miles Flexential Dallas Infomart I-V
16.76 miles Cologix: DAL2
16.77 miles Equinix Dallas DA11
16.78 miles Cologix: DAL3
16.79 miles Cologix: DAL1
16.80 miles BoA: Dallas Infomart
16.80 miles Lumen Dallas 2
16.82 miles Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy
16.82 miles DataBank DFW5
16.90 miles Equinix Dallas DA4
16.90 miles Digital Realty: DFW10
16.90 miles Earthlink Dallas
16.91 miles LOGIX Dallas (2323 Bryan)
16.93 miles Hivelocity: Dallas DAL1
16.94 miles Fiberhub DFW1
16.96 miles Prime: DFW01-01
16.98 miles CleanArc: Dallas Campus
16.99 miles Evocative DA4
17.01 miles Equinix: Dallas DA13
17.02 miles Prime: DFW01-02
17.03 miles Equinix: Dallas DA12
17.11 miles Sprocket DAL1
17.13 miles DataCanopy Dallas
17.13 miles Provision Data Services
17.13 miles Global IP Networks: Dallas
17.28 miles Digital Realty: DFW36
17.30 miles Colovore: Mesquite DFW01
17.31 miles Verizon: 1300 W Mockingbird
17.40 miles Carrier-Neutral Data CenterInterested in this information?Contact us
17.52 miles Lumen Dallas 3
17.56 miles DataBank DFW4 Empire Central
17.56 miles Cogent: 400 S Akard
17.56 miles Opus Interactive Dallas
17.56 miles ExxonMobil: Dallas Data Center
17.57 miles DataBank Downtown Dallas DFW1
17.57 miles Lumen Dallas 4
17.57 miles Sprocket DAL2
17.64 miles QuadraNet Dallas
17.65 miles Contegix Dallas
17.66 miles HostPapa DFW1
17.68 miles TierPoint Dallas (Colo4)
17.69 miles Lumen Dallas 6
17.74 miles CoreSpace Dallas
17.77 miles Cogent: Dallas 2
17.82 miles PowerHouse: Irving Bldg-B
17.82 miles PowerHouse: Irving Bldg-A
17.89 miles PowerHouse: Irving Bldg-C
17.98 miles KDC: Irving (University of Dallas)
18.03 miles Wowrack: DAL01
18.06 miles Kyndryl: Dallas (1000 Belleview)
18.13 miles Lumen Dallas 1
18.31 miles CoreSite: Irving DA1
18.49 miles Cogent: Irving
18.79 miles Equinix Dallas DA9
19.14 miles CyrusOne: Lewisville DFW2
19.15 miles Lightedge: Dallas (Lewisville)
19.32 miles Digital Realty: DFW26
19.55 miles Real Estate Data CenterInterested in this information?Contact us
19.59 miles Wells Fargo: Lewisville (Digital Realty DFW44)
19.61 miles Digital Realty: DFW44
19.62 miles Edged Energy: DFW01-1
19.71 miles South PointInterested in this information?Contact us
19.72 miles QTS: Irving DC6
19.73 miles Edged Energy: DFW01-2
19.74 miles Station BetaInterested in this information?Contact us
19.74 miles QTS: Irving DC5
19.83 miles QTS Irving DC3
19.85 miles South PlazaInterested in this information?Contact us
19.85 miles QTS: Irving DC4
19.87 miles Plaza TwoInterested in this information?Contact us
19.87 miles QTS Irving DC1
19.88 miles DTCC: Coppell

Flexential Dallas (Plano) Data Center Photos See all

Map of Flexential's Network and Data Center Locations
Source: Flexential

Operating Company

Operated by:

Flexential is a U.S. data center operator formed when Peak 10 acquired ViaWest in August 2017 for $1.67 billion. The company subsequently rebranded in January 2018 as a single company.

The company provides colocation, interconnection, cloud, and managed services. The company is backed by private equity firm GI Partners, which agreed to acquire Peak 10 in 2014. ViaWest was founded in 1999 in Denver and Peak 10 in 2000 in Charlotte, with each building regional data center portfolios before combining in 2017.

Flexential History:

  • In January 2018, Rebranded from Peak 10 + ViaWest to Flexential.
  • In August 2017, Peak 10 completed the acquisition of ViaWest from Shaw Communications for approximately US$1.675 billion.
  • In November 2015, ViaWest agreed to acquire INetU for US$162.5 million.
  • In June 2015, ViaWest agreed to acquire AppliedTrust.
  • In March 2000, Peak 10 was founded in Charlotte, North Carolina.
  • In April 1999, ViaWest was founded in Denver as a roll-up of ISPs
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Giga Energy Signs $1B, 10-Year Lease for 60MW Hunt County Data Center
Giga Energy has signed a 10-year lease worth about $1 billion at its Project Clay data center in Hunt County, Texas. The agreement, [announced](https://www.gigaenergy.com/news/giga-news-hunt-county...

Giga Energy Signs $1B, 10-Year Lease for 60MW Hunt County Data Center

November 18, 2026 Giga Energy

Giga Energy has signed a 10-year lease worth about $1 billion at its Project Clay data center in Hunt County, Texas. The agreement, announced on November 17, covers 60MW of capacity for an undisclosed U.S.-based AI cloud provider. Giga Energy develops, owns, and operates the campus, Reuters...

Read more
Read Equinix Affiliate Files for $500M DA13 Data Center in Dallas
An affiliate of [Equinix](https://baxtel.com/data-centers/equinix) has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The applicati...

Equinix Affiliate Files for $500M DA13 Data Center in Dallas

November 16, 2026 Equinix

An affiliate of Equinix has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The application puts a four-story, 372,445-square-foot building at 1520 West Mockingbird Lane, in an industrial area near Love Field, as Data Center...

Read more
Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.