UT System: Arlington Regional Data Center

Latest Podcast 200 E Loop 820
Operational
Fully operational facility
Operated by:

UT System: Arlington Regional Data Center

Year Built: 1988
Utility Provider: Oncor
Ownership: University of Texas owns the building.
Lot Size: 3 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power

The University of Texas System's Shared Information Services runs the Arlington Regional Data Center (ARDC), a two-story building on East Loop 820 in east Fort Worth. UT institutions place their own racks there, and the System provides two power feeds, fiber and round-the-clock staff. The building previously belonged to Trinity Recovery Services, a disaster-recovery company, and the UT Board of Regents bought it in 2006. The System added redundant chilled-water capacity in 2019-20.

Site History

  • 2020: Redundant chiller capacity is added.
  • 2006: The UT Board of Regents buys the building.
  • 1988: Trinity Recovery Services buys the building.

Map and Nearby Locations

200 E Loop 820
University of Texas Sites
Nearby Facilities

Sites within 15 miles of UT System: Arlington Regional Data Center

Distance Site About
4.90 miles Provident: North Richland Hills
Provident Data Centers has proposed a two-story data center on the former Santander operations center site on Rufe Snow Drive in North Richland Hills.
6.27 miles Cogent: Fort Worth
Cogent's Fort Worth data center is a former Sprint long-distance switching center on East Presidio Street, which Cogent offers for sale or wholesale lease.
6.44 miles Lumen Fort Worth 2
Lumen Fort Worth 2 is a Lumen network building at 1101 East 9th Street in Fort Worth, built in 1998 for IXC Communications.
6.70 miles Lumen Fort Worth 1
Lumen Fort Worth 1 is a Lumen network colocation site at 1601 Jones Street in downtown Fort Worth.
6.96 miles Station TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.99 miles AT&T: Fort Worth Edison
AT&T's Edison building on Houston Street is the main telephone exchange in downtown Fort Worth, a multi-story Southwestern Bell building from 1971 that also hosts AT&T cloud equipment.
7.03 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.04 miles Lumen For Worth 3
Lumen Fort Worth 3 is a Lumen network site in a 1925 office tower at 515 Houston Street in downtown Fort Worth.
7.08 miles LOGIX Fort Worth
LOGIX Fiber Networks ran a small colocation suite in the Oil & Gas Building on West 7th Street in downtown Fort Worth, which it stopped marketing in 2024.
7.31 miles D.R. Horton: Arlington Data Center
D.R. Horton built its own data center next to its headquarters area in Arlington, Texas, completed in 2022.
8.35 miles Mapletree: 5000 South Bowen
Mapletree Industrial Trust owns a former Atos data center on South Bowen Road in Arlington, Texas, which has stood empty since Atos's lease ended in 2023.
8.57 miles D.R. Horton: Fort Worth Data Center
D.R. Horton runs a company data center in its division office campus on North Freeway in north Fort Worth.
9.00 miles BNSF: Fort Worth Data Center
BNSF Railway runs a company data center on its headquarters campus in north Fort Worth.
9.71 miles Black Mountain: Fort Worth, TX
Black Mountain Power plans a four-building data center campus with an on-site substation on about 430 acres in southeast Fort Worth, next to Forest Hill; the city approved its site plan in August 2026.
9.76 miles Verizon: Euless Switching Center
Verizon Wireless's Euless switching center is a windowless network building on Bear Creek Parkway near DFW Airport, opened in 2021, that also hosts Amazon Web Services equipment.
9.89 miles Verizon: Arlington Data Center
Verizon Business runs a network data center in the former MCI WorldCom building on 113th Street in Arlington's Great Southwest Industrial District.
10.66 miles Alcon: Fort Worth Data Center
Alcon runs its own data center on its US headquarters campus on South Freeway in Fort Worth, Texas.
10.72 miles Centersquare: Fort Worth DFW1
Csquare's Fort Worth DFW1 is a colocation campus in the CentrePort business park near DFW Airport, built by Exodus around 2000 and owned by Csquare since 2025.
10.74 miles Voltage Park: Fort Worth (Csquare DFW1)
Voltage Park runs a GPU cloud deployment inside Csquare's DFW1 colocation campus at CentrePort in Fort Worth.
11.18 miles 5CDC: Dallas DFW01
5C Data Centers proposed converting a distribution warehouse on John Burgess Drive in southeast Fort Worth into a high-density data center; no conversion work has started.
12.30 miles Rackspace Grapevine DFW1
Rackspace ran its DFW1 data center in a Grapevine industrial building until late 2018, when it moved customers to its Richardson DFW3 facility.
12.54 miles HCA: Fort Worth Data Center
HCA Healthcare runs a regional data center for its Texas hospitals in a single-story building in the Overton Centre office park in southwest Fort Worth.
13.24 miles CyrusOne: DFW7
DFW7 is the first building on CyrusOne's Fort Worth campus on Asphalt Drive, on land bought from energy developer Eolian beside its Chisholm Grid battery plant.
13.38 miles CyrusOne: DFW8
DFW8 is the second building under way on CyrusOne's Fort Worth campus on Asphalt Drive, beside DFW7.
13.41 miles CyrusOne: Fort Worth Expansion
Later phases of CyrusOne's Fort Worth campus on Asphalt Drive, planned with energy developer Eolian beyond the DFW7 and DFW8 buildings.
13.64 miles South ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.64 miles Coravel: Hicks Field DFW12
Coravel's Hicks Field DFW12 is a planned two-story data center on its hyperscale campus on Hicks Field Road in far north Fort Worth.
13.66 miles Coravel: Hicks Field Expansion
Coravel's Hicks Field Expansion covers the last two of five planned buildings on its hyperscale campus on Hicks Field Road in far north Fort Worth.
13.72 miles PowerHouse: Circle T Campus
PowerHouse Data Centers plans a four-building data center campus on about 88 acres of Hillwood's Circle T Ranch in Westlake, north of Fort Worth.
13.88 miles Coravel: Hicks Field DFW13
Coravel's Hicks Field DFW13 is a planned two-story data center on its hyperscale campus on Hicks Field Road in far north Fort Worth.
13.88 miles Central CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.93 miles Verizon: Southlake NEC Data Center
Verizon runs a network and data center campus on West Dove Road in Southlake, north of DFW Airport, where a 2022-approved data hall expansion has not been built.
14.09 miles Point PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.09 miles Coravel: Hicks Field DFW11
Coravel's Hicks Field DFW11 is the first building of its hyperscale data center campus on Hicks Field Road in far north Fort Worth, under construction for a hyperscale tenant.
14.19 miles Tierpoint Fort Worth
TierPoint's Dallas-Fort Worth data center occupies the former Alliance Gateway / AIG facility on Independence Parkway in north Fort Worth. The site is built for high-density AI and HPC workloads, with direct-to-chip liquid cooling in production alongside air and chilled-water cooling. TierPoint is expanding the utility supply to the site and has room for further phases along the existing building line.
14.26 miles STACK Fort Worth Alliance
STACK Infrastructure, Hillwood and IPI Partners announced a hyperscale data center campus at AllianceTexas in north Fort Worth in 2019, but STACK dropped it without building.
14.48 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.78 miles QTS: FTW1-DC2
FTW1-DC2 is the second building on QTS's Fort Worth campus near AllianceTexas, a two-story, $220 million data center completed in 2026.
14.79 miles QTS: FTW1 Expansion
QTS is expanding its Fort Worth data center campus for the third time with a $300 million, 147,946-square-foot addition at 14100 Park Vista Boulevard.
14.87 miles QTS: FTW1-DC1
FTW1-DC1 is the original building on QTS's Fort Worth campus near AllianceTexas, a former Health Care Service Corporation data center that QTS bought in 2017.
15.30 miles Cloudnium: Irving
Cloudnium is converting a 1981 technical building on West Campus Circle Drive in Las Colinas, Irving, into a colocation data center and its headquarters.
15.72 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.74 miles QTS: Irving DC4
DC4 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in 2024 and fitted out for Microsoft in 2025.
15.76 miles North StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.76 miles QTS Irving DC1
QTS's first Dallas-area data center occupies the former Maxim semiconductor plant in Irving, Texas, and holds the campus's DC1 and DC2 data halls.
15.78 miles QTS Irving DC3
DC3 is a multi-story data center on QTS's Irving campus in Las Colinas, occupied by Microsoft, with an on-site substation and diverse campus fiber entrances.
15.86 miles Central StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.86 miles QTS: Irving DC5
DC5 is a two-story, $180 million data center on QTS's Irving campus in Las Colinas, completed in 2025 and occupied by Microsoft.
15.90 miles QTS: Irving DC6
DC6 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in late 2025 and fitted out for Microsoft in 2026.
15.91 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.97 miles Citigroup Fort Worth
Citigroup's South West Data Center is one of the bank's main US enterprise data centers, on Litsey Road in the AllianceTexas corridor north of Fort Worth.
16.08 miles Colovore: Fort Worth DFW02
Colovore's second Dallas-market facility, a purpose-built liquid-cooled colocation building on Heritage Parkway in north Fort Worth. Four-hall design following Colovore's standard high-density spec-build template, with service dates running late 2027 through 2028.
16.61 miles DTCC: Coppell
DTCC runs a data center complex in a former PSINet technical building on Crestside Drive in Coppell, north of Dallas.
17.00 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.02 miles Edged Energy: Ft. Worth DFW02
Edged's DFW02-1 is the first building of its two-building DFW02 campus at I-20 and Chapin School Road in Fort Worth's Veale Ranch area, under construction since 2026.
17.11 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.25 miles Edged Energy: DFW01-2
Edged's DFW01-2 is a two-story data center under construction on Loop 12 in Irving, the second building on its Dallas campus.
17.39 miles Edged Energy: DFW01-1
Edged's DFW01-1 is a waterless-cooled colocation data center in a converted warehouse on North Wildwood Drive in Irving, the first building on its Dallas campus.
17.40 miles Edged Energy: DFW02 Expansion
Edged's DFW02-2 is the second building of its DFW02 campus at I-20 and Chapin School Road in Fort Worth's Veale Ranch area.
17.62 miles Prime: DFW04-03
Prime Data Centers planned DFW04-03 as building 3 of three two-story data centers near Aledo Road and Chapin School Road, west of Fort Worth.
17.62 miles PowerHouse: Irving Bldg-C
Building C is the third of three powered-shell data centers PowerHouse Data Centers and Harrison Street plan on a 50-acre former distribution site in Las Colinas, Irving.
17.63 miles Rock Creek Expansion
Rock Creek Expansion covers buildings 2 through 5 of the planned Rock Creek data center campus in southwest Fort Worth.
17.63 miles Aligned: DFW-03
Aligned's DFW-03 is a two-story data center under construction on Britton Road in east Mansfield, south of Fort Worth.
17.67 miles Prime: DFW04-02
Prime Data Centers planned DFW04-02 as building 2 of three two-story data centers near Aledo Road and Chapin School Road, west of Fort Worth.
17.69 miles Prime: DFW04-01
Prime Data Centers planned DFW04-01 as building 1 of three two-story data centers near Aledo Road and Chapin School Road, west of Fort Worth.
17.70 miles PowerHouse: Irving Bldg-B
Building B is the second of three powered-shell data centers PowerHouse Data Centers and Harrison Street plan on a 50-acre former distribution site in Las Colinas, Irving.
17.70 miles PowerHouse: Irving Bldg-A
PowerHouse is developing its first Irving data center campus at 111 Customer Way, Irving, Texas, on a 50-acre site in the Las Colinas area. The project is a multi-phase, three-building development totaling 946,000 sq ft, with construction underway and the first building structurally completed in March 2026.
17.86 miles Rock Creek 1
Rock Creek 1 is the first of five data center buildings planned on land Walton Global holds east of Chisholm Trail Parkway in southwest Fort Worth.
17.87 miles Equinix Dallas DA9
Equinix acquired DA9 in Irving as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DFW1.
18.01 miles KDC: Irving (University of Dallas)
KDC plans a data center campus on University of Dallas land north of State Highway 114 at Tom Braniff Drive in Irving.
18.21 miles Cogent: Irving
Cogent Communications runs a small carrier-neutral colocation data center in a former Sprint technical building on East Grauwyler Road in Irving.
18.35 miles CoreSite: Irving DA1
CoreSite DA1 is CoreSite's first Texas data center, planned on the former Exela Technologies site at 2701 East Grauwyler Road in Irving.
19.45 miles Lumen Dallas 6
19.75 miles Digital Realty: DFW44
DFW44 is a single-story Digital Realty data center at 2501 Edmonds Lane in Lewisville, Texas, built to suit for a financial-services tenant and owned in a joint venture with Mitsubishi Corporation.
19.77 miles Digital Realty: DFW26
Digital Realty's DFW26 is the Convergence campus in Lewisville, Texas, a former Texas Instruments plant converted into ten connected buildings for data center, office and lab tenants.
19.85 miles Prime: DFW01-02
Prime Data Centers' DFW01-02 is a three-story data center next to DFW01-01 on Round Table Drive in northwest Dallas, with its first data hall under construction.
19.89 miles Evocative DA4
This site (DA4) was sold to Evocative in 2022 by Carrier-1.
19.92 miles Prime: DFW01-01
Prime Data Centers' DFW01-01 is a 1968 building on Round Table Drive in northwest Dallas that Carrier-1 converted to a data center in 2014.
19.93 miles Lightedge: Dallas (Lewisville)
LightEdge leases a suite in CyrusOne's Lewisville DFW2 data center north of Dallas.
19.94 miles CyrusOne: Lewisville DFW2
Two independent power grids Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
19.94 miles Fiberhub DFW1
Fiberhub's DFW1 is a retail colocation offering inside Prime Data Centers' DFW01-01 building on Round Table Drive in Dallas, opened in October 2018.
19.95 miles Hivelocity: Dallas DAL1
Hivelocity runs its Dallas DAL1 colocation and bare-metal server site in a suite inside Prime Data Centers' DFW01-01 building on Round Table Drive.
19.98 miles DataBank DFW4 Empire Central
DataBank's DFW4 is a single-story, purpose-built data center in the Stemmons corridor west of Dallas Love Field, run by Stream and then Zayo before DataBank.
19.99 miles CoreSpace Dallas
CoreSpace runs a colocation and hosting data center in a 1961 building on John W. Carpenter Freeway in northwest Dallas.

Operating Company

Operated by:

University of Texas Austin-The mission of The University of Texas at Austin is to achieve excellence in the interrelated areas of undergraduate education, graduate education, research and public service. The university provides superior and comprehensive educational opportunities at the baccalaureate through doctoral and special professional educational levels.

The university contributes to the advancement of society through research, creative activity, scholarly inquiry and the development of new knowledge. The university preserves and promotes the arts, benefits the state’s economy, serves the citizens through public programs and provides other public service.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north o...

PowerHouse Files Plans for 300MW Data Center Campus Near Dallas-Fort Worth

August 07, 2026 Dallas

PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...

Read more
Read DataBank Raises $2bn for Dallas Data Center Buildout
DataBank Raises $2bn for Dallas Data Center Buildout

DataBank Raises $2bn for Dallas Data Center Buildout

April 22, 2026 Dallas

US data center firm DataBank has secured new financing to support the build-out of three data centers in Dallas, Texas. The company this week announced it has obtained a $2 billion loan to fund construction of the first three facilities at its new Red Oak campus. DataBank said the deal represents...

Read more
Read Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park
Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park

Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park

June 18, 2025 Dallas

Cawley Partners has acquired 5,200 acres south of Dallas to potentially develop a large data center park outside Dallas. The acquired South Creek Ranch in the City of Ferris is set to see a mix of uses, including data centers, logistics, manufacturing, and residential. “This particular piece of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.