Colovore: Fort Worth DFW02

Latest Podcast Heritage Parkway
Planned
Future facility in planning stage
Operated by:

Colovore: Fort Worth DFW02

Site planned for 2027 and has expansions through 2028
Utility Provider: Oncor

Site History

  • 2026-06-15 — Site disclosed on Colovore's capacity roadmap (shared with Baxtel), with four data halls slated for Oct 2027 – Sep 2028 service.

Project Profile

  • Developer/operator: Colovore (King Street Capital-backed), building on spec
  • Building: ~158,000 sqft, four data halls (~21,000 sqft each)
  • Fully liquid-cooled high-density design
  • Site code: DFW02

Map and Nearby Locations

Heritage Parkway
Colovore Sites
Nearby Facilities

Colovore: Fort Worth DFW02 Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Colovore: Fort Worth DFW02

Distance Site About
2.67 miles QTS: FTW1 DC1 Expansion
QTS is expanding its Fort Worth data center campus for the third time with a $300 million, 147,946-square-foot addition at 14100 Park Vista Boulevard.
2.85 miles QTS: FTW1-DC2
QTS Data Centers is building a second data center adjacent to its first one near the Alliance Texas development. The two-story building is set to span 471,875 sq ft (43,840 sqm) and see $220 million invested in the project.
2.85 miles ThreeInterested in this information?Contact us
When completed, the Fort Worth site will be Facebook’s largest data center to date, four buildings connected to form two “H” shapes, plus one standalone center, for a total of 20 data hall
2.87 miles QTS Dallas Fort Worth
QTS's Forth Worth site is the company's second data center in Dallas Market.
3.21 miles STACK Fort Worth Alliance
STACK's expansion Alliance campus in Fort Worth
3.22 miles Tierpoint Fort Worth
The property came to market in 2023 and was acquired by Tierpoint.
3.87 miles PowerHouse: Circle T Campus
PowerHouse Data Centers is expanding its Texas footprint with plans for the Circle T Data Center, a campus spanning nearly 88 acres in Westlake, just north of Fort Worth.
3.95 miles Citigroup Fort Worth
5.14 miles CampusInterested in this information?Contact us
Google has officially backed out of its plans for the Northlake Logistics Park in Denton County, marking a strategic shift away from the previously leased 1-million-square-foot facility.
5.23 miles Campus AlphaInterested in this information?Contact us
Google has officially backed out of its plans for the Northlake Logistics Park in Denton County, marking a strategic shift away from the previously leased 1-million-square-foot facility.
7.20 miles ACS: Fort Worth Expansion
7.33 miles ACS: Fort Worth, Texas
The proposed development, located on a 107-acre site near Hicks Field Road, will feature five buildings and an associated substation.
7.58 miles CyrusOne: DFW7
Dubbed DFW7, the project will encompass 1.9 million square feet and feature multiple buildings.
12.36 miles Rackspace Grapevine DFW1
15.82 miles Lumen Fort Worth 2
15.97 miles Lumen For Worth 3
15.99 miles Carrier-Neutral Data CenterInterested in this information?Contact us
H5 Data Centers is launching a new multi-phase development in the Dallas-Fort Worth metroplex, with Phase 1 officially greenlit for pre-leasing.
16.13 miles LOGIX Fort Worth
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
16.30 miles Lumen Fort Worth 1
16.96 miles Core Scientific: Denton, TX
Core Scientific plans to spend as much as $6.1 billion to refurbish its data center in Denton, Texas, turning it from a crypto facility into an AI site.
17.15 miles QumulusAI: Denton, TX
Located on four acres near Western Boulevard and Jim Christal Road, the facility will house eight prefabricated "pods" designed for AI and cryptomining.
17.60 miles Digital Realty: Project Gold Lewisville
Digital Realty's Project Gold is located on Edmonds Lane in Lewisville. The project consists of a single-story shell data center with space for three data halls on a 182,969 sq ft (17,000 sqm) site.
17.62 miles West RidgeInterested in this information?Contact us
17.89 miles Digital Realty: DFW26
In 2012, Digital Realty Trust acquired the Convergence Business Park, an 831,400 square-foot data center and office campus in the Dallas suburb of Lewisville, Texas.
18.05 miles Lightedge: Dallas (Lewisville)
LightEdge leases space from CyrusOne Lewisville DFW2.
18.06 miles CyrusOne: Lewisville DFW2
Two independent power grids Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
18.68 miles Centersquare: Fort Worth DFW1
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.
19.59 miles QTS: DFW2-DC4
QTS is developing a 413,726-square-foot data center in a two-story building, featuring office and shell data hall space, in Fort Worth.
19.76 miles QTS Irving
In 2013 QTS acquired the former Maxim semiconductor plant. It was QTS's first data center in the Dallas market
19.89 miles QTS Irving DC3
The QTS Irving 1 DC3 facility will provide our customers with an on-site substation and diverse campus fiber entrances with a redundant campus conduit system.
19.90 miles QTS: Irving DC6
QTS Irving DC6 is located in the Irving area of Dallas, Texas.
19.94 miles QTS: Irving DC5
QTS Irving DC5 is located in the Irving area of Dallas, Texas.
19.95 miles QTS: Irving DC4
QTS Data Centers is building the Irving DC4 facility at 3 Longhorn Drive, Irving, TX.

Operating Company

Operated by:

Colovore is a Bay Area's colocation provider

0
Facilities
0
Markets

News See all

Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read DataBank Raises $2bn for Dallas Data Center Buildout
DataBank Raises $2bn for Dallas Data Center Buildout

DataBank Raises $2bn for Dallas Data Center Buildout

April 22, 2026 Dallas

US data center firm DataBank has secured new financing to support the build-out of three data centers in Dallas, Texas. The company this week announced it has obtained a $2 billion loan to fund construction of the first three facilities at its new Red Oak campus. DataBank said the deal represents...

Read more
Read Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park
Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park

Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park

June 18, 2025 Dallas

Cawley Partners has acquired 5,200 acres south of Dallas to potentially develop a large data center park outside Dallas. The acquired South Creek Ranch in the City of Ferris is set to see a mix of uses, including data centers, logistics, manufacturing, and residential. “This particular piece of...

Read more
Read Fort Worth Data Center For Sale Following Bankruptcy
Fort Worth Data Center For Sale Following Bankruptcy

Fort Worth Data Center For Sale Following Bankruptcy

February 02, 2023 Dallas

Following a bankruptcy filing, a recently converted data center is for auction. This week, Hilco Real Estate declared March 23, 2023, as the deadline for qualifying bids for the Chapter 11 bankruptcy sale of a newly converted flex industrial facility into a data center. Built in 2018 on a...

Read more
Read Colovore To Develop a 9MW Liquid-Cooled Data center in Santa Clara
Colovore To Develop a 9MW Liquid-Cooled Data center in Santa Clara

Colovore To Develop a 9MW Liquid-Cooled Data center in Santa Clara

November 04, 2022 Colovore

Colovore has announced its plans to build a new data center in Santa Clara, California. The US data center company revealed that it would be developing its second facility in the city at 3060 Raymond Street. The data center is located adjacent to its existing facility at 1101 Space Park Drive....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?