|
0.02 miles
|
Verizon Dallas (Infomart)
|
Verizon established a new Point of Presence (PoP) in the Infomart Dallas carrier-neutral Building Meet-Me Room (BMMR) in August 2017.
|
|
0.03 miles
|
Cologix: DAL3
|
DAL3 is a 13.2K SQFT facility located in the renowned Infomart building at 1950 North Stemmons Freeway.
|
|
0.03 miles
|
Flexential Dallas Infomart I-V
|
|
|
0.04 miles
|
Cologix: DAL1
|
Cologix DAL1 & DAL2 and DAL 3 are located in the carrier dense Infomart.
|
|
0.07 miles
|
DataBank DFW5
|
|
|
0.07 miles
|
Lumen Dallas 2
|
|
|
0.07 miles
|
Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy
|
The Infomart is the center of network Interconnection and Peering in Dallas. In fact, the Infomart is the nexus of the Interconnection marketplace for the entire South Central United States. The only other building with reasonable network density is Digital Realty's 2323 Bryant Street.
|
|
0.09 miles
|
Equinix Dallas DA11
|
DA11 is Equinix's expansion next to the Infomart.
|
|
1.02 miles
|
CleanArc: Dallas Campus
|
CleanArc Data Centers and Crow Holdings are partnering to develop a turnkey data center campus in central Dallas, Texas.
|
|
1.51 miles
|
DataCanopy Dallas
|
|
|
1.75 miles
|
Equinix Dallas DA4
|
Equinix DA4 is a colocation suite at 2323 Bryan Street in downtown Dallas that LayerOne opened in 2000 and Equinix acquired with Switch and Data in 2010.
|
|
1.75 miles
|
Digital Realty: DFW10
|
Digital Realty's 2323 Bryan Street is an internet gateway and carrier facility in Dallas. Located in the Central Business District (CBD), the building consists of 26 floors and approximately 477,000 SF of datacenter, PBB and office space.
Telx (acquired by DRT) operated the building's Meet-Me Room (MMR). The 35,036 sqft MMR is in suite 2440.
|
|
1.75 miles
|
LOGIX Dallas (2323 Bryan)
|
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
|
|
1.75 miles
|
Earthlink Dallas
|
|
|
1.76 miles
|
Lumen Dallas 3
|
|
|
1.79 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
1.88 miles
|
Provision Data Services
|
The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.
|
|
1.89 miles
|
Sprocket DAL1
|
|
|
2.00 miles
|
DataBank Downtown Dallas DFW1
|
DataBank's 400 South Akard is a seven-story property built in 1921 to house the U.S. Federal Reserve Bank of Dallas. In 2000 the building was renovated as a datacenter, taking advantage of security features from its use as a banking facility.
|
|
2.00 miles
|
Lumen Dallas 4
|
|
|
2.00 miles
|
Sprocket DAL2
|
|
|
2.00 miles
|
Cogent: 400 S Akard
|
|
|
2.00 miles
|
Opus Interactive Dallas
|
In 2014, Opus Interactive expanded its data center footprint in Dallas, Texas, with additional colocation and cloud hosting infrastructure.
|
|
2.00 miles
|
400 S Akard - Digital Realty
|
The building is a eight story (7 stories with a basement) multi-tenant data center.
|
|
2.24 miles
|
QuadraNet Dallas
|
|
|
2.24 miles
|
Contegix Dallas
|
|
|
2.25 miles
|
HostPapa DFW1
|
|
|
2.27 miles
|
TierPoint Dallas (Colo4)
|
The site was formerly operated by Colo4 before being acquired by TierPoint in 2010
|
|
2.66 miles
|
Equinix: Dallas DA12
|
Equinix is expanding its Texas footprint with the development of DA12, a massive $836 million data center campus located at the former Taylor Publishing site in West Dallas.
|
|
2.86 miles
|
Lumen Dallas 1
|
|
|
3.00 miles
|
Verizon: 1300 W Mockingbird
|
Former XO facility
|
|
3.31 miles
|
CoreSpace Dallas
|
|
|
3.47 miles
|
DataBank DFW4 Empire Central
|
DataBank's DFW4 is a single-story, purpose-built data center in the Stemmons corridor west of Dallas Love Field, run by Stream and then Zayo before DataBank.
|
|
3.64 miles
|
8435 Stemmons - Digital Realty
|
|
|
3.69 miles
|
DataBank DFW6 Love Field
|
DataBank's DFW6 is a colocation suite in a large multi-tenant data center building on Harry Hines Boulevard near Dallas Love Field.
|
|
4.19 miles
|
Lumen Dallas 6
|
|
|
4.26 miles
|
Prime: DFW01-01
|
In April 2023, Prime Data Centers discreetly added Dallas to its list of data center locations. The company now has a presence at 1515 Round Table Drive in Dallas, offering 6MW of capacity across a 106,865 square foot (9,930 square meter) facility.
|
|
4.26 miles
|
Fiberhub DFW1
|
|
|
4.29 miles
|
Evocative DA4
|
This site (DA4) was sold to Evocative in 2022 by Carrier-1.
|
|
4.32 miles
|
Prime: DFW01-02
|
Prime Data Centers is planning to develop a three-story, 96,800 sq ft (8,995 sqm) data center at 1455 Round Table Drive in Dallas County.
|
|
5.30 miles
|
CoreSite: Irving DA1
|
American Tower–owned CoreSite is expanding its footprint into Texas with its first facility in the state, designated as DA1.
|
|
5.78 miles
|
Equinix Dallas DA9
|
Equinix acquired DA9 in Irving as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DFW1.
|
|
5.80 miles
|
Edged Energy: DFW01-1
|
In January 2025, Edged Energy launched its data center in Irving, Texas..
|
|
5.97 miles
|
Edged Energy: DFW01-2
|
This facility will be a part of Edged Energy's Dallas Campus in Texas.
|
|
7.57 miles
|
Point GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
8.20 miles
|
Centersquare: Dallas DFW3
|
The Centersquare Dallas portfolio consists of three data centers located in Fort Worth, Allen and Dallas providing close proximity to business hubs in downtown Dallas, Plano and Fort Worth.
|
|
8.57 miles
|
DataBank DFW7 LBJ
|
DataBank's DFW7 is a colocation suite in a multi-tenant office building on the LBJ Freeway in North Dallas.
|
|
8.59 miles
|
Provident: Dallas-Fort Worth Metroplex
|
Northampton Capital Partners and Provident Data Centers have formed a joint venture to develop a data center within the North Dallas Corridor of the Dallas-Fort Worth Metroplex.
|
|
8.66 miles
|
H5 Colo
|
|
|
9.11 miles
|
PowerHouse: Irving Bldg-A
|
PowerHouse is developing its first Irving data center campus at 111 Customer Way, Irving, Texas, on a 50-acre site in the Las Colinas area. The project is a multi-phase, three-building development totaling 946,000 sq ft, with construction underway and the first building structurally completed in March 2026.
|
|
9.18 miles
|
Aphorio Carter: Farmers Branch, TX
|
A Farmers Branch, Texas data center, formerly Digital Realty DFW14, owned by Aphorio Carter and leased in full to a Singapore-based consumer internet company.
|
|
9.21 miles
|
PowerHouse: Irving Bldg-B
|
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
|
9.25 miles
|
PowerHouse: Irving Bldg-C
|
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
|
10.13 miles
|
TRG Datacenters: Dallas DFW1
|
TRG Data Centers' DFW1 facility is a 160,000 gross-square-foot data center situated in Farmers Branch, Texas, within the strategic Addison Fiber Hub just 12 miles from the Dallas Infomart.
|
|
10.30 miles
|
Mobius: Farmers Branch
|
|
|
11.34 miles
|
QTS: Irving DC4
|
DC4 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in 2024 and fitted out for a tenant in 2025.
|
|
11.35 miles
|
QTS: Irving DC5
|
DC5 is a two-story, $180 million data center on QTS's Irving campus in Las Colinas, completed in 2025.
|
|
11.42 miles
|
QTS Irving DC3
|
DC3 is a multi-story data center on QTS's Irving campus in Las Colinas, with an on-site substation and diverse campus fiber entrances.
|
|
11.46 miles
|
QTS: Irving DC6
|
DC6 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in late 2025 and fitted out for a tenant in 2026.
|
|
11.57 miles
|
QTS Irving DC1
|
QTS's first Dallas-area data center occupies the former Maxim semiconductor plant in Irving, Texas, and holds the campus's DC1 and DC2 data halls.
|
|
12.27 miles
|
900 N Dorothy
|
|
|
12.41 miles
|
Verizon Dallas (Richardson)
|
|
|
12.43 miles
|
Edge ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.50 miles
|
Digital Realty: DFW12
|
The 69-acre Digital Dallas data campus is situated along primary fiber routes and has the unique distinction of having the privately owned, on-site 138kV substation fed from two independent utility substations.
|
|
12.51 miles
|
VAZATA Horizon Dallas (DAL II)
|
VAZATA’s Dallas Data Center DAB (Dal II) Features 12,500 of move-in-ready Tier III (with Tier IV attributes) data center space.
|
|
12.64 miles
|
Digital Realty: DFW42
|
Digital Realty's DFW42 is a planned data center at 1122 Alma Road on the Digital Dallas campus in Richardson, Texas. The 17-acre site holds an existing office building and adjoining lots.
|
|
12.74 miles
|
Digital Realty: 1201 N Bowser
|
Digital Realty's 1201 N Bowser site is a planned data center expansion on the Digital Dallas campus in Richardson, Texas. The 6.7-acre lot holds a former engineering office building.
|
|
12.80 miles
|
Digital Realty: DFW25
|
Located in the epicenter of North Dallas' high-technology corridor on the 69-acre Digital Dallas campus, this facility offers over 100,000 square feet of space and connectivity to more than 60 network service providers.
|
|
12.80 miles
|
Rackspace Richardson DFW3
|
In 2012, US hosting company Rackspace signed a long-term lease for more than 58,000 sq ft of raised floor space at Digital Realty Trust's data center campus in Richardson, Texas (Dallas metro).
|
|
12.88 miles
|
Digital Realty: DFW16
|
This facility is a part of Digital Dallas Campus in Richardson.
|
|
12.89 miles
|
Equinix Dallas DA10
|
Former Terremark NAP of Dallas facility in Richardson that Equinix acquired from Verizon in 2017. Equinix closed DA10 in Q1 2021.
|
|
12.91 miles
|
Digital Realty: DFW18
|
This facility is a part of Digital Dallas Campus in Richardson
|
|
12.96 miles
|
Digital Realty: DFW17
|
This facility is a part of Digital Dallas Campus in Richardson
|
|
12.96 miles
|
Digital Realty: DFW35
|
This facility is a part of Digital Dallas Campus in Richardson.
|
|
12.99 miles
|
DataBank North Dallas DFW2
|
The facility is located in Northern Dallas in the Technology Business Corridor
|
|
13.02 miles
|
Digital Realty: DFW21
|
Digital Realty's DFW21 at 904 Quality Way is a powered base building on the Digital Dallas campus in Richardson, Texas. DataBank leases the building and runs it as its DFW2 data center.
|
|
13.02 miles
|
Digital Realty: DFW28
|
This facility is a part of Digital Dallas Campus in Richardson
|
|
13.05 miles
|
Centersquare: Fort Worth DFW1
|
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.
|
|
13.06 miles
|
Digital Realty: DFW20
|
|
|
13.09 miles
|
Digital Realty: DFW29
|
This facility is a part of Digital Dallas Campus in Richardson.
|
|
13.20 miles
|
AT&T Switching Station (Richardson)
|
A fire in October 2018 at this AT&T switching site caused a widespread outage of AT&T Internet and U-Verse TV services across North Texas.
|
|
13.72 miles
|
365 Richardson, TX
|
|
|
13.90 miles
|
Flexential Dallas (Synergy Park)
|
|
|
14.40 miles
|
Prime: DFW02-02
|
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
|
|
14.41 miles
|
Prime: DFW02-01
|
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
|
|
14.46 miles
|
DigiCo: Dallas DAL1
|
In January 2025, the newly established DigiCo Infrastructure REIT acquired State Farm’s Richardson data center from JDM III AZ LLC. The 129,170 sq ft facility, which was originally built by the insurance provider in 2015.
|
|
14.50 miles
|
Prime: DFW02-03
|
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
|
|
14.52 miles
|
Colovore: Mesquite DFW01
|
Colovore's first Dallas-market facility, a purpose-built liquid-cooled colocation building in Mesquite, TX. Four-hall design following Colovore's standard high-density spec-build template, with service dates running 2028 into 2029.
|
|
14.53 miles
|
CyrusOne: Dallas DFW6
|
CyrusOne invested $79.8 million to retrofit an existing building in Richardson, Texas, transforming it into their new DFW6 data center.
|
|
14.67 miles
|
CyrusOne Carrollton
|
CyrusOne's DFW1 in Carrollton is one of the largest data centers in Texas, a building CyrusOne bought in 2012 and converted to data center use in phases.
|
|
14.69 miles
|
Lincoln: Plano DFW5
|
Lincoln Property Company is developing a two-story build-to-suit data center at 660 Data Drive in Plano, Texas, on a 10-acre parcel it acquired in May 2026, with delivery targeted for the fourth quarter of 2029.
|
|
14.74 miles
|
DataCanopy: Carrollton, TX
|
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
|
|
14.74 miles
|
QTS: Greene Road DC1
|
DC1 is the first building pad on QTS's Greene Road tract in Lancaster, one of five two-story data centers of about 240,600 sq ft each on the Project Labrador zoning plan.
|
|
15.00 miles
|
NTT 2300 W Plano
|
In January 2019, GI Partners bought the more than 1 million-square-foot office and tech complex at 2300 W. Plano Parkway near Bush Turnpike.
|
|
15.10 miles
|
Mapletree: 1221 Coit
|
|
|
15.10 miles
|
Evocative: Dallas DAL6
|
Evocative acquired the DAL6 data center in Dallas, Texas in 2022. Spanning an impressive 111,000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
|
|
15.11 miles
|
CoreWeave Plano
|
CoreWeave launched a new $1.6 billion data center in Plano, Texas, which became operational at the end of 2023.
|
|
15.12 miles
|
Lincoln Rackhouse: 1000 Coit
|
|
|
15.21 miles
|
QTS: Greene Road Expansion
|
Buildings B to E on QTS's Greene Road tract in Lancaster, Texas, from the five-building Project Labrador zoning plan.
|
|
15.23 miles
|
Yondr: Lancaster Expansion
|
|
|
15.29 miles
|
VAZATA Dallas (DAL I & III)
|
The VAZATA site was previously known as: Horizon Dallas (DAL I)
|
|
15.29 miles
|
Digital Realty: DFW11
|
The Digital Realty 100,000sqft data center was built in 2000, renovated in 2008. The site is located near the George Bush Turnpike and North Dallas Tollway and provides an ideal data center location. VAZATA is the largest tenant.
|
|
15.39 miles
|
QTS: DFW3-DC1
|
DC1 is the first of two data centers QTS plans on its 98.6-acre DFW3 tract on East Belt Line Road in Lancaster, Texas: a building of about 502,750 sq ft on the west side of the site. Construction has not started.
|
|
15.42 miles
|
QTS: DFW3-DC2
|
DC2 is the second of two data centers QTS plans on its DFW3 tract on East Belt Line Road in Lancaster, Texas: a building of about 502,750 sq ft east of DC1, beside the site's planned substation. Construction has not started.
|
|
15.45 miles
|
Yondr: Lancaster 1
|
First planned building at Yondr's Lancaster campus, on the 29-acre west tract at 801 E. Belt Line Road. Yondr's concept plan shows a two-hall building of about 300,000 sq ft. Construction has not started.
|
|
15.47 miles
|
NTT: TX4
|
TX4 is the fourth building on NTT Global Data Centers' Garland campus, a liquid-cooling-ready data center that NTT scheduled to open in mid-2026.
|
|
15.48 miles
|
Digital Realty: DFW39
|
DFW39 is a single-story, 181,200 sq ft data center at 805 Holford Road on Digital Realty's Digital Garland campus in Garland, Texas, built to suit for a financial-services tenant.
|
|
15.51 miles
|
NTT: TX3
|
TX3 is the third building on NTT Global Data Centers' Garland campus, a two-story data center completed in 2024.
|
|
15.55 miles
|
NTT TX2
|
TX2 is the second building on NTT Global Data Centers' Garland campus, a two-story data center completed in 2024.
|
|
15.57 miles
|
Digital Realty: DFW45
|
DFW45 is a planned 672,000 sq ft data center at 1602 Ferris Road on Digital Realty's Digital Garland campus in Garland, Texas, with ten data hall suites.
|
|
15.59 miles
|
Digital Realty: DFW37
|
DFW37 is a two-story, 410,000 sq ft data center at 1502 Ferris Road on Digital Realty's Digital Garland campus in Garland, Texas, with six data hall suites and tenant office space.
|
|
15.59 miles
|
Stream: DFW V
|
In 2015, Texas-based Stream Data Centers sold a 73,320 sqft data center to a local financial services company and was then immediately hired to run it.
|
|
15.62 miles
|
NTT: TX1
|
TX1 is the first building on NTT Global Data Centers' Garland campus, opened by RagingWire in 2017.
|
|
15.68 miles
|
Digital Realty: DFW40
|
DFW40 is a data center under construction at 1512 Ferris Road on Digital Realty's Digital Garland campus in Garland, Texas. It holds six DR800 data hall suites plus office, loading and storage space.
|
|
15.80 miles
|
Stream: DFWA1
|
In January 2020, Stream commissioned phase I of a greenfield hyperscale data center development on a 23-acre site in Garland, next to northeast Dallas, Texas.
|
|
15.83 miles
|
EdgeCore Dallas
|
|
|
15.87 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.87 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.90 miles
|
NTT: Lancaster TX10 Expansion
|
Six later buildings (TX12 to TX17) on NTT's Lancaster campus at Sunrise Road and Belt Line Road, from the seven-building test fit for the 108.7-acre tract.
|
|
15.95 miles
|
Stack: DFW02D
|
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
|
15.95 miles
|
Stack: DFW02A
|
Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments.
|
|
15.96 miles
|
Cisco Richardson TXDC1
|
|
|
15.98 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.00 miles
|
Fortinet Plano
|
Fortinet-owned enterprise data center in Plano, bought from Ascent in April 2023. Tornado-hardened to F5, 2.7 MW critical load. Not offered as colocation.
|
|
16.04 miles
|
Stack: DFW02E
|
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
|
16.08 miles
|
Stack: DFW02B
|
Second named data center planned at STACK’s expanding DFW02 campus in Lancaster, with state filings targeting construction from 2027 through late 2028.
|
|
16.10 miles
|
NTT: TX11
|
TX11 is the first planned building on NTT's Lancaster campus at Sunrise Road and Belt Line Road, a data center of about 225,000 sq ft on the 108.7-acre tract NTT bought in December 2025.
|
|
16.11 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.13 miles
|
Stack: DFW02F
|
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
|
16.16 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.19 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.20 miles
|
Stack: DFW02C
|
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
|
16.34 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.34 miles
|
Skybox: PowerCampus Dallas
|
The Skybox PowerCampus is Located at Oncor’s deregulated power territory, Lancaster, TX. PowerCampus™ Dallas will strategically address emerging high-density compute needs in the Dallas area providing up to 300 MWs of power
|
|
16.46 miles
|
QTS: DFW2-DC1
|
DC1 is the first building on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, a two-story, 413,726 sq ft data center with office and shell data hall space.
|
|
16.51 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.51 miles
|
Stream DFW IV
|
In 2010, Stream Data Centers purchased a 20,000 SF warehouse in Richardson and began development of a 10,000 SF data hall.
|
|
16.51 miles
|
Mapletree: 3300 Essex
|
In 2010, Stream Data Centers purchased a 20,000 SF warehouse in Richardson and began development of a 10,000 SF data hall.
|
|
16.55 miles
|
QTS: DFW2-DC2
|
DC2 is a two-story, 470,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
|
|
16.59 miles
|
Global IP Networks - Plano
|
|
|
16.59 miles
|
Evocative: DAL1
|
|
|
16.59 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.62 miles
|
QTS: DFW2-DC3
|
DC3 is a two-story, 560,000 sq ft data center on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County, with data center space on both floors and a small administration area.
|
|
16.63 miles
|
Aligned: DFW-02
|
Aligned DFW-02 is the second building of Aligned's Plano Data center campus. DFW-02 is part of a 19-acre campus offering 36 megawatts of critical capacity across 220,000 sq. ft.
|
|
16.64 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.71 miles
|
QTS: DFW2-DC4
|
QTS is developing a 413,726-square-foot, two-story data center with office and shell data hall space on its South Dallas DFW2 campus near Wilmer, in southern Dallas County.
|
|
16.80 miles
|
QTS: Dallas III
|
Dallas III is a planned QTS data center of about 336,500 sq ft on 53.8 acres east of Mason Road at Belt Line Road in Wilmer, Texas, on the DFW2 plat. QTS has not filed it with the state.
|
|
16.87 miles
|
QTS: DFW2 Expansion
|
DFW2 Expansion holds the fourth planned building on QTS's 113.5-acre Dallas II tract between Sunrise Road and Mason Road in Wilmer and Lancaster, Texas. QTS has not filed it with the state.
|
|
16.89 miles
|
Flexential Dallas (Plano)
|
Flexential's Plano site in Dallas is former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017.
|
|
16.92 miles
|
QTS: DFW2-DC7
|
QTS is expanding its South Dallas campus with DC7, a new two-story data center building planned near Wilmer in southern Dallas County.
|
|
16.94 miles
|
QTS: DFW2-DC5
|
DC5 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
|
|
16.97 miles
|
QTS: DFW2-DC6
|
DC6 is a two-story, 363,500 sq ft data center with office and shell data hall space on QTS's South Dallas DFW2 campus near Wilmer in southern Dallas County.
|
|
17.18 miles
|
CyrusOne: Lewisville DFW2
|
Two independent power grids
Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
|
|
17.18 miles
|
Lightedge: Dallas (Lewisville)
|
LightEdge leases a suite in CyrusOne's Lewisville DFW2 data center north of Dallas.
|
|
17.22 miles
|
Digital Realty: DFW26
|
In 2012, Digital Realty Trust acquired the Convergence Business Park, an 831,400 square-foot data center and office campus in the Dallas suburb of Lewisville, Texas.
|
|
17.57 miles
|
Digital Realty: Project Gold Lewisville
|
Digital Realty's Project Gold is located on Edmonds Lane in Lewisville. The project consists of a single-story shell data center with space for three data halls on a 182,969 sq ft (17,000 sqm) site.
|
|
17.66 miles
|
QTS: Dallas VI
|
Dallas VI is QTS's tract of about 75 acres at 401 Lavender Road in Wilmer, Texas, planned for three data center buildings of 285,000 to 378,100 sq ft. QTS has not filed any of them with the state.
|
|
17.67 miles
|
QTS: Dallas IV
|
Dallas IV is QTS's 131-acre tract at 501 Lavender Road in Wilmer, Texas, planned for five data center buildings of about 378,100 sq ft each. QTS has not filed any of them with the state.
|
|
17.70 miles
|
Compass: Red Oak V
|
Compass Roadrunner Bldg 5 is located at its Red Oak campus. Building 5 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
|
|
17.76 miles
|
Compass: Red Oak VIII
|
|
|
17.76 miles
|
Compass: Red Oak X
|
|
|
17.79 miles
|
Compass: Red Oak IX
|
|
|
17.80 miles
|
Compass: Red Oak IV
|
Compass Roadrunner Bldg 4 is located at its Red Oak campus. Building 4 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
|
|
17.85 miles
|
Compass: Red Oak VII
|
|
|
17.88 miles
|
Compass: Red Oak III
|
Compass Roadrunner Bldg 3 is located at its Red Oak campus. Building 3 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
|
|
17.94 miles
|
Compass: Red Oak VI
|
This Facility is part of Compass' Red Oak data center campus in Texas.
|
|
17.97 miles
|
Compass: Red Oak II
|
Compass Roadrunner Bldg 2 is located at its Red Oak campus. Building 2 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
|
|
18.06 miles
|
Compass: Red Oak I
|
Compass Roadrunner Building 1, also known as DFW III-II Building 1, is located at its Red Oak campus. The facility at 300 Houston School Road spans a 251,815 sq ft (23,395 sqm) data center space.
|
|
18.13 miles
|
Plaza ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.20 miles
|
Stack: DFW01A
|
Former Stream Data Centers powered shell at 6653 Pinecrest Drive in Plano's Legacy Business Park, converted by T5 Data Centers from 2011 and enlarged in 2013 into four independent data centers, one of them Equinix DA7.
|
|
18.22 miles
|
Equinix Dallas DA7
|
Equinix invested more than $20 million for the DA7 IBX data center, which currently includes 1,200 cabinets
|
|
18.33 miles
|
Stack: DFW01B
|
Greenfield data center at 6715 Pinecrest Drive in Plano, built by T5 Data Centers as T5@Dallas III next to DFW01A, with five data halls and LEED Silver certification.
|
|
18.36 miles
|
Stack: DFW01C
|
Planned STACK build-to-suit data center on the 16-acre former Spring Creek Golf Center lot at 5601 W Spring Creek Parkway in Plano, next to DFW01A and DFW01B.
|
|
18.38 miles
|
Lincoln: Red Oak DFW2
|
Planned data center building DFW2 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. It is the campus's lead building, with an initial phase targeted for the first quarter of 2028.
|
|
18.40 miles
|
QTS: Dallas V
|
Dallas V is QTS's tract of about 101 acres at 420 Lavender Road and South Millers Ferry Road in Wilmer, Texas, held for future data centers. QTS has published no building plan for it.
|
|
18.51 miles
|
Resilience DFW
|
The Skybox campus can be expanded to 350,000 square foot capacity to host servers and provide 60 megawatts of power in later phases.
|
|
18.59 miles
|
DataBank: DFW16
|
DFW16 is the last of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
18.64 miles
|
Lincoln: Red Oak DFW3
|
Planned data center building DFW3 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. Timing follows the lead building and utility power confirmation.
|
|
18.68 miles
|
DataBank: DFW15
|
DFW15 is the seventh of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
18.73 miles
|
DataBank: DFW12
|
DFW12 is the fourth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
18.75 miles
|
DataBank: DFW14
|
DFW14 is the sixth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
18.77 miles
|
Rackspace Grapevine DFW1
|
|
|
18.82 miles
|
DataBank: DFW13
|
DFW13 is the fifth of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
18.86 miles
|
DataBank: DFW11
|
DFW11 is the third of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
18.91 miles
|
Lincoln: Red Oak DFW4
|
Planned data center building DFW4 on Lincoln Property Company's 131-acre Red Oak, Texas campus south of Dallas. Timing follows the lead building and utility power confirmation.
|
|
18.91 miles
|
DataBank: DFW10
|
DFW10 is the second of eight planned buildings on DataBank's Red Oak campus in Ellis County, south of Dallas.
|
|
19.03 miles
|
DataBank: DFW9
|
DFW9 is the first of eight planned buildings on DataBank's 292-acre Red Oak campus in Ellis County, south of Dallas.
|
|
19.70 miles
|
DataBank: DFW8
|
Databank expanded its Plano data center campus (DFW3) with a $280 million, 265,000sqft three-story building.
|
|
19.79 miles
|
DataBank: DFW3
|
DataBank's DFW3 is the first building on its Plano campus near Legacy Park, an Uptime-certified Tier III data center that opened in 2018.
|