Karis Plans Potential Data Center Project in Central Ohio
April 14, 2026
Karis Critical
This planned facility would be part of Karis Critical's Hoffman Estates Campus in Chicago, Illinois.
| Distance | Site | About |
|---|---|---|
| 0.13 miles | Karis: Hoffman Estates Campus |
Karis Critical purchased 180 acres of land in the Hoffman Estates area from 5a7 for $45 million.
|
| 1.63 miles | Compass Hoffman Estates |
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
|
| 2.83 miles | Hyperscale Data Center Request Dataset |
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
| 2.84 miles | Hyperscale Data Center Request Dataset |
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
| 3.03 miles | Hyperscale Data Center Request Dataset |
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
| 3.09 miles | Hyperscale Data Center Request Dataset |
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
| 6.57 miles | Complete Source Schaumburg | |
| 9.38 miles | Nexstar: Elk Grove |
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
|
| 9.38 miles | Nexstar: Elk Grove Bldg 4 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 9.47 miles | Nexstar: Elk Grove Bldg 2 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 9.58 miles | Nexstar: Elk Grove Bldg 3 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 11.24 miles | Aligned: ORD-03 |
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
|
| 11.38 miles | Aligned: ORD-04 |
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
|
| 11.46 miles | NTT: CH2 |
This facility is a part of NTT's Chicago data center campus in Illinois.
|
| 11.50 miles | NTT Chicago CH1 |
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
|
| 11.51 miles | NTT: CH3 |
This facility is a part of NTT's Chicago data center campus in Illinois.
|
| 11.56 miles | NTT: Chicago CH5 |
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
|
| 11.59 miles | NTT: Chicago CH4 |
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
|
| 11.89 miles | T5 Chicago II |
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
|
| 11.96 miles | Hyperscale Data Center Request Dataset |
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 12.01 miles | Hyperscale Data Center Request Dataset |
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 12.02 miles | Hyperscale Data Center Request Dataset |
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 12.41 miles | Connect Data Centers: Chicago |
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
|
| 12.45 miles | Prime: ORD01-02 |
Building B will be another three-story construction, offering 279,360 gross square feet of space.
|
| 12.52 miles | Prime: ORD01-03 |
Building C will be another three-story construction, offering 294,429 gross square feet of space.
|
| 12.54 miles | Prime Elk Grove |
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
|
| 12.60 miles | Hyperscale Data Center Request Dataset | |
| 12.60 miles | CloudHQ: Mount Prospect ORD1 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 12.70 miles | STACK CHI01B |
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
| 12.72 miles | CloudHQ Mount Prospect ORD3 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 12.72 miles | DigiCo: Chicago |
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
|
| 12.76 miles | CenturyLink: Arlington Heights | |
| 12.79 miles | CloudHQ: Mount Prospect ORD2 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 12.80 miles | STACK Chicago CHI01 |
|
| 12.96 miles | Stack: CHI02 |
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
|
| 13.13 miles | Stream: Chicago III |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 13.17 miles | 1450 E Devon Ave (CH3) DRT | |
| 13.18 miles | Stream: Chicago III DC3 |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 13.21 miles | Stream: Chicago III DC2 |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 13.25 miles | 2200 Busse Rd (CH1) DRT | |
| 13.27 miles | Deft: Elk Grove DF-CH1 |
|
| 13.27 miles | HostPapa CH1 |
Formerly known as "ColoCrossing CH1"
|
| 13.27 miles | Digital Elk Grove Village Campus |
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
| 13.28 miles | Rackspace Elk Grove ORD1 | |
| 13.30 miles | Stream Chicago II |
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
|
| 13.40 miles | Equinix Chicago CH3 |
|
| 13.45 miles | 2299 Busse (CH2) Digital Realty |
|
| 13.45 miles | Equinix: CH5 |
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
|
| 13.50 miles | EdgeConneX CHI02 | |
| 13.51 miles | Stream Chicago I |
Free-Standing, Data Center Designed to Tier III Standards
|
| 13.55 miles | Centersquare: Chicago ORD2 |
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
| 13.59 miles | EdgeConneX: CHI03 |
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
|
| 13.61 miles | EdgeConneX CHI01 |
|
| 13.79 miles | Element Critical CH1 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
| 13.80 miles | Element Critical CH2 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
| 13.81 miles | CyrusOne: Wood Dale CHI6 |
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
|
| 13.83 miles | DataBank ORD3 Mount Prospect |
|
| 13.83 miles | Colocation America CH3 | |
| 13.85 miles | T5: Chicago V |
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
|
| 14.10 miles | TA Realty: Elk Grove |
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
|
| 14.23 miles | Apotech: Illinois 1 |
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
|
| 14.44 miles | SBA Edge: 603 Discovery |
Former New Continuum site that was acquired in 2019
|
| 15.84 miles | Crypto Mining Data Center Request Dataset |
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
|
| 16.73 miles | Iron Mountain Chicago |
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
|
| 17.46 miles | T5: Chicago lll |
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
|
| 17.53 miles | T5: Grayslake, Illinois |
T5 Data Centers is developing a new data center campus in Grayslake, Illinois, about 40 miles northwest of Chicago.
|
| 17.86 miles | Hyperscale Data Center Request Dataset |
|
| 18.07 miles | CyrusOne: Lombard CHI5 |
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
| 18.24 miles | 505 N Railroad Ave - Digital Realty |
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
| 18.28 miles | Aligned Chicago ORD-01 |
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
| 18.29 miles | Aligned ORD-02 |
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
|
| 18.64 miles | NetSource Chicago | |
| 18.67 miles | Digital Fortress: Chicago Lombard | |
| 18.68 miles | 360TCS-Lombard | |
| 19.02 miles | Karis: Naperville, IL |
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
|
| 19.07 miles | Edged Energy: Aurora ORD01 |
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
| 19.19 miles | Edged Energy: Chicago ORD02 |
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
| 19.30 miles | Edged Energy: Chicago ORD03 |
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
|
| 19.33 miles | Cogent Naperville | |
| 19.39 miles | CyrusOne: Aurora III (CHI3) |
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
| 19.46 miles | CyrusOne: CHI3 DC2 |
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
| 19.77 miles | DataCanopy: Chicago, IL | |
| 19.78 miles | CyrusOne: Aurora CHI2 |
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
|
| 19.79 miles | CyrusOne Chicago Aurora CME |
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
| 19.87 miles | Centersquare: Lisle CHI1 |
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
|
| 19.91 miles | CyrusOne: CHI2 DC2 |
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
|
| 20.00 miles | Digital Realty: ORD15 |
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
|
April 14, 2026
Karis Critical
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas