QTS: Calatorao 7

Latest Podcast Sector SUI-4 Campus Data Center, A-2 km 281-284.5
Planned
Future facility in planning stage
Operated by:

QTS: Calatorao 7

Year Planned: 2035
Utility Provider: Red Eléctrica
Floors: 2

Calatorao 7 (DC7) is the seventh of eight identical phase-1 buildings on QTS's Proyecto Rhodes campus in sector SUI-4, on the south-east side of the A-2 motorway at Calatorao, Zaragoza province, Aragon, Spain. Calanza Inmuebles S.L., a Blackstone-controlled company, is the promoter and landowner, and QTS will operate the campus. The building project still needs its integrated environmental authorisation.

Site History

  • Sep 2026: The Gobierno de Aragón gave the general-interest plan partial definitive approval for urbanisation, the substation and external connections.
  • Aug 2025: The general-interest plan received initial approval.
  • Oct 2024: The Gobierno de Aragón declared Proyecto Rhodes an investment of regional interest.

Map and Nearby Locations

Sector SUI-4 Campus Data Center, A-2 km 281-284.5
QTS Data Centers Sites
Nearby Facilities

QTS: Calatorao 7 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of QTS: Calatorao 7

Distance Site About
0.10 miles QTS: Calatorao 8
Calatorao 8 (DC8) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
0.10 miles QTS: Calatorao 6
Calatorao 6 (DC6) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
0.20 miles QTS: Calatorao 5
Calatorao 5 (DC5) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
0.32 miles QTS: Calatorao 4
Calatorao 4 (DC4) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
0.42 miles QTS: Calatorao 3
Calatorao 3 (DC3) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
0.52 miles QTS: Calatorao 2
Calatorao 2 (DC2) is one of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province.
0.62 miles QTS: Calatorao 1
Calatorao 1 (DC1) is the first of eight buildings on QTS's Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province, where site works began in October 2026.
1.15 miles QTS: Calatorao Expansion
Calatorao Expansion carries the planned second phase of QTS's Proyecto Rhodes campus at Calatorao, Zaragoza province, Spain.
1.51 miles Box2bit: Epilon
Cancelled data center campus that Box2bit planned at Venta Romera in Épila, Zaragoza, in 2026.
6.43 miles Forestalia: Alfamén Expansion
Former later phases of Forestalia's DCM Blue data centre at Alfamén, Zaragoza province, whose grid rights Merlin Properties bought in 2026.
6.52 miles Forestalia: DCM Blue (Alfamén)
Forestalia's former planned DCM Blue data centre at Alfamén, Zaragoza province. Its grid rights went to Merlin Properties for the Zaragoza-WIND campus in Botorrita.
10.19 miles Global StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.22 miles Forestalia: Botorrita Expansion
Former later phases of Forestalia's DCM Dédalo data centre at Botorrita, Zaragoza province, whose grid rights Merlin Properties bought in 2026.
11.23 miles Forestalia: DCM Dédalo (Botorrita)
Forestalia's former planned DCM Dédalo data centre at Botorrita, Zaragoza province. Forestalia sold its grid rights to Merlin Properties, which uses them for its Zaragoza-WIND campus in Botorrita.
11.78 miles Box2bit: Proyecto Ebro
Cancelled five-building data center campus on the Entreviñas industrial estate in Cariñena, Zaragoza, that Box2bit dropped in 2026.
11.84 miles Merlin: Zaragoza-WIND
Merlin Properties plans a large data center in the San Antonio industrial estate in Botorrita, southwest of Zaragoza, declared of general interest by Aragón in 2026.
18.71 miles South HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.13 miles Samca: Ribera Alta del Ebro
Ribera Alta del Ebro is the first of three data centres in Grupo Samca's planned Green IT Aragón colocation campus at Luceni, Zaragoza province.
19.34 miles Samca: Ribera Alta del Ebro II
Ribera Alta del Ebro II is the second of three data centres in Grupo Samca's planned Green IT Aragón colocation campus at Luceni, Zaragoza province.
19.38 miles Samca: Atalaya del Ebro
Atalaya del Ebro is the third of three data centres in Grupo Samca's planned Green IT Aragón colocation campus at Luceni, Zaragoza province.

Operating Company

Operated by:

QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.

QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.

History:

  • On August 31, 2021 funds managed by Blackstone completed the acquisition of QTS Realty Trust.
  • April 30, 2019: Acquired two operating data centers in Groningen and Eemshaven, Netherlands, for approximately $44 million.
  • June 2015: QTS acquires Carpathis Hosting for $326 million. The transaction increases QTS's ability to serve IaaS and Government clients. Additionally the transaction provides a number of deployments within Equinix facilities.
  • July 8, 2014: Acquired the former Chicago Sun-Times printing plant for conversion to a data center.
  • June 30, 2014: Acquired the Princeton, New Jersey data center from McGraw Hill Financial.
  • 2013: Went public (IPO) and started trading under the symbol QTS on the NYSE.
  • 2010 Acquired their Richmond facility
  • 2005 QTS acquired Atlanta Suwanee data center
  • 2003: Company acquired its first data center in Overland Park, KS
  • 2003: QTS was founded by Chad Williams with its first data center in Overland Park in Kansas
0
Facilities
0
Markets

News See all

Read Colorado Regulators Allege QTS Built Aurora Data Centers Without Air Permits
Colorado's Air Pollution Control Division (APCD) alleges [QTS Data Centers](https://baxtel.com/data-centers/qts-data-centers) built new data centers at its Aurora campus without the required state ...

Colorado Regulators Allege QTS Built Aurora Data Centers Without Air Permits

November 11, 2026 QTS Data Centers

Colorado's Air Pollution Control Division (APCD) alleges QTS Data Centers built new data centers at its Aurora campus without the required state air permits. The October notice of violation, reported by CPR News on Nov. 10, covers the two buildings QTS is adding at 1160 North Gun Club Road in...

Read more
Read Invitium Energy Agrees 2GW Generation Deal To Power QTS Salem Township Campus
PPL's Invitium Energy venture [has agreed to supply](https://www.prnewswire.com/news-releases/ppl-corporation-delivers-strong-third-quarter-2026-earnings-raises-longterm-eps-growth-outlook-30293202...

Invitium Energy Agrees 2GW Generation Deal To Power QTS Salem Township Campus

November 10, 2026 QTS Data Centers

PPL's Invitium Energy venture has agreed to supply about 2GW of generation to QTS Data Centers' Salem Township, Pennsylvania, project. The 20-year initial term allows multiple five-year renewals, and the term sheet is nonbinding and subject to conditions precedent. The term sheet advances...

Read more
Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Krolmap Plans 225MW Off-Grid Data Center Campus in Belchite, Zaragoza
Krolmap Engineering & Solutions plans a 225MW data center campus in Belchite, Zaragoza, that would run largely on self-generated power. The Aragonese engineering firm puts the investment at €1.5 bi...

Krolmap Plans 225MW Off-Grid Data Center Campus in Belchite, Zaragoza

October 23, 2026 Krolmap Engineering & Solutions

Krolmap Engineering & Solutions plans a 225MW data center campus in Belchite, Zaragoza, that would run largely on self-generated power. The Aragonese engineering firm puts the investment at €1.5 billion ($1.68bn) for 25 hectares in the La Legua industrial park, Heraldo de Aragón reported on...

Read more
Read QTS Drops Plan for Data Center near Madison, Wisconsin
QTS Drops Plan for Data Center near Madison, Wisconsin

QTS Drops Plan for Data Center near Madison, Wisconsin

January 30, 2026 QTS Data Centers

QTS has backed off plans to develop a data center near Madison, Wisconsin, after pushback from local officials. The company has dropped plans for a campus in the Village of DeForest after the village announced its intention to deny an annexation request related to the project.“After individual...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse