DataCanopy Dallas

Latest Podcast
1807 Ross Ave
Operational
Fully operational facility
Operated by:

DataCanopy Dallas

░░░ Request Dataset MW
Total Power

This is a former Hosting.com facility that was acquired from Ntirety in 2023.

Map and Nearby Locations:

1807 Ross Ave
DataCanopy Sites
Nearby Facilities

Sites within 15 miles of DataCanopy Dallas

Distance Site About
0.34 miles Carrier-Neutral Data Center Request Dataset
0.34 miles Aphorio Carter: Dallas
The Dallas Data Center is a premier colocation facility located on a 7.61-acre campus in Dallas, Texas. Spanning 125,538 rentable square feet, the property is fully leased to a prominent, NYSE-listed global consumer internet company.
0.37 miles Equinix Dallas DA4
0.37 miles Digital Realty: DFW10
Digital Realty's 2323 Bryan Street is an internet gateway and carrier facility in Dallas. Located in the Central Business District (CBD), the building consists of 26 floors and approximately 477,000 SF of datacenter, PBB and office space. Telx (acquired by DRT) operated the building's Meet-Me Room (MMR). The 35,036 sqft MMR is in suite 2440.
0.37 miles LOGIX Dallas (2323 Bryan)
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
0.37 miles Earthlink Dallas
0.39 miles Provision Data Services
The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.
0.39 miles Sprocket DAL1
0.41 miles Lumen Dallas 3
0.56 miles 400 S Akard - Digital Realty
The building is a eight story (7 stories with a basement) multi-tenant data center.
0.56 miles Opus Interactive Dallas
In 2014, Opus Interactive expanded its data center footprint in Dallas, Texas, with additional colocation and cloud hosting infrastructure.
0.57 miles Cogent: 400 S Akard
0.57 miles Sprocket DAL2
0.57 miles DataBank Downtown Dallas DFW1
DataBank's 400 South Akard is a seven-story property built in 1921 to house the U.S. Federal Reserve Bank of Dallas. In 2000 the building was renovated as a datacenter, taking advantage of security features from its use as a banking facility.
0.57 miles Lumen Dallas 4
1.46 miles Lumen Dallas 2
1.46 miles Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy
The Infomart is the center of network Interconnection and Peering in Dallas. In fact, the Infomart is the nexus of the Interconnection marketplace for the entire South Central United States. The only other building with reasonable network density is Digital Realty's 2323 Bryant Street.
1.47 miles Flexential Dallas Infomart I-V
1.48 miles Cologix: Dallas DAL1
Cologix DAL1 & DAL2 and DAL 3 are located in the carrier dense Infomart.
1.49 miles DataBank DFW5
1.50 miles Verizon Dallas (Infomart)
Verizon established a new Point of Presence (PoP) in the Infomart Dallas carrier-neutral Building Meet-Me Room (BMMR) in August 2017.
1.51 miles Cologix: DAL2
DAL2 is a 12,000-square-foot facility located in the Infomart building at 1950 North Stemmons Freeway. Cologix opened its second site at the Dallas Infomart in 2013.
1.52 miles Cologix: DAL3
DAL3 is a 13.2K SQFT facility located in the renowned Infomart building at 1950 North Stemmons Freeway.
1.59 miles Equinix Dallas DA11
DA11 is Equinix's expansion next to the Infomart.
2.45 miles CleanArc: Dallas Campus
CleanArc Data Centers and Crow Holdings are partnering to develop a turnkey data center campus in central Dallas, Texas.
3.61 miles Contegix Dallas
3.61 miles QuadraNet Dallas
3.61 miles HostPapa DFW1
3.63 miles TierPoint Dallas (Colo4)
The site was formerly operated by Colo4 before being acquired by TierPoint in 2010
4.14 miles Equinix: Dallas DA12
Equinix is expanding its Texas footprint with the development of DA12, a massive $836 million data center campus located at the former Taylor Publishing site in West Dallas.
4.19 miles Lumen Dallas 1
4.46 miles Verizon: 1300 W Mockingbird
Former XO facility
4.72 miles CoreSpace Dallas
4.91 miles DataBank DFW4 Empire Central
The site was acquired by Zayo in January 2016 from Stream Datacenters.
5.11 miles 8435 Stemmons - Digital Realty
5.20 miles DataBank DFW6 Love Field
5.65 miles Lumen Dallas 6
5.75 miles Fiberhub DFW1
5.75 miles Prime: Dallas DFW01
In April 2023, Prime Data Centers discreetly added Dallas to its list of data center locations. The company now has a presence at 1515 Round Table Drive in Dallas, offering 6MW of capacity across a 106,865 square foot (9,930 square meter) facility.
5.78 miles Evocative DA4
This site (DA4) was sold to Evocative in 2022 by Carrier-1.
5.81 miles Prime: DFW01-02
Prime Data Centers is planning to develop a three-story, 96,800 sq ft (8,995 sqm) data center at 1455 Round Table Drive in Dallas County.
7.12 miles Edged Energy: Dallas, Tx
In January 2025, Edged Energy launched its data center in Irving, Texas..
7.19 miles Equinix Dallas DA9
Equinix acquired DA9 in Irving as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DFW1.
7.28 miles Edged Energy: DFW01-2
This facility will be a part of Edged Energy's Dallas Campus in Texas.
8.82 miles Hyperscale Data Center Request Dataset
Microsoft plans to build four data centers, with Irving City Council approving separate tax incentives for each facility.
9.44 miles H5 Colo
9.47 miles DataBank DFW7 LBJ
9.59 miles Centersquare: Dallas DFW3
The Centersquare Dallas portfolio consists of three data centers located in Fort Worth, Allen and Dallas providing close proximity to business hubs in downtown Dallas, Plano and Fort Worth.
10.33 miles Digital Realty: DFW14
10.59 miles PowerHouse: Irving DC3
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
10.68 miles PowerHouse: Irving DC2
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
10.78 miles PowerHouse: Irving, TX
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
11.49 miles Mobius: Farmers Branch
11.68 miles Hyperscale Data Center Request Dataset
Amazon Web Services (AWS) operates a 30,000 square foot (2,790 sq m) data center located in DeSoto, outside Dallas, Texas.
12.18 miles Crypto Mining Data Center Request Dataset
In northern Texas, Project Fei is a data center project co-located with a 240 MW utility-scale solar farm.
12.77 miles 900 N Dorothy
12.81 miles Verizon Dallas (Richardson)
12.83 miles QTS: Irving DC4
QTS Data Centers is building the Irving DC4 facility at 3 Longhorn Drive, Irving, TX.
12.90 miles QTS: Irving DC5
QTS Irving DC5 is located in the Irving area of Dallas, Texas.
12.91 miles QTS Irving DC3
The QTS Irving 1 DC3 facility will provide our customers with an on-site substation and diverse campus fiber entrances with a redundant campus conduit system.
12.95 miles QTS: Irving DC6
QTS Irving DC6 is located in the Irving area of Dallas, Texas.
13.06 miles QTS Irving
In 2013 QTS acquired the former Maxim semiconductor plant. It was QTS's first data center in the Dallas market
13.29 miles Digital Realty: DFW25
Located in the epicenter of North Dallas' high-technology corridor on the 69-acre Digital Dallas campus, this facility offers over 100,000 square feet of space and connectivity to more than 60 network service providers.
13.29 miles Rackspace Richardson DFW3
In 2012, US hosting company Rackspace signed a long-term lease for more than 58,000 sq ft of raised floor space at Digital Realty Trust's data center campus in Richardson, Texas (Dallas metro).
13.37 miles Digital Realty: DFW16
This facility is a part of Digital Dallas Campus in Richardson.
13.38 miles Equinix Dallas DA10
The site was previously was a Terremark NAP of Dallas
13.38 miles Digital Realty: DFW18
This facility is a part of Digital Dallas Campus in Richardson
13.39 miles Project Labrador
WHL Dallas 45 LLC has filed development plans for Project Labrador, a massive data center campus planned for a 419-acre site in the Lancaster area of Dallas.
13.42 miles Digital Realty: DFW35
This facility is a part of Digital Dallas Campus in Richardson.
13.44 miles Digital Realty: DFW17
This facility is a part of Digital Dallas Campus in Richardson
13.45 miles DataBank North Dallas DFW2
The facility is located in Northern Dallas in the Technology Business Corridor
13.51 miles Digital Realty: DFW28
This facility is a part of Digital Dallas Campus in Richardson
13.51 miles 365 Richardson, TX
13.52 miles Digital Dallas Campus in Richardson - Digital Realty
13.56 miles Digital Realty: DFW29
This facility is a part of Digital Dallas Campus in Richardson.
13.66 miles Yondr: Lancaster Expansion
13.66 miles Yondr: Lancaster, TX
Yondr Group is expanding its U.S. presence with a new data center campus in Lancaster, Texas.
13.68 miles AT&T Switching Station (Richardson)
A fire in October 2018 at this AT&T switching site caused a widespread outage of AT&T Internet and U-Verse TV services across North Texas.
13.73 miles Digital Realty: DFW12
The 69-acre Digital Dallas data campus is situated along primary fiber routes and has the unique distinction of having the privately owned, on-site 138kV substation fed from two independent utility substations.
13.75 miles VAZATA Horizon Dallas (DAL II)
VAZATA’s Dallas Data Center DAB (Dal II) Features 12,500 of move-in-ready Tier III (with Tier IV attributes) data center space.
13.86 miles Project Labrador Expansion
14.32 miles Centersquare: Fort Worth DFW1
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.
14.56 miles Prime: Garland, TX
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
14.57 miles Prime: DFW02-02
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
14.62 miles Project Orange
WHL Dallas 45 LLC has filed development plans for Project Orange, a massive data center campus planned in the Lancaster area of Dallas.
14.63 miles Project Orange Expansion
14.64 miles Stack: DFW02 Campus
Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments.
14.64 miles Stack: DFW02D
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
14.66 miles Prime: DFW02-03
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
14.66 miles Flexential Dallas (Synergy Park)
14.67 miles Stream: Dallas DFWC1
Stream Data Centers is currently developing its second hyperscale campus in Wilmer, Texas, situated in South Dallas County.
14.73 miles Stack: DFW02E
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
14.75 miles Stream: DFWC Expansion
14.77 miles Stack: DFW02B
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
14.82 miles Stack: DFW02F
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
14.88 miles Stack: DFW02C
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
14.91 miles DigiCo: Dallas DAL1
In January 2025, the newly established DigiCo Infrastructure REIT acquired State Farm’s Richardson data center from JDM III AZ LLC. The 129,170 sq ft facility, which was originally built by the insurance provider in 2015.
14.98 miles CyrusOne: Dallas DFW6
CyrusOne invested $79.8 million to retrofit an existing building in Richardson, Texas, transforming it into their new DFW6 data center.
15.03 miles QTS: DFW2-DC1
QTS is building a new data center campus outside Dallas, Texas. The company aims to develop a two-story, 413,725 sq ft (38,436 sqm) building in the Lancaster area of Dallas County.
15.07 miles QTS: DFW2-DC2
The Texas Department of Licensing and Regulation (TDLR) received two applications from QTS for data center developments in Wilmer, Dallas County.
15.14 miles Skybox: PowerCampus Dallas
The Skybox PowerCampus is Located at Oncor’s deregulated power territory, Lancaster, TX. PowerCampus™ Dallas will strategically address emerging high-density compute needs in the Dallas area providing up to 300 MWs of power
15.18 miles QTS: DFW2-DC3
QTS is expanding its DFW2 data center campus through the construction of two additional buildings in Wilmer, Dallas County.
15.30 miles Stream: Dallas DFWB
Stream Data Centers is building a 690,000 sq. ft. hyperscale campus on 77 acres in Wilmer. The first 135,000 square-foot (12,540 sq. m.) phase of the project is located near I-45 and East Belt Line Road in Wilmer.
15.59 miles Digital Realty: DFW37
Digital Realty has filed to expand its planned data center campus in the Garland area of Dallas, Texas. The company is planning to construct a 410,000 sq ft (38090 sqm) data center building comprised of a tenant office and six data halls.
15.62 miles Digital Realty: 1505 Ferris
DRT's 181,200 square foot (16,800 sqm) core & shell data center is located on Ferris Road in Garland, TX.
15.69 miles NTT: TX4
NTT is expanding in Garland, adding another building to its existing campus. The project will consist of a new 235,910 sq ft (21,915 sqm) data center.
15.70 miles NTT 2300 W Plano
In January 2019, GI Partners bought the more than 1 million-square-foot office and tech complex at 2300 W. Plano Parkway near Bush Turnpike.
15.76 miles NTT: TX3
NTT TX3 is the third building of NTT's Garland campus. The datacenter building is approximately 229,500 square feet in size consisting of additional office space and adding equipment to data vaults.
15.79 miles NTT TX2
NTT TX2 is the second building of NTT's Garland campus. The datacenter building is 229,500 square feet in size with two-story office and loading dock located on the ground floor.
15.81 miles Digital Garland
15.87 miles NTT Dallas TX1
RagingWire’s Dallas TX1 Datacenter is a 16 megawatt facility with 230,000 square feet of data center space. TX1 is the first phase of a 42 acre campus that can expand capacity up to 80 megawatts and 1 million sqft spread across 5 interconnected buildings.
15.95 miles Hyperscale Data Center Request Dataset
CoreWeave launched a new $1.6 billion data center in Plano, Texas, which became operational at the end of 2023.
15.96 miles Mapletree: 1221 Coit
15.96 miles Evocative: Dallas DAL6
Evocative acquired the DAL6 data center in Dallas, Texas in 2022. Spanning an impressive 111,000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
15.97 miles Lincoln Rackhouse: 1000 Coit
16.03 miles Stream: DFW V
In 2015, Texas-based Stream Data Centers sold a 73,320 sqft data center to a local financial services company and was then immediately hired to run it.
16.04 miles Stream: DFWA-1
In January 2020, Stream commissioned phase I of a greenfield hyperscale data center development on a 23-acre site in Garland, next to northeast Dallas, Texas.
16.09 miles CyrusOne Carrollton
60,000 SqFt of Office Space Power Density: 150–200+ watts/SqFt
16.13 miles EdgeCore Dallas
16.16 miles DataCanopy: Carrollton, TX
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
16.37 miles Cisco Richardson TXDC1
16.46 miles Digital Realty: DFW11
The Digital Realty 100,000sqft data center was built in 2000, renovated in 2008. The site is located near the George Bush Turnpike and North Dallas Tollway and provides an ideal data center location. VAZATA is the largest tenant.
16.46 miles VAZATA Dallas (DAL I & III)
The VAZATA site was previously known as: Horizon Dallas (DAL I)
16.48 miles Ascent Dallas DAL1
16.63 miles Compass: Red Oak V
Compass Roadrunner Bldg 5 is located at its Red Oak campus. Building 5 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
16.66 miles Compass: Red Oak VIII
16.67 miles Compass: Red Oak IX
16.73 miles Compass: Red Oak IV
Compass Roadrunner Bldg 4 is located at its Red Oak campus. Building 4 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
16.75 miles Compass: Red Oak VII
16.76 miles Compass: Red Oak X
16.81 miles Compass: Red Oak III
Compass Roadrunner Bldg 3 is located at its Red Oak campus. Building 3 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
16.84 miles Stream DFW IV
In 2010, Stream Data Centers purchased a 20,000 SF warehouse in Richardson and began development of a 10,000 SF data hall.
16.84 miles Compass: Red Oak VI
This Facility is part of Compass' Red Oak data center campus in Texas.
16.84 miles Mapletree: 3300 Essex
In 2010, Stream Data Centers purchased a 20,000 SF warehouse in Richardson and began development of a 10,000 SF data hall.
16.90 miles Compass: Red Oak II
Compass Roadrunner Bldg 2 is located at its Red Oak campus. Building 2 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
16.99 miles Compass: Red Oak I
Compass Roadrunner Building 1, also known as DFW III-II Building 1, is located at its Red Oak campus. The facility at 300 Houston School Road spans a 251,815 sq ft (23,395 sqm) data center space.
17.02 miles Aligned Plano
Aligned's DFW-01 data center is located on a 19-acre campus at 2800 Summit Avenue in Plano. The facility offers 375000 gross square feet of space and 60 megawatts of power.
17.02 miles Evocative: DAL1
17.03 miles Hyperscale Data Center Request Dataset
The Red Oak data center is located on 166 acres in the northwest quadrant of Farm-to-Market 664 and State Highway 342, which is across Ovilla Road (FM 664) from Triumph Aerospace Structures.
17.05 miles Global IP Networks - Plano
17.05 miles Aligned: DFW-02
Aligned DFW-02 is the second building of Aligned's Plano Data center campus. DFW-02 is part of a 19-acre campus offering 36 megawatts of critical capacity across 220,000 sq. ft.
17.11 miles Compass Red Oak Campus
Located in south of the Metro, Compass’ second metro campus can expand to more than 155 acres and 262 MW of power.
17.26 miles Flexential Dallas (Plano)
Flexential's Plano site in Dallas is former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017.
17.33 miles DataBank: DFW16
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
17.42 miles DataBank: DFW15
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
17.46 miles DataBank: DFW12
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
17.49 miles DataBank: DFW14
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
17.56 miles DataBank: DFW13
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
17.58 miles DataBank: DFW11
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
17.64 miles DataBank: DFW10
DataBank is building a second data center at its upcoming Red Oak campus in Dallas, Texas.
17.75 miles Databank: Red Oak DFW9
DataBank is planning a $256 million data center project in Red Oak, Ellis County, Texas. The facility, named DFW9, will be located on Stainback Road and cover over 425,000 sq ft (40,000 sqm).
18.54 miles Cawley Partners: South Creek Ranch
The initial plans for this expansive property designate 2,000 acres in the northern section specifically for digital commerce parks, which will include data centers.
18.67 miles CyrusOne: Lewisville DFW2
Two independent power grids Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
18.71 miles Digital Realty: DFW26
In 2012, Digital Realty Trust acquired the Convergence Business Park, an 831,400 square-foot data center and office campus in the Dallas suburb of Lewisville, Texas.
18.94 miles Lightedge: Dallas (Lewisville)
LightEdge leases space from CyrusOne Lewisville DFW2.
19.06 miles Digital Realty: Project Gold Lewisville
Digital Realty's Project Gold is located on Edmonds Lane in Lewisville. The project consists of a single-story shell data center with space for three data halls on a 182,969 sq ft (17,000 sqm) site.
19.24 miles STACK Dallas-Fort Worth DFW01
There are three data centers on the campus: #1 is a 317,800 sqft data center with 21 MW of critical power #2 up to 11 MW #3 is a LEED Silver certified, concurrently maintainable data center with 94,400 square feet of technical space and 10.75MW of available power from two local substations.
19.26 miles Equinix Dallas DA7
Equinix invested more than $20 million for the DA7 IBX data center, which currently includes 1,200 cabinets
19.37 miles STACK DFW01B
STACK’s DFW01B data center boasts a substantial footprint of 156000 square feet area. This facility offers up to 11MW of critical capacity, with 2.2MW immediately available.
19.41 miles Stack: DFW01 Future Expansion
STACK Infrastructure's DFW01 Future Expansion offers a build-to-suit expansion opportunity with 50MW of accessible power, adjacent to DFW01A and DFW01B data centers.
19.63 miles Resilience DFW
The Skybox campus can be expanded to 350,000 square foot capacity to host servers and provide 60 megawatts of power in later phases.

DataCanopy Dallas Data Center Photos (See all)

Operating Company

Operated by:

Ntirety delivers managed hybrid and multi-cloud solutions to 3200 enterprise customers throughout the globe, serving customers globally from four continents and 14 data centers worldwide. Formed in 2018 through the merger of Hostway and HOSTING.com

27
Facilities
7
Markets
76MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?