QTS: Manassas 1 DC3

Latest Podcast 9340 Godwin Drive
Operational
Fully operational facility
Operated by:

QTS: Manassas 1 DC3

Year Built: 2024
Floors: 2
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

This facility is part of QTS Data Center Campus in Manassas.

Map and Nearby Locations

9340 Godwin Drive
QTS Data Centers Sites
Nearby Facilities

QTS: Manassas 1 DC3 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of QTS: Manassas 1 DC3

Distance Site About
0.10 miles QTS: Manassas 1 DC2
This facility is part of QTS Data Center Campus in Manassas.
0.14 miles QTS: Manassas 1 DC1
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
0.23 miles QTS Manassas 1 DC6
This facility is part of QTS Manassas 1 Campus in Virginia.
0.29 miles QTS: Manassas 1 DC4
0.37 miles QTS Manassas 1 DC5
This facility is part of QTS Data Center Campus in Manassas.
0.50 miles Stack: NVA05A
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
0.54 miles North ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.54 miles Stack: NVA05C
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
0.54 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.57 miles Prime TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.61 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.63 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
0.67 miles GammaInterested in this information?Contact us
0.69 miles Plaza BetaInterested in this information?Contact us
0.69 miles Black Chamber: Nokesville
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
0.71 miles TPC: Manassas, VA
0.76 miles JK Land: Comcast Center
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
0.86 miles Edge PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.89 miles Stack: NVA05D
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
0.95 miles Digital Realty: IAD53
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
0.95 miles Prime ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.97 miles Campus AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.05 miles Digital Realty: IAD50
1.13 miles Digital Realty: IAD51
1.16 miles Hub PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.17 miles Global RidgeInterested in this information?Contact us
1.20 miles Center TwoInterested in this information?Contact us
1.20 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
1.20 miles Evoswitch USA WDC 1
1.20 miles VAZATA Northern Virginia (NoVa One)
1.20 miles Hub ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.23 miles East CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.24 miles East StationInterested in this information?Contact us
1.28 miles West PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.28 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.32 miles CloudHQ: MDC3
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
1.33 miles Campus AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.33 miles Stack: NVA02C
NVA02C, or Building C, is a 14,387 sq ft building on STACK Infrastructure's NVA02 campus at 9730 Hornbaker Road in Manassas, Virginia.
1.34 miles Station TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.37 miles Stack: NVA02B
NVA02B is a 224,652 sq ft data center building on STACK Infrastructure's NVA02 campus at 9740 Hornbaker Road in Manassas, Virginia.
1.37 miles West CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.38 miles Yondr: Manassas
Yondr and Cerberus have acquired land in Manassas for a new hyperscale data center campus targeted for service in 2029.
1.41 miles Stack: NVA02A
NVA02A is a 226,862 sq ft data center building on STACK Infrastructure's NVA02 campus at 9750 Hornbaker Road in Manassas, Virginia.
1.41 miles Station ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.42 miles CloudHQ: MDC2
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
1.45 miles Stack: NVA02D
NVA02D is a 281,000 sq ft data center building on STACK Infrastructure's NVA02 campus at 9590 Hornbaker Road in Manassas, Virginia.
1.50 miles Stack: NVA02G
NVA02G is a 185,803 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 9530 Hornbaker Road in Manassas, Virginia.
1.54 miles CloudHQ: MDC1
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
1.61 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.62 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.64 miles Stack: NVA02E
NVA02E is a 259,200 sq ft data center building on STACK Infrastructure's NVA02 campus at 9570 Hornbaker Road in Manassas, Virginia.
1.64 miles Stack: NVA02F
NVA02F is a data center building under construction on STACK Infrastructure's NVA02 campus at 9640 Hornbaker Road in Manassas, Virginia.
1.65 miles Point TwoInterested in this information?Contact us
1.83 miles Iron Mountain: VA-6
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
1.84 miles Point OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.84 miles Stack: NVA02H
NVA02H is a 256,212 sq ft, two-story data center building under construction on STACK Infrastructure's NVA02 campus at 10167 Linton Hall Road in Prince William County, Virginia.
1.92 miles Stack: Bristow 2 (NVA02L)
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
1.93 miles Stack: NVA02J
NVA02J is a 201,000 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10155 Linton Hall Road in Prince William County, Virginia.
1.93 miles Central HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.94 miles Stack: NVA02I
NVA02I is a 256,280 sq ft data center building under construction on STACK Infrastructure's NVA02 campus at 10161 Linton Hall Road in Prince William County, Virginia.
1.94 miles Center AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.99 miles Center OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.08 miles Iron Mountain: VA-8
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
2.12 miles Iron Mountain: VA-5
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
2.15 miles Stack: Bristow 1 (NVA02K)
Bristow 1 (NVA02K) is the first of two three-story data centers STACK Infrastructure proposed on a 58-acre site in Bristow, Virginia. Prince William County supervisors rejected the project in September 2025.
2.17 miles CloudHQ: MCC7
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
2.18 miles CloudHQ MCC2
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
2.18 miles Iron Mountain: VA-7
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
2.25 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
2.32 miles ParkInterested in this information?Contact us
2.35 miles Opus Interactive Manassas
2.44 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
2.45 miles Station PrimeInterested in this information?Contact us
2.47 miles Park UltraInterested in this information?Contact us
2.51 miles CloudHQ: MCC4
CloudHQ has announced plans for MCC4, a new facility to be located at 10849 Airman Avenue in the Northern Virginia market. The data center will span 225,585 sqft of space.
2.52 miles Iron Mountain VA-2
2.53 miles UltraInterested in this information?Contact us
2.54 miles CloudHQ: MCC5
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
2.57 miles CloudHQ: MCC1
CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
2.59 miles Iron Mountain: Manassas Point
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
2.61 miles Iron Mountain VA-1
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
2.71 miles CloudHQ: MCC6Z
MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
2.77 miles CloudHQ: MCC6A
MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
2.78 miles CloudHQ MCC3
CloudHQ MCC3 is a part of The MCC data center campus.
3.00 miles Metro CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.01 miles CampusInterested in this information?Contact us
3.01 miles North ValleyInterested in this information?Contact us
3.04 miles PlusInterested in this information?Contact us
3.04 miles Campus MaxInterested in this information?Contact us
3.12 miles North CampusInterested in this information?Contact us
3.25 miles Tower OneInterested in this information?Contact us
3.25 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
3.29 miles Global RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.31 miles Plaza TwoInterested in this information?Contact us
3.36 miles BlackChamber: Gainesville, VA
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
3.38 miles Core HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.39 miles Hub ProInterested in this information?Contact us
3.39 miles East ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.42 miles Park BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.46 miles Equinix Manassas DC14
Equinix DC14 is a two-story colocation data center at 7400 Infantry Ridge Road in Manassas, Virginia, built in 2004 and acquired from Verizon, where it was IAD4, in 2017.
3.57 miles Verizon: 7777 Infantry Ridge
Former AOL data center
3.59 miles Metro CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.59 miles Point PrimeInterested in this information?Contact us
3.63 miles PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.65 miles Central StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.18 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.19 miles Yondr: Bristow Bldg1
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
4.20 miles Park ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.25 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.27 miles Valley PlusInterested in this information?Contact us
4.30 miles Yondr: Bristow Bldg2
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
4.44 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.54 miles JK Land: Hunter Trust
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
4.55 miles South PlazaInterested in this information?Contact us
4.57 miles Central ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.60 miles Ridge PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.60 miles Cloud ParkInterested in this information?Contact us
4.61 miles Valley PlusInterested in this information?Contact us
4.70 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.72 miles Cloud TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.73 miles CoreInterested in this information?Contact us
4.86 miles 8217 Linton Hall (VA4) Digital Realty
4.86 miles CorScale: Gainesville 4
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
4.89 miles CorScale: Gainesville 5
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
4.93 miles CorScale: Gainesville 3
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
4.97 miles Data Center Edge District
The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
5.01 miles Campus PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.09 miles CorScale: Gainesville 2
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
5.15 miles Corscale: Gainesville 1
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
6.26 miles NTT: VA10
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
6.34 miles NTT: VA11
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
6.42 miles NTT: VA12
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
6.50 miles Compass: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
6.57 miles NTT: VA13
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
6.64 miles Gardner Property Project
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
6.65 miles John Marshall Commons Tech Park
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
6.71 miles Cloud StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.78 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.83 miles Valley AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.92 miles Ridge UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.16 miles QTS: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
8.31 miles Hub PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.56 miles Hub PlusInterested in this information?Contact us
8.70 miles Parkstone Tech Park
8.72 miles CyrusOne: Vint Hill
CyrusOne LLC, a data center developer and operator, submitted its first site plan to the county in March for an 870,000-square-foot data center campus.
8.77 miles CentralInterested in this information?Contact us
8.79 miles PointInterested in this information?Contact us
8.79 miles Center PrimeInterested in this information?Contact us
8.83 miles OVH: Vint Hill Bldg 1
This facility, situated on the grounds of a former Army base in Vint Hill, became OVHcloud's first U.S. data center and officially began operations in 2017.
8.93 miles OVH: Vint Hill Bldg 2
OVHcloud currently plans an expansion of its existing data center, which currently calls the Vint Hill Business Park home.
9.14 miles Headwaters: Catlett, VA
The Headwaters Site Development was a proposed $400 million data center project planned for a 67-acre site in the Catlett Station area of Fauquier County, Virginia.
9.43 miles Vint Hill Corners
The Vint Hill Corners data center campus proposal, submitted by a company called Vint Hill Corners LLC, which owns about 80 acres on Brookside Parkway, seeks to develop two one-story data centers on about 50 acres of property at 4295 Aiken Drive in Vint Hill.
9.66 miles Dulles South Innovation Center
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
9.85 miles Quantico Ridge Data Center
The Quantico Ridge data center project was effectively rejected and halted when the developer abruptly withdrew its rezoning application in May 2026.
9.88 miles Point BetaInterested in this information?Contact us
10.44 miles Global TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.45 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.58 miles ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.76 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.79 miles Penzance: Chantilly Premier
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
10.90 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.91 miles South PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.03 miles Park MaxInterested in this information?Contact us
11.03 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
11.23 miles Cloud StationInterested in this information?Contact us
11.26 miles ThreeInterested in this information?Contact us
11.29 miles South PointInterested in this information?Contact us
11.29 miles Plaza ThreeInterested in this information?Contact us
11.32 miles Starwood: Stonecroft Blvd, Chantilly
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
11.35 miles South HubInterested in this information?Contact us
11.36 miles CampusInterested in this information?Contact us
11.38 miles MaxInterested in this information?Contact us
11.42 miles Point ThreeInterested in this information?Contact us
11.45 miles Plaza AlphaInterested in this information?Contact us
11.66 miles Center OneInterested in this information?Contact us
11.69 miles Global CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.70 miles Core TowerInterested in this information?Contact us
11.71 miles Global ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.75 miles West HubInterested in this information?Contact us
11.83 miles ParkInterested in this information?Contact us
12.45 miles Global StationInterested in this information?Contact us
12.55 miles UltraInterested in this information?Contact us
12.56 miles Valley BetaInterested in this information?Contact us
12.64 miles CenterInterested in this information?Contact us
12.88 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
13.02 miles SouthInterested in this information?Contact us
13.08 miles EastInterested in this information?Contact us
13.14 miles Cloud CenterInterested in this information?Contact us
13.22 miles PowerHouse: Arcola Bldg A
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
13.25 miles PowerHouse: Arcola Bldg B
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
13.27 miles Station BetaInterested in this information?Contact us
13.30 miles Metro PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.31 miles ProInterested in this information?Contact us
13.33 miles Metro StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.35 miles TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.40 miles Point OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.46 miles JK Land: Technology Park 3
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
13.47 miles Point MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.47 miles Campus AlphaInterested in this information?Contact us
13.49 miles Point PrimeInterested in this information?Contact us
13.55 miles Plaza ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.55 miles Yondr: Arcola Expansion
Yondr is planning to expand capacity on an adjacent parcel of land.
13.56 miles UltraInterested in this information?Contact us
13.57 miles EastInterested in this information?Contact us
13.60 miles Park UltraInterested in this information?Contact us
13.62 miles JK Land: Technology Park 2
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
13.67 miles Yondr: Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
13.68 miles Hiddenwood Assemblage Campus
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
13.70 miles Campus MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.71 miles Global ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.73 miles Station ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.74 miles Yondr: Arcola Bldg 1
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
13.81 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.84 miles Plaza ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.85 miles East ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.91 miles Ridge BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.03 miles Tower BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.08 miles JK Land: Technology Park 1
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
14.08 miles Tower BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.15 miles JK Land: Tech Park 1 Expansion
14.15 miles CyrusOne: NVA9 Bldg-1A
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
14.15 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.16 miles Campus ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.21 miles CyrusOne: NVA9 Bldg-2
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
14.22 miles CyrusOne: NVA9 Bldg-1B
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
14.31 miles Stack: Loudoun 2
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
14.33 miles Stack: Loudoun 1
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
14.34 miles Digital Realty Dulles Expansion
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
14.40 miles Digital Realty: IAD44
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
14.44 miles Prologis: Sterling, VA
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
14.50 miles Digital Realty: IAD45
This facility is part of the Digital Dulles Campus in Sterling, VA.
14.94 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
15.00 miles Metro HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.01 miles Maple Tree Farm
A 145-acre property known as Maple Tree Farm, located just east of Warrenton, is being marketed as a potential data center location.
15.46 miles CoreSite: VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
15.61 miles Hyperscale Data CenterInterested in this information?Contact us
15.66 miles Hyperscale Data CenterInterested in this information?Contact us
15.68 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
15.74 miles Hyperscale Data CenterInterested in this information?Contact us
15.74 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
15.74 miles CoreSite: VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
15.77 miles Hyperscale Data CenterInterested in this information?Contact us
15.82 miles CoreSite: VA2
15.97 miles Dulles 2000 Campus
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
16.09 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
16.09 miles Equinix Herndon DC97
Equinix DC97 is a leased colocation data center at 460 Springpark Place in Herndon, Virginia. Terremark opened it in 2005 as a regional exchange; Verizon acquired Terremark in 2011 and sold the site to Equinix in 2017.
16.14 miles Csquare: Dulles IAD3
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
16.18 miles H5: Herndon
16.25 miles Lumen Herndon 3
16.26 miles Lumen Herndon 1
16.32 miles North StationInterested in this information?Contact us
16.37 miles East ValleyInterested in this information?Contact us
16.42 miles Plaza MaxInterested in this information?Contact us
16.42 miles Prime PlazaInterested in this information?Contact us
16.50 miles NorthInterested in this information?Contact us
16.52 miles Prologis: Global Plaza Rd
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
16.53 miles ValleyInterested in this information?Contact us
16.55 miles Global ParkInterested in this information?Contact us
16.60 miles Centersquare: IAD2-B
16.61 miles GlobalInterested in this information?Contact us
16.62 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
16.62 miles Plaza PrimeInterested in this information?Contact us
16.63 miles Centersquare: IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
16.63 miles Park TwoInterested in this information?Contact us
16.63 miles Point ProInterested in this information?Contact us
16.64 miles CyrusOne Northern Virginia Sterling IV
16.65 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
16.65 miles East ParkInterested in this information?Contact us
16.67 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
16.69 miles Aligned IAD03
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
16.72 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
16.74 miles ThreeInterested in this information?Contact us
16.75 miles Prologis: Executive Drive
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
16.82 miles Metro StationInterested in this information?Contact us
16.84 miles ProInterested in this information?Contact us
16.85 miles North PlazaInterested in this information?Contact us
16.85 miles Peterson: Silverbrook
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
16.85 miles SDC: Import Plaza C
Building C is a single-story, 14,160 sq ft support building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, leased to Amazon Web Services as IAD-606.
16.85 miles Campus PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.88 miles Edge CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.88 miles SDC: Import Plaza D
Building D is a planned 20,000 sq ft server storage building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, approved by Loudoun County in June 2026.
16.88 miles Station ProInterested in this information?Contact us
16.90 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.90 miles SDC: Import Plaza B
Building B is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2022 and leased to Amazon Web Services as IAD-162.
16.90 miles SDC: Import Plaza A
Building A is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2021 and leased to Amazon Web Services as IAD-161.
16.91 miles AlphaInterested in this information?Contact us
16.91 miles SDC: Low Latency Lane Expansion
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.
16.92 miles SDC: Low Latency Lane 2
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
16.94 miles Valley BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.94 miles ThreeInterested in this information?Contact us
16.96 miles West PlazaInterested in this information?Contact us
16.97 miles QTS: ASH2 DC2
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
17.00 miles SDC: Low Latency Lane 1
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
17.00 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
17.01 miles QTS Ashburn-Shellhorn DC1
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
17.02 miles QTS: ASH2 DC1
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
17.02 miles Core PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.05 miles Digital Realty: IAD55
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
17.08 miles QTS Ashburn-Shellhorn DC2
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
17.08 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.08 miles EdgeCore: Ashburn AS02
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
17.12 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.15 miles 44060 Digital Loudoun Plaza (Bldg K)
17.17 miles 43940 Digital Loudoun Plaza (Bldg G)
17.19 miles UltraInterested in this information?Contact us
17.20 miles Campus GammaInterested in this information?Contact us
17.20 miles Edge RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.20 miles Stack: NVA04A
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
17.23 miles 44100 Digital Loudoun Plaza (Bldg J)
17.24 miles 43780 Digital Loudoun Plaza (Bldg H)
17.26 miles 43881 Devin Shafron (Bldg B)
17.27 miles Connect Data Centers: Sterling, VA
17.29 miles 43831 Devin Shafron (Bldg C)
17.29 miles Stack: NVA04B
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
17.29 miles Park GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.30 miles Valley OneInterested in this information?Contact us
17.31 miles 43915 Devin Shafron (Bldg A)
17.32 miles CloudHQ: LC8
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
17.33 miles East RidgeInterested in this information?Contact us
17.33 miles CloudHQ: LC4
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
17.33 miles 43791 Devin Shafron (Bldg D)
17.37 miles Vantage VA16
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
17.38 miles South PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.38 miles Stack: NVA04C
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
17.40 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
17.41 miles Menlo: MD-DC2 (Sterling)
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
17.41 miles Vantage VA15
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
17.41 miles 43830 Devin Shafron (Bldg F)
17.41 miles Deft: DRT-IAD1
17.41 miles Vantage: VA23
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
17.43 miles Vantage: VA21
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
17.43 miles CloudHQ: LC10
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
17.44 miles CloudHQ: LC9
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
17.44 miles Active Infra: Spring Valley 1
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
17.45 miles 43790 Devin Shafron (Bldg E)
17.46 miles Digital Realty: IAD43
17.49 miles Vantage: VA22
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
17.50 miles PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.52 miles CloudHQ: LC12
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
17.52 miles Sentinel: Cloud Plaza, Sterling, VA
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
17.52 miles CloudHQ: LC13
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
17.61 miles CloudHQ: LC14
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
17.61 miles Vantage VA12
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
17.62 miles PowerHouse: Pacific Bldg C
PowerHouse Pacific Building C is a three-story, 352,000 sq ft hyperscale data center shell under construction at 22279 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
17.63 miles CloudHQ: LC11
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
17.66 miles PowerHouse: Pacific Bldg B
PowerHouse Pacific Building B is a three-story, 354,000 sq ft hyperscale data center shell under construction at 22214 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
17.66 miles Vantage VA11
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
17.67 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
17.68 miles Vantage VA14
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
17.69 miles Vantage VA13
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
17.70 miles Digital Realty: Broderick Drive
17.73 miles 44372 Round Table: Digital Realty
17.76 miles PowerHouse: Pacific Bldg A
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.
17.77 miles 44274 Round Table (Bldg L)
17.78 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
17.82 miles CloudHQ: LC5
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
17.87 miles 44751 Round Table (Bldg P)
17.89 miles Aligned: IAD-02
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
17.92 miles Regency DC Campus Ashburn
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
17.94 miles CloudHQ: LC1B
17.96 miles CloudHQ: LC1A
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
17.96 miles Quantum Connect: Ashburn, VA
A data center is under construction at the Quantum business park in Ashburn, Virginia.
18.00 miles Dulles 28 Technology Park
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
18.02 miles Equinix DC13
Equinix DC13 is a colocation data center on the former UUNET campus at 21830 UUNET Way in Ashburn, Virginia, built in 2000 and acquired from Verizon in 2017.
18.03 miles CloudHQ: LC3
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
18.09 miles CloudHQ LC2
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
18.10 miles Aligned: IAD-01
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
18.11 miles 21744 Sir Timothy Drive (ACC10)
18.11 miles Sabey Intergate: Ashburn Bldg-A
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
18.13 miles Sabey Intergate: Ashburn Bldg-B
18.14 miles Equinix DC21
Equinix DC21 is a two-story colocation data center at 22175 Beaumeade Circle in Ashburn, Virginia, that opened in Q4 2020 and grew in phases through Q3 2023.
18.17 miles Active Infra: Spring Valley Expansion
18.19 miles DataCanopy: Ashburn 1
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
18.20 miles 21745 Sir Timothy (ACC9) Digital Realty
18.21 miles DataBank Ashburn IAD1
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
18.21 miles Sabey Intergate: Ashburn Bldg-C
Intergate.Ashburn is a purpose-built data center campus on 38 acres
18.21 miles DataBank Ashburn IAD4
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
18.22 miles FastServ Ashburn
18.26 miles Digital Realty: IAD-56
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
18.27 miles NTT: VA7
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
18.27 miles Equinix: DC22
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
18.28 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
18.31 miles Equinix Ashburn DC6
Equinix DC6 is a two-story colocation data center at 21721 Filigree Court on Equinix's Ashburn, Virginia campus that opened in July 2010.
18.31 miles Equinix Ashburn DC11
Equinix DC11 is a two-story colocation data center at 21721 Filigree Court, the final building on Equinix's Ashburn, Virginia campus, opened in January 2013.
18.31 miles Lightedge: Ashburn
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
18.34 miles NTT: VA6
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
18.35 miles Equinix Ashburn DC5
Equinix DC5 is a single-story colocation data center at 21701 Filigree Court on Equinix's Ashburn, Virginia campus that opened in Q2 2008.
18.35 miles Equinix Ashburn DC1
Equinix DC1 at 21711 Filigree Court in Ashburn, Virginia, opened in July 1999 as Equinix's first data center and anchors its Ashburn campus.
18.36 miles Cologix: Ashburn Expansion (Beaumeade Circle)
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
18.36 miles DataBank Ashburn IAD3
18.37 miles NTT: VA9
18.38 miles Equinix Ashburn DC4
Equinix DC4 is a single-story colocation data center at 21691 Filigree Court on Equinix's Ashburn, Virginia campus that opened in Q1 2007.
18.40 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
18.40 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
18.41 miles Plaza TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.42 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
18.44 miles NTT VA5
18.45 miles West ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.47 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
18.49 miles Core ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.50 miles Cologix: ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
18.50 miles Dulles 28 Centre Motorplex
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
18.53 miles Paragon Park Lot 3B
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
18.55 miles NTT: VA8
18.56 miles 21710 Charles View
18.56 miles NorthInterested in this information?Contact us
18.58 miles NTT VA4
18.60 miles Cologix: ASH2
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
18.62 miles 44521 Hastings (ACC5) Digital Realty
18.63 miles 44520 Hastings (ACC3) Digital Realty
18.66 miles PowerHouse ABX1
18.69 miles Rackspace Ashburn IAD3
18.69 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
18.69 miles Cyrusone: Beaumeade Circle
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
18.70 miles 44490 Chilum (ACC2): Digital Realty
18.73 miles TowerInterested in this information?Contact us
18.74 miles 21641 Charles View
18.76 miles 44470 Chillum - Digital Realty
18.77 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
18.77 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
18.80 miles Lumen Ashburn
18.82 miles Digital Realty: 21561 Beaumeade Cir
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
18.82 miles Centersquare: Ashburn WDC1
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
18.83 miles CenterInterested in this information?Contact us
18.83 miles Cogent Vienna
18.85 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
18.87 miles DataCanopy: Ashburn 2
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
18.89 miles Equinix DC15
Equinix DC15 is a two-story colocation data center at 44780 Performance Circle in Ashburn, Virginia, that opened in Q2 2020 and doubled with a second phase in Q4 2021.
18.90 miles NorthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.93 miles 8100 Boone - Digital Realty
18.94 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
18.95 miles PointOne: IAD2
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
18.96 miles Equinix Vienna DC7
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC7 in Q2 2026.
18.99 miles Element Critical VA1
18.99 miles Equinix DC16
Equinix DC16 is a four-story colocation data center at 44740 Performance Circle in Ashburn, Virginia, that opened in Q4 2023 and added two more phases in 2025.
18.99 miles NTT VA2
18.99 miles Center PlusInterested in this information?Contact us
19.03 miles Equinix: DC17
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
19.04 miles South StationInterested in this information?Contact us
19.05 miles Equinix: DC18
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
19.11 miles Equinix Vienna DC8
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC8 in Q4 2020.
19.14 miles Core TowerInterested in this information?Contact us
19.15 miles OneInterested in this information?Contact us
19.16 miles DataCanopy: Sterling, VA
Data Canopy colocation space in Sterling, Virginia, with private and multi-tenant cages.
19.17 miles PlazaInterested in this information?Contact us
19.18 miles CyrusOne: NVA5
19.20 miles OneInterested in this information?Contact us
19.24 miles CyrusOne Sterling VIII
19.26 miles GlobalInterested in this information?Contact us
19.27 miles EdgeCore Ashburn
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
19.29 miles Washington Commanders: Ashburn, VA
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
19.30 miles RidgeInterested in this information?Contact us
19.32 miles CyrusOne: NVA7
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
19.32 miles Hyperscale Data CenterInterested in this information?Contact us
19.32 miles EastInterested in this information?Contact us
19.33 miles CyrusOne: Broadlands Expansion
19.34 miles COPT: 45761 Maries Rd
19.34 miles South CampusInterested in this information?Contact us
19.35 miles PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.35 miles COPT: 45771 Maries Rd
19.36 miles CyrusOne: Broadlands Boulevard 1
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
19.38 miles Centersquare: Sterling DC2
19.39 miles Centersquare: Sterling DC3
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
19.42 miles TA Realty: Sterling, Virginia
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
19.46 miles PointOne: Ashburn
The campus will have 2 buildings
19.48 miles Point OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.48 miles Centersquare: Sterling DC4
19.49 miles 21110 Ridgetop
The site is fully leased to triple net tenants.
19.51 miles Kyndryl: Sterling
19.52 miles Hub BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.53 miles CyrusOne Northern Virginia Sterling I, II, III
19.56 miles Point ThreeInterested in this information?Contact us
19.57 miles Park GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.61 miles Park UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.66 miles Park ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.72 miles DataBank McLean IAD2
In 2020, DataBank acquired the site from zColo.
19.77 miles Valley ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.78 miles Point TwoInterested in this information?Contact us
19.78 miles Lumen McLean 1
19.86 miles CoreInterested in this information?Contact us
19.99 miles Farkas Family: Leesburg, VA
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.

QTS: Manassas 1 DC3 Data Center Photos See all

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.

QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.

History:

  • On August 31, 2021 funds managed by Blackstone completed the acquisition of QTS Realty Trust.
  • April 30, 2019: Acquired two operating data centers in Groningen and Eemshaven, Netherlands, for approximately $44 million.
  • June 2015: QTS acquires Carpathis Hosting for $326 million. The transaction increases QTS's ability to serve IaaS and Government clients. Additionally the transaction provides a number of deployments within Equinix facilities.
  • July 8, 2014: Acquired the former Chicago Sun-Times printing plant for conversion to a data center.
  • June 30, 2014: Acquired the Princeton, New Jersey data center from McGraw Hill Financial.
  • 2013: Went public (IPO) and started trading under the symbol QTS on the NYSE.
  • 2010 Acquired their Richmond facility
  • 2005 QTS acquired Atlanta Suwanee data center
  • 2003: Company acquired its first data center in Overland Park, KS
  • 2003: QTS was founded by Chad Williams with its first data center in Overland Park in Kansas
0
Facilities
0
Markets

News See all

Read Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium
State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's grow...

Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium

October 15, 2026 Virginia

State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's growth in the world's largest data center market. Senate Bill 843 would take effect July 1, 2027 and...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read QTS Drops Plan for Data Center near Madison, Wisconsin
QTS Drops Plan for Data Center near Madison, Wisconsin

QTS Drops Plan for Data Center near Madison, Wisconsin

January 30, 2026 QTS Data Centers

QTS has backed off plans to develop a data center near Madison, Wisconsin, after pushback from local officials. The company has dropped plans for a campus in the Village of DeForest after the village announced its intention to deny an annexation request related to the project.“After individual...

Read more
Read QTS Starts Preparation for $13bn UK data center
QTS Starts Preparation for $13bn UK data center

QTS Starts Preparation for $13bn UK data center

October 10, 2025 QTS Data Centers

QTS has begun site work on a massive data center project in Northumberland, UK which could see an investment of up to £10 billion ($13.2bn) across 10 facilities if fully built out. This March, the project received outline planning permission from the local council. After initially being pitched...

Read more
Read QTS Plans Data Center in Forssa, Finland
QTS Plans Data Center in Forssa, Finland

QTS Plans Data Center in Forssa, Finland

August 20, 2025 QTS Data Centers

Data center firm QTS is expanding its European footprint with plans for a campus in Finland. The City of Forssa signed a preliminary agreement earlier this year with QTS for more than 100 hectares of land in Ratasmäki. "The interest of a large investor like Blackstone in Forssa is very good news....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?