QTS: Atlanta-1 DC3

Latest Podcast 1010 West Marietta St NW
Operational
Fully operational facility
Operated by:

QTS: Atlanta-1 DC3

Short Code: DC3
Year Built: 2025
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW. It consists of 1.15 million SF of data center, 640,000 SF of office, 35,000 SF of retail, 35,000 SF of restaurant, 50 townhomes, and 350 multifamily apartment units. Project Granite is just north of the company's existing 95-acre campus at 1033 Jefferson St.

Map and Nearby Locations

1010 West Marietta St NW
QTS Data Centers Sites
Nearby Facilities

QTS: Atlanta-1 DC3 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of QTS: Atlanta-1 DC3

Distance Site About
0.11 miles QTS: Atlanta-1 DC4
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
0.32 miles QTS: Atlanta-1 DC2
0.33 miles QTS: Atlanta 1 Campus
A massive 970,000 sqft data center is one of the largest in the world.
0.41 miles Internap Atlanta ACS003
Internap's facility at 1033 Jefferson is located within QTS's massive Atlanta Metro data center.
1.93 miles DataBank Atlanta ATL1
The DataBank site is part of the CODA development, a 645,000 sqft mixed-use office complex, currently under construction in Georgia Tech’s Technology Square.
2.20 miles Evocative ATL1
Built in 2000 and was subsequently expanded in 2012
2.20 miles Digital Realty: ATL14
Digital Realty's data center at 250 Williams Street located in the American Cancer Society Center in downtown Atlanta.
2.34 miles Southern Telecom Atlanta
2.39 miles Aptum Atlanta
The site was originally a Peer 1 site before the Cogeco acquisition. Cogeco Peer 1 changed name to Aptum Technologies in 2019.
2.40 miles H5 Atlanta
The H5 Atlanta colocation facility features direct access to the key Southeastern metro and long haul network providers and is the site of Level (3)'s Atlanta Gateway.
2.42 miles Lumen Atlanta 1
2.47 miles Lumen Atlanta 2
2.47 miles Equinix Atlanta AT1
Equinix's AT1 site is a 6-story reinforced steel and concrete with brick face building.
2.48 miles RadiusDC: 55 Marietta
It is easy to confuse the 2 at first glance, 55 Marietta (which is across the street) from its more famous neighbor, 56 Marietta
2.48 miles CoreSite: Atlanta AT1
2.48 miles QuadraNet Atlanta
In 2015, QuadraNet opened its fourth North American data center located in Atlanta, Georgia.
2.48 miles ATLDC 55 Marietta
2.48 miles American Tower: 55 Marietta
American Tower entered the building in 2019 after acquiring Colo Atl, a small Atlanta-based colocation provider. The company now occupies four floors of 55 Marietta Street, totaling 62,000 sq ft of space.
2.48 miles Digital Realty: 10 Forsyth St NW
Digital Realty is pursuing the development of its fourth data center in Atlanta, Georgia.
2.49 miles Cogent: Atlanta
Cogent's Atlanta data center offers 7,826 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
2.49 miles 180 Peachtree
In 2017, Mapletree Industrial Trust acquired 14 data centers located across the United States from Sila Realty Trust, formerly known as Carter Validus Mission Critical REIT. This data center is part of the acquisition.
2.49 miles FOGO Atlanta
Small site with in the 56 carrier hotel.
2.49 miles Equinix Atlanta AT2 AT3
Equinix AT2 and AT3 are located in the 56 Marietta carrier hotel.
2.49 miles HostPapa GA1
10,000sqft data center with in Atlanta's telecom hotel
2.49 miles 56 Marietta Carrier Hotel - Digital Realty
56 Marietta is a Carrier Hotel and one of the most popular buildings in the Atlanta data center market.
2.66 miles Edged Energy: Atlanta01-03
Edged is developing the ATL01-3 data center at 1740 Thomas Street NW in Atlanta, Georgia, as part of its larger Atlanta campus on the former Tilford Yard site.
2.71 miles AT&T Southern Bell Telephone Company Building
The Southern Bell Telephone Company Building, now known as the AT&T Communications Building, is the main telephone exchange for downtown Atlanta, Georgia. It was highlighted in 2018 by the Intercept as a key building for NSA surveillance programs.
2.90 miles Edged Energy: Atlanta01-02
This facility is part of Edged Energy's three-building campus on Marietta Road in Atlanta.
3.08 miles Edged Energy: Atlanta
Data center provider Edged Energy has broken ground on a new data center project in Atlanta, Georgia. Edged is constructing three buildings on the campus, located at 1986 Marietta Road.
3.33 miles DataBank Atlanta ATL3
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
3.36 miles DataBank Atlanta ATL2
3.50 miles EdgeConneX ATL02
In 2018, EdgeConneX launched its second data center in Atlanta.
3.66 miles EdgeConneX Atlanta Campus
The Atlanta EdgeConneX site has attracted MSOs (Charter, Comcast) and content companies (Netflix and Twitch) into their data center.
3.66 miles EdgeConneX ATL01
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
3.72 miles Lumen Atlanta 5
4.02 miles Lumen Atlanta 6
4.17 miles Cogent: Atlanta 2
Cogent's Atlanta 2 data center offers 36,172 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
5.74 miles Verizon: 4000 Highland
The site is a previous XO Communications facility
7.14 miles 365 Smyrna, GA
The facility was formerly operated by Sungard and known as ATL-5600
7.25 miles DataBank: Lithia Springs ATL6
This facility will be the second data center building at DataBank's Lithia Springs Campus.
7.35 miles DataBank: Lithia Springs ATL5
DataBank's Lithia Springs Campus spans 95 acres and will accommodate two multi-story data centers, offering up to 1 million gross square feet (92,900 sqm) of space.
7.67 miles DataBank: Atlanta ATL4
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
7.76 miles Coloblox: ATL2
Coloblox Data Centers ATL2, also known as SMY2, is a data center situated in Sandy Springs, with a gross square footage of 21,571 square feet. The facility offers roof colocation services.
7.86 miles Coloblox: ATL1
Coloblox Data Centers SMY1 is a data center located in Sandy Springs, occupying a gross square footage of 19,752 square feet.
8.05 miles Equinix Atlanta AT4
Equinix acquired AT4 from Verizon in May 2017
8.24 miles American Tower: SW Atlanta
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
8.66 miles Menlo Digital: Atlanta, GA
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
9.48 miles Digital Realty: ATL11
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
9.61 miles Centersquare: ATL1
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
9.61 miles 375 Riverside - Digital Realty
The facility was built in 1998, renovated in 2008, and offers 32 MW of power. It is occupied by three large tenants from the managed services (Cyxtera), telecommunications (AT&T) and healthcare services industries (Cigna Health Insurance.)
9.72 miles Hyperscale Data Center Request Dataset
Google announced in 2018 that it will acquire 78.8 MW of solar power to run the data center.
9.78 miles Switch Atlanta: The KEEP
9.79 miles Hyperscale Data Center Request Dataset
Google completed the expansion of its Douglas County data center in 2016.
9.94 miles Switch: Atlanta 3
10.24 miles Lumen College Park 1
10.44 miles STACK: ATL02B
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
10.49 miles DataCanopy: Lithia Springs (Atlanta)
10.49 miles PwC Lithia Springs
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
10.53 miles CoreSite: Atlanta AT2
Freestanding Building on Approximately 7 Acres that is outside the 500 year flood plain
10.54 miles STACK Atlanta ATL02
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
10.66 miles T5@Atlanta III Bldg 5
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
10.68 miles Vantage: Georgia GA2
The project, known as Westlake, will comprise a 754,220-square-foot (70,070 sqm) facility on undeveloped land west of Plummer Road and north of Riverside Drive in South Fulton, east of the existing Quaker facility.
10.69 miles T5@Atlanta III Campus
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
10.75 miles Hyperscale Data Center Request Dataset
Amazon has purchased 118 acres for a potential new data center in Douglas County to the west of Atlanta for $37M.
10.77 miles T5@Atlanta III Bldg 4
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
10.83 miles T5@Atlanta III Bldg 2
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
10.87 miles T5@Atlanta III Bldg 3
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
11.09 miles Rock House Road data center, Atlanta
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
11.10 miles Hyperscale Data Center Request Dataset
Microsoft is building a data center campus on a 125-acre site located on Ben Hill Road in East Point.
11.32 miles Internap Atlanta: 40 Perimeter Center
In 2017, Internap (NASDAQ:INAP), a global provider of dedicated servers, hybrid cloud, colocation, and managed services, signed a long-term lease for a "Tier 3-like" data center.
11.32 miles 40 Perimeter Center: Lincoln Rackhouse
The data center is 30 minutes from Hartsfield International Airport and 20 minutes from downtown Atlanta.
11.37 miles DC BLOX: ATL1-C
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
11.54 miles Flexential: Douglasville 2
This data center is a part of Flexential's Douglasville Campus in Atlanta-Douglasville, Georgia.
11.65 miles DC BLOX: ATL1-B
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
11.67 miles DC BLOX: Atlanta West (ATL1)
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
11.69 miles PCC-DeKalb: Ellenwood, GA
A proposal to rezone 95 acres in DeKalb County, Georgia, for a 1 million sq ft data center and electric substation has been deferred.
11.75 miles Flexential Douglasville
Flexential's Douglasville data center campus is located at 1700 N. River Rd, Douglasville. The first building of the campus spans an area of 204,514 square feet.
11.79 miles CoreWeave: Douglasville, GA
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
11.90 miles Crypto Mining Data Center Request Dataset
CleanSpark’s first ever Bitcoin mining facility is in College Park, Georgia. It sits on six acres near the Hartsfield-Jackson Atlanta International Airport
12.03 miles TA Realty: Ellenwood, ATL
TA Realty received site plan approval for a data center project in Ellenwood, southeast of Atlanta. The 35-acre development will be located between Dunn and Williamson roads on Tanners Church Road.
12.04 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
12.07 miles Aligned: ATL-01
Aligned's ATL-01 is the company's Atlanta-market data center at 1551 N River Road in Lithia Springs (Douglas County), Georgia. The ~280,000 sq ft facility on ~44 acres is a conversion of the former Sweetwater Creek Logistics Center, in the metro's fast-growing western data center corridor.
12.07 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
12.17 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
12.21 miles Hyperscale Data Center Request Dataset
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
12.38 miles Digital Realty: ATL 15
Digital Realty plans to develop a two-building data center campus in Forest Park, Clayton County, Georgia, just nine miles south of Atlanta.
12.44 miles Vantage: Douglasville
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
12.64 miles Vantage: Douglasville 2
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
12.82 miles Vantage: Douglasville 3
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
13.32 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
13.41 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
13.51 miles Hyperscale Data Center Request Dataset
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
13.59 miles EdgeConneX: Atlanta ATL11-13
The data center campus will be developed by EdgeConnex on 136 acres of land that Microsoft purchased in Fulton County in April 2024 for $53.5 million.
13.68 miles Lumen Doraville 1
13.79 miles Vantage: Georgia GA1
Vantage Data Centers is planning a data center campus outside Atlanta, Georgia.
15.49 miles Equinix Atlanta AT5
Another site Equinix acquired from Verizon.
16.06 miles TA Realty: Red Oak ATL03
TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County.
16.52 miles Grindcap: Marietta 2
DC-2 will be the second building of Grindcap's Marietta Campus in Georgia.
16.56 miles Grindcap: Marietta Campus
Grindcap plans to construct a 347,200 sq ft (32,255 sqm) campus featuring two two-story data center buildings (DC-1 at 213,600 sq ft and DC-2 at 133,600 sq ft) and a substation
16.81 miles Crypto Mining Data Center Request Dataset
An 87,000-square-foot data center in Norcross was purchased and transformed into CleanSpark’s second Bitcoin mining facility
17.43 miles Flexential Atlanta-Norcross
The Norcross data center features a cloud node on-site.
17.44 miles Flexential Atlanta-Norcross 2
Flexential plans to expand its Atlanta presence through development of Atlanta – Norcross 2 at 2755 Northwoods Parkway in Norcross, Georgia. The project extends the company’s existing Norcross footprint and is designed to support enterprise and AI workloads with a targeted launch in the first half of 2028.
19.79 miles Fairburn Technology Center
Bohannon Road Venture LLC is planning to develop 1.19 million sq ft (110,500 sqm) of data center space, spanning three buildings on a 59-acre site.

QTS: Atlanta-1 DC3 Data Center Photos See all

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:

QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.

QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.

History:

  • On August 31, 2021 funds managed by Blackstone completed the acquisition of QTS Realty Trust.
  • April 30, 2019: Acquired two operating data centers in Groningen and Eemshaven, Netherlands, for approximately $44 million.
  • June 2015: QTS acquires Carpathis Hosting for $326 million. The transaction increases QTS's ability to serve IaaS and Government clients. Additionally the transaction provides a number of deployments within Equinix facilities.
  • July 8, 2014: Acquired the former Chicago Sun-Times printing plant for conversion to a data center.
  • June 30, 2014: Acquired the Princeton, New Jersey data center from McGraw Hill Financial.
  • 2013: Went public (IPO) and started trading under the symbol QTS on the NYSE.
  • 2010 Acquired their Richmond facility
  • 2005 QTS acquired Atlanta Suwanee data center
  • 2003: Company acquired its first data center in Overland Park, KS
  • 2003: QTS was founded by Chad Williams with its first data center in Overland Park in Kansas
167
Facilities
33
Markets

News See all

Read QTS Drops Plan for Data Center near Madison, Wisconsin
QTS Drops Plan for Data Center near Madison, Wisconsin

QTS Drops Plan for Data Center near Madison, Wisconsin

January 30, 2026 QTS Data Centers

QTS has backed off plans to develop a data center near Madison, Wisconsin, after pushback from local officials. The company has dropped plans for a campus in the Village of DeForest after the village announced its intention to deny an annexation request related to the project.“After individual...

Read more
Read QTS Starts Preparation for $13bn UK data center
QTS Starts Preparation for $13bn UK data center

QTS Starts Preparation for $13bn UK data center

October 10, 2025 QTS Data Centers

QTS has begun site work on a massive data center project in Northumberland, UK which could see an investment of up to £10 billion ($13.2bn) across 10 facilities if fully built out. This March, the project received outline planning permission from the local council. After initially being pitched...

Read more
Read Equifax to Decommission Data Center outside Atlanta
Equifax to Decommission Data Center outside Atlanta

Equifax to Decommission Data Center outside Atlanta

September 12, 2025 Atlanta

The City of Alpharetta last week announced that Equifax was investing $25 million to expand its Alpharetta campus, located in Fulton County. The expansion includes the renovation of the third floor of the JV White 1 building, converting it from a data center into collaborative office space. “The...

Read more
Read QTS Plans Data Center in Forssa, Finland
QTS Plans Data Center in Forssa, Finland

QTS Plans Data Center in Forssa, Finland

August 20, 2025 QTS Data Centers

Data center firm QTS is expanding its European footprint with plans for a campus in Finland. The City of Forssa signed a preliminary agreement earlier this year with QTS for more than 100 hectares of land in Ratasmäki. "The interest of a large investor like Blackstone in Forssa is very good news....

Read more
Read QTS Breaks Ground on Data Center in Iowa
QTS Breaks Ground on Data Center in Iowa

QTS Breaks Ground on Data Center in Iowa

August 13, 2025 QTS Data Centers

QTS has officially announced plans for a new data center campus in Cedar Rapids, Iowa. The campus could support up to seven data center buildings at full build-out and see up to $10 billion invested.Tag Greason and David Robey, co-CEOs of QTS, said: “From day one, we believe in being a good...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?