Data Center Campus

CyrusOne Chicago Aurora CME Campus

Operational
Fully operational facility
Operated by:

Campus at a Glance

3 data centers on this campus
First built in 2009
Total building size: 1,281,000 SqFt
Coordinates: 41.79678, -88.24306
░░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME. CME will have 72,000 square feet of data center space.

In Dec 2016 CyrusOne began constructing a 2nd datacenter on a 16 acre adjacent lot. The original CME Globex data center was 428,000sqft and commenced in 2009

Power:

  • Expandable power up to 184MW (92MW @ 2N) with wholly-owned substation
    • Siemens Switchgear from 13.8kv Substation #5
    • 2 – 4000 amp breakers (A & B) feeds UPS 4A & 4B
    • Annual Infrared / thermographic inspection of electrical equipment to detect hot-spots
    • 30 ton Stulz CRAC’s for cooling
    • Separate power generation plants deliver two-138,000 volt transmission quality utility services
    • 4-A side transformers, 4-B side transformers
    • Emergency generators provide 54-hour run time without refueling

Cooling:

  • (8) Eight 540 ton chillers (4 compressors each), 8 primary pumps, 5 secondary pumps
  • Free cooling below 30F. Variable Frequency Drives (VFD’s) throughout
  • Color-coded to align with Power Rooms
  • Cooling towers use evaporative condensing chillers utilize highly efficient oil-free centrifugal compressors
  • CRAH units with energy efficient fans
CyrusOne's Chicago - Aurora I Data Center  from the Air CyrusOne's Chicago - Aurora I Data Center (Photo: Business Wire)

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
CyrusOne: Aurora CME (CHI1) CyrusOne
Operational
░░░ Request Dataset MW 428,000 SqFt 2009
CyrusOne: CHI2 DC1 CyrusOne
Operational
░░░░ Request Dataset MW 428,000 SqFt 2018
CyrusOne: CHI2 DC2 CyrusOne
Operational
░░░░ Request Dataset MW 425,000 SqFt 2023

Map and Nearby Locations

CyrusOne Chicago Aurora CME Campus Power Growth Over Time

+84% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

CyrusOne is a data center owner, operator, and developer that manages more than 50 facilities, with its footprint concentrated in the U.S. and Europe. The company is based in Dallas and was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt.

Its portfolio centers on hyperscale and enterprise colocation across multi-building campuses. CyrusOne has also pursued international growth initiatives alongside its core North American and European markets.

CyrusOne History:

  • March 2022: Taken private by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt.
  • July 2015: Acquired Cervalis, adding four data centers and two disaster recovery sites in the New York metro.
  • July 2014: Acquired Cervalis
  • January 2013: Completed initial public offering on NASDAQ as a carve-out of Cincinnati Bell’s data center business.
  • June 2010: Cincinnati Bell acquired CyrusOne for approximately 525 million dollars.
  • 2000: Founded by David Ferdman.