░░░░░░ Login to view SqFt Gross Colocation Size
░░░ Contact Us to subscribe to our data service MW Total Power
Distance | Site | About |
---|---|---|
0.00 miles | Digital Elk Grove Village Campus |
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
0.00 miles | HostPapa CH1 |
Formerly known as "ColoCrossing CH1"
|
0.02 miles | 2200 Busse Rd (CH1) DRT | |
0.02 miles | Rackspace Elk Grove ORD1 | |
0.12 miles | 1450 E Devon Ave (CH3) DRT | |
0.20 miles | 2299 Busse (CH2) Digital Realty |
|
0.28 miles | Centersquare: Chicago ORD2 |
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
0.39 miles | Stream Chicago II |
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
|
0.60 miles | Equinix Chicago CH3 |
|
0.65 miles | Skybox Chicago I | |
0.69 miles | EdgeConneX CHI02 | |
0.73 miles | EdgeConneX CHI01 |
|
0.78 miles | CoreWeave: US Central ORD1 | |
0.78 miles | Stream Chicago I |
|
0.86 miles | STACK Chicago CHI01 |
|
0.90 miles | STACK CHI01B |
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
1.30 miles | Element Critical CH1 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
1.48 miles | Element Critical CH2 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
1.98 miles | Prime Elk Grove |
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
|
2.00 miles | Prime: ORD1 Bldg B |
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
|
2.06 miles | Prime: ORD1 Bldg C |
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
|
2.08 miles | T5 Chicago II |
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
|
2.19 miles | NTT: 1250 N Arlington Heights (Planned) |
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
|
2.19 miles | NTT: 1200 N Arlington Heights (Planned) |
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
|
2.55 miles | NTT Chicago CH1 |
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
|
2.58 miles | CenturyLink: Arlington Heights | |
2.83 miles | CloudHQ: Mount Prospect ORD2 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
2.83 miles | CloudHQ: Mount Prospect ORD1 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
2.94 miles | Aligned: ORD-03 |
Aligned is about to build a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International. The company’s plan for the 36-acre site calls for a pair of two-story, 520,000-square-foot data centers.
|
2.95 miles | CloudHQ Mount Prospect ORD3 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
4.30 miles | Iron Mountain Chicago |
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
|
4.80 miles | T5 Northlake IL |
T5 Data Center is expanding its footprint in Chicago. T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 300,000 sq ft facility for multi-tenant or single-tenant operations.
|
5.51 miles | Microsoft Chicago Northlake |
|
5.79 miles | 505 N Railroad Ave - Digital Realty |
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
6.05 miles | Aligned Chicago ORD-01 |
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
6.05 miles | DataBank ORD3 Mount Prospect |
|
6.05 miles | Colocation America CH3 | |
6.08 miles | Aligned ORD-02 |
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus, ORD-02 offers exceptional connectivity at the convergence of over 12 metro/long-haul networks. At full build, ORD-02 building will provide 36MW of critical load capacity expandable to ~52 MW.
|
6.96 miles | Complete Source Schaumburg | |
6.98 miles | Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty |
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
|
6.99 miles | 9377 Grand Ave | |
7.01 miles | 9355 Grand Ave | |
7.06 miles | 9333 Grand Ave (DRT) | |
7.06 miles | SingleHop Chicago | |
7.09 miles | Tierpoint Chicago West | |
9.94 miles | LexusNexis Oak Brook | |
9.94 miles | DataBank (ORD4) Oak Brook |
|
9.94 miles | Verizon: Swift Dr |
|
10.30 miles | Server Farm Oak Brook |
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
10.30 miles | US Signal Oakbrook |
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
10.30 miles | Verizon: (Oak Brook) | |
10.36 miles | Digital Fortress: Chicago Lombard | |
10.36 miles | 360TCS-Lombard | |
10.37 miles | NYI Chicago (Oak Brook) | |
10.43 miles | Microsoft Hoffman Estates 2 |
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
10.57 miles | Microsoft Hoffman Estates 1 |
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
10.61 miles | CyrusOne Chicago Lombard |
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
11.04 miles | Lumen Broadview | |
12.57 miles | Equinix Chicago CH7 |
|
14.49 miles | Compass Hoffman Estates | |
14.91 miles | Centersquare: Lisle CHI1 |
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
|
16.17 miles | Cogent Naperville | |
16.86 miles | New Continuum: 603 Discovery | |
17.31 miles | Metro Edge: Illinois Medical District (IMD) |
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
|
17.44 miles | NetSource Chicago | |
17.60 miles | Lumen Chicago 2 | |
17.71 miles | Lumen Chicago 4 | |
18.27 miles | Lumen Chicago 1 |
|
18.27 miles | EXA - 111 North Canal |
Former GTT suite
|
18.41 miles | Lumen Chicago 6 |
|
18.44 miles | QTS Chicago |
The campus was a former Sun Times Press Facility and was acquired in 2014
|
18.46 miles | TierPoint Chicago Polk |
|
18.48 miles | First Communications Chicago | |
18.49 miles | Lumen Chicago 3 |
|
18.63 miles | Server Farm Realty 840 South Canal |
4 MW Critical Load on Each Floor (Floors 1-5)
130-160 Watts per Raised Floor SF
|
18.63 miles | DataBank (ORD2) 840 S Canal |
|
18.66 miles | Cogent: 216 W Jackson | |
18.84 miles | Verizon: 140 S Dearborn | |
18.86 miles | CoreSite Chicago CH2 |
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
|
18.86 miles | QuadraNet Chicago | |
18.87 miles | 365 Chicago |
The site is a former Switch and Data site (also owned by Equinix for a short period.)
|
18.87 miles | InfoRelay Chicago | |
18.87 miles | CoreSite Chicago CH1 |
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
|
18.87 miles | Cogent: 427 S LaSalle | |
18.88 miles | Netrality Chicago: 717 S Wells |
The 10 story building was constructed in 1923 and eventually was converted into a data center.
|
18.89 miles | Steadfast Chicago 725 Wells |
|
18.89 miles | Atlantic Metro ORD3 | |
18.89 miles | Crown Castle 725 S Wells |
|
18.89 miles | Colo@ Chicago |
|
18.89 miles | 725 S Wells - 1547 Critical Systems |
1547 Acquired the site in December of 2018.
|
18.99 miles | Colocation America CH2 | |
18.99 miles | Lumen Chicago 5 | |
18.99 miles | Cogent: 600 S Federal | |
18.99 miles | 600 S Federal - Digital Realty | |
19.31 miles | Edged Energy: Aurora, Chicago |
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
|
19.45 miles | Edged Energy: Chicago ORD02 |
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
|
19.57 miles | Edged Energy: Chicago ORD03 |
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
|
19.71 miles | CyrusOne: Bilter Road campus |
CyrusOne plans to develop a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
19.82 miles | CyrusOne: Bilter Rd Bldg 2 |
CyrusOne plans to develop a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
19.87 miles | CyrusOne Chicago Aurora CME |
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
19.91 miles | CyrusOne: Aurora CHI2 |
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
|
Founded in 1999 as a small hosting company and has grown into a fast growing managed hosting, cloud and colocation company. ServerCentral Turing Group (SCTG) is a SOC 2 Type II audited company and PCI-DSS compliant.
In 2018, ServerCentral acquired Turing Group and became known as ServerCentral Turing Group (SCTG).
In 2021, the company was rebranded to Deft
Name | Date Added | Description |
---|---|---|
![]() |
November 2019 |
SCTG Elk Grove Data Sheet (PDF) |